ML19289C564
| ML19289C564 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 12/13/1978 |
| From: | Staffa R GEORGIA POWER CO. |
| To: | Sutherland J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19289C560 | List: |
| References | |
| NUDOCS 7901170335 | |
| Download: ML19289C564 (1) | |
Text
1
^.; a Pu a er Cc.;
f
- r, t
o f en :
i e b'. = 4 tJ}0 4 P
.,'(l*
- i3a n'
re n e p-
"t'
> + DhD L
Power Supply Engineering and Serv hts U
CaCOrgill PC)\\\\'er ai;
- December 13, 1978
,[,
United States Nuclear Regulatory Comnission Office of Inspection and Enforcement
REFERENCE:
Region II - Suite 3100 RII: CMH 101 Marietta Street 50-321/78-34 Atlanta, Georgia 30303 50-366/78-42 ATTENTION:
Mr. J. T.
Sutherland Gcntlemen:
The Georgia Power Conpany offers the following informatien in response to your letter dated November 24, 1978, describing an apparent noncompliance with NRC requirements noted during your October 17-20, 1978, inspection of the llatch Nuclear Plant.
During the inspection it was observed that startup procedure HNP-2-10090, which requires neutron survey instruments to be source checked tc a i 20%
accuracy before use, was not followed.
Since this occurrence, the following corrective steps have been taken.
The neutron survey instrument used during the radiation surveys identi-fied in the inspection report have been checked and found to be within the 1 20% accuracy requirement.
In the future, all neutron survey instruments will be source checked prior to their being used to carry out the intent of procedure UNP-2-10090.
In order to assure t at *:he same problem does not occur in the future, all parties involved have been instructed concerning the aspects of correctly fol-lowing the procedure.
Full compliance was achieved on October 26, 1978.
The inspection report contains no information which is believed to be pro-prietary.