. - - Mr. D. N. Morey 3 September 4, 1997-l
. Vice President - Farley Project '
Southem Nucle:r Operating Company, Inc.
3
- Post Office Box 1295 1 p
Birmingham, Alabama 35201-1295 RELIEF REQUEST RELATED TO lEEE 279-1971; SECTION 4.7.3
~
SUBJECT:
- REQUIREMENTS - STEAM GENERATOR WATER LEVEL CONTROL FO 3
-JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2
{
(TAC NOS. M93676 AND M98677) a
Dear Mr.' Morey:
C By letter April 29,1997, and supplemented by letter dated July 25,1997, Southem Nuclear Operating Company, Inc. (SNC), requested relief from the requirements of IEEE 279-1971, L
Section 4.7.3 for the Joseph M. Farley Nuclear Plant (Farley). Specifically, you requested i.
approval of interim administrative controls of steam generstor water level control (SGWLC) channels that provide reactor trip system actuation signals in conformance with the requirements of 10 CFR 50.55a(a)(3) to resolve the design deficiency identified by the i
. Westinghouse Electric Corporation in Nuclear Safety Advisory Letter (NSAL) 96 004, dated-LAugust 14,1996. These interim controls will be in placa until the necessary control / protection system design hardware changes can be implemented. Farley pians to be in compliance prior to Mode 3 entry following the Unit i 16th refueling outage (spring 2000) and Unit 214th r
. refueling outage (spring 2001).
The NRC staff has reviewed the information provided in your relief request and concludes that the proposed interim administrative controls of SGWLC avoid hardship or unusual difficulty that -
would be required to implement design changes to meet the requirements of IEEE 279-1971, Section 4.7.3 without a compensating increase in the level of quality and safety. The proposed Interim administrative controls are authorized pursuant to 10 CFR 50.55a(3)(ii), in lieu of r
meeting the single failure requirements of IEEE 279-1971 until the steam generator il replacement outages, which are scheduled for spring 2000 for Unit 1 and spring 2001 for Unit 2.
The NRC staff's evt.'uation and conclusion are provided in the enclosed Safety Evaluation.
bALSIGNEDBY:
[
Herbert N. Berkow, Director Project Directorate 11-2
$7[ QOgO po@48 Division of Reactor Projects -l/ll
'}
l P
PDft Office of Nuclear Reactor Regulation i
Docket Nos. 50-348 and 50-364
~~
Enclosure:
Safety Evaluation L
='
- S-t a a-lE0 FRE CEEE CDPV 1
[
DISTRIBUTION:
Dochet File?
'JZwolinski MTschiltz,0-5E6 SMazumdar t
- PUBLIC
- OGC,0-15818 JJohnson, Ril hf l*l lllll
. PDil-2 Rdg.
GHill (4), T-SC3 - PSkinner, Ril r_ _.
- BBoger -
ACRS, T-2E26 LJWermlel To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" =
Copy with attachment / enclosure "N" = No copy *See previous concurrence OFFICE '
PM:DJgRE l-1.A:PD22 q BC:HICB* l OGC F l OfDM l
2
'~
NAME-JZtWRMAN THERRT W >JWERMIEL
- 6e>Am H$lER$W-DATE:
f/J/97 9 /i /97 -
8/18/97 7 /3 /97 1 / y91
- OFFICIAL RECORD COPY
- DOCUM E
- G:\\FARLEY\\M98676.REL.
~
ce I
. UNITED STATES I
NUCLEAR REGULATORY COMMISSION w-
^
WAsMINGToN, D.C. 3000H001
=
4 September 4, 1997 E
Mr. D. N. Moreyi Vice President Feriey Project -
i Southem Nuclear Operating
?
Company, Inc.
Post Office Box 1295 i-Birmingham, Alabama 35201 1295
SUBJECT:
REL!EF REQUEST RELATED TO IEEE 279-1971, SECTION 4.7.3 REQUIREMENTS - STEAM GENERATOR WATER LEVEL CONTROL FOR JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. M98676 AND M98677)
Dear Mr. Morey:
..By letter April 29,1997, and supplemented by letter dated July 25,1997, Southem Nuclear Operating Company, Inc. (SNC), requested relief from the requirements of IEEE 279-1971, Section 4.7.3 for the Joseph M. Farley Nuclear Plant (Farley). Specifically, you requested
- approval of interim administrative controls of steam generator water level control (SGWLC) channels that provide reactor trip system actuation signals in conformance with the
[
requirements of 10 CFR 50.55a(a)(3) to resolve the design deficiency identified by the Westinghouse Electric Corporation in Nuclear Safety Advisory Letter (NSAL)96-004, dated 4
. August 14,1996. These interim controls will be in place until the necessary control / protection n[
system design hardware changes can be implemented. Farley plans to be in compliance prior to Mode 3 entry following the Unit 1 16th refueling outage (spring 2000) and Unit 214th refueling outage (spring 2001).
The NRC staff has reviewed the information provided in your relief request and concludes that the proposed interim administrative controls of SGWLC cvoid hardship or unusual difficulty that would be required to implement design changes to meet the requirements of IEEE 279-1971, i
Section 4,7.3 without a compensating increase in the level of quality and safety. The proposed interim administrative controls'are authorized pursuant to 10 CFR 50.55a(3)(ii), in lieu of -
meeting the single failure requirements of IEEE 2791971 until the steam generator 1[
replacement outages, which are scheduled for spring 2000 for Unit 1 and spring 2001 for Unit 2.
- The NRC staffs evaluation and conclusion are provided in the enclosed Safety Evaluation.
[
.Si
- rely, rbe Director..
Project Directorate 11 i Division of Reactor Projects-1/11 Office of Nuc6aar Reactor Regulation 1-Docket Nos. 50-348 and 50-364
Enclosure:
L Safety Evaluation t
L cc wienci: See next page i
k 1
-,i.,-.e
-r
% s.n..,
n.,.
. +,..,
,.w-n,-.
i Joseph M. Farley Nuclear Plant Units 1 and 2 cc:
Mr. R.- D. Hill, Jr.
General Manager-Southern Nuclear Operating Company Post ONice Box 470 Ashford, Alabama 36312 Mr. Mark Ajiuni, Licensing Manager Southem Nuclear Operating Company Post ONice Box 1295 Birmingham, Alabama 35201-1295 Mr. M. Stanford Blanton Balch and Bingham Law Firm Post Office Box 306 1710 Sixth Avenue North Birmingham, Alabama 35201 Mr. J. D. Woodard Executive Vice President Southem Nuclear Operating Company Post Office Box 1295 Birmingham, Alabama 35201.
State Health Officer Alabama Department of Public Health 434 Monroe Street Montgomery, Alabama 36130-1701 Chairman Houston County Commission Post Offica Box 6406
. Dothan, Alabama 36302 Regional Administrator, Region ll U.S. Nuclear Regulatory Commission Atlanta Federal Center p-161 Forsyth Street, S.W., Suite 23T85 Atlanta, Georgia' 30303
- Resident inspector -
U.S. Nuclear _ Regulatory Commission -
' 7388 N. State Highway 95 '
Columbia, Alabama.36319
.