Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20216G935 + (15:12:19, 3 December 2024)
- ML20216G932 + (15:12:20, 3 December 2024)
- BSEP-98-0025, Forwards 1997 Annual Personnel Exposure Rept for Brunswick Steam Electric Plant.W/O Encls + (15:12:21, 3 December 2024)
- ML20216G927 + (15:12:21, 3 December 2024)
- IR 05000382/1997007 + (15:12:22, 3 December 2024)
- 05000354/LER-1987-004-03, :on 870610,north Plant Vent High Flow Sample Pump Inoperable for More than 72 H.Caused by Equipment Failure.Spare Parts for Equipment Problem on Order & Should Be Installed by 870627 + (15:12:25, 3 December 2024)
- ML20216G920 + (15:12:26, 3 December 2024)
- ML20216G919 + (15:12:27, 3 December 2024)
- ML20216G917 + (15:12:27, 3 December 2024)
- ML20216G913 + (15:12:28, 3 December 2024)
- ML20216G909 + (15:12:30, 3 December 2024)
- ML20216G907 + (15:12:31, 3 December 2024)
- ML20216G903 + (15:12:32, 3 December 2024)
- ML20216G905 + (15:12:32, 3 December 2024)
- ML20216G898 + (15:12:33, 3 December 2024)
- ML20216G893 + (15:12:37, 3 December 2024)
- ML20216G891 + (15:12:38, 3 December 2024)
- ML20216G890 + (15:12:39, 3 December 2024)
- ML20216G886 + (15:12:40, 3 December 2024)
- ML20216G885 + (15:12:40, 3 December 2024)
- CY-98-060, Provides Response to Violations Noted in Insp Rept 50-213/97-06.Corrective Actions:During Jul 1997,senior Station Mgt Held Meetings W/Health Physics Technicians to Stress Procedure Adherence + (15:12:41, 3 December 2024)
- A98013, Requests NRC Approval of Certified Fuel Handler Training & Retraining Program.Copy of Zion Proposed Certified Fuel Handler Training & Retraining Program Contained in Attachment a + (15:12:42, 3 December 2024)
- ML20216G881 + (15:12:42, 3 December 2024)
- 05000454/LER-1997-015-03, :on 970813,containment Penetration Test,Vent & Drain Valves Were Not Surveilled within 31 Days.Caused by Difference in Interpretation of Regulations.Surveillance Applied to All Valves + (15:12:44, 3 December 2024)
- ML20216G875 + (15:12:45, 3 December 2024)
- ML20216G874 + (15:12:46, 3 December 2024)
- ML20216G869 + (15:12:48, 3 December 2024)
- ML20216G867 + (15:12:50, 3 December 2024)
- A98033, Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 2 + (15:12:51, 3 December 2024)
- ML20216G858 + (15:12:52, 3 December 2024)
- ML20216G856 + (15:12:53, 3 December 2024)
- ML20216G854 + (15:12:54, 3 December 2024)
- ML20216G852 + (15:12:54, 3 December 2024)
- 05000259/LER-1997-003-04, :on 970812,potential for Containment Pressure to Exceed Design During Purging or Inerting If LOCA Occurred Due to Unanalyzed Suppression Pool Bypass Path Was Noted. Caused by Design Error.Revised Sys Operating Instructions + (15:12:56, 3 December 2024)
- ML20216G845 + (15:12:57, 3 December 2024)
- ML20216G847 + (15:12:57, 3 December 2024)
- B17128, Forwards Response to Request for Addl Info Re Proposed Rev to TS Reactor Coolant Sys Heatup/Cooldown Limits & Low Temp Overpressure Protection + (15:12:58, 3 December 2024)
- ML20216G838 + (15:12:59, 3 December 2024)
- B17009, Submits Summary of Changes to Errors in ECCS Evaluation Models or Applications of Models for Unit 3 + (15:13:00, 3 December 2024)
- ML20216G834 + (15:13:00, 3 December 2024)
- ML20216G830 + (15:13:01, 3 December 2024)
- SVP-98-130, Responds to NRC Re Violations Noted in Insp Repts 50-254/97-28 & 50-265/97-28.Corrective Actions:Qcop 6600-01 Was Revised to Require Performance of Qcos 5750-09 to Ensure Adequate Flow When Affected Valve Has Been Manipulated + (15:13:02, 3 December 2024)
- 3F0498-15, Forwards Response to Violations Noted in Insp Rept 50-302/98-02.Corrective Actions:Listing of Plant Equipment Utilized for in-plant Actions,By Tag Number Equipment Noun Name & Plant Location,Compiled from Review of Each EOP + (15:13:03, 3 December 2024)
- ML20216G820 + (15:13:05, 3 December 2024)
- ML20216G818 + (15:13:05, 3 December 2024)
- BSEP-98-0060, Informs That OAP-025, Bnp Integrated Scheduling, Will Be Revised to Clearly Establish Restrictions on Removing DG from Svc Concurrent W/Other High Safety Significant Sys as Listed + (15:13:06, 3 December 2024)
- ML20216G815 + (15:13:06, 3 December 2024)
- ML20216G809 + (15:13:07, 3 December 2024)
- ML20216G806 + (15:13:08, 3 December 2024)
- ML20216G804 + (15:13:09, 3 December 2024)
- ML20216G800 + (15:13:10, 3 December 2024)