Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative + (14:52:17, 3 December 2024)
- ML20216J842 + (14:52:18, 3 December 2024)
- ML20216J841 + (14:52:18, 3 December 2024)
- BSEP-98-0056, Suppl Application for Amends to Licenses DPR-62 & DPR-71, Converting Current TS to Improved TS as Contained in Rev 1 of NUREG-1433 + (14:52:19, 3 December 2024)
- 05000325/LER-1999-008, :on 990809,electric Motor Driven & Diesel Driven Fire Pump Concurrent Inoperability Occurred.Caused by Human Performance Error.Diesel Fire Pump Jacket Water Temp Switch Replaced.With + (14:52:21, 3 December 2024)
- ML20216J836 + (14:52:22, 3 December 2024)
- ML20216J837 + (14:52:22, 3 December 2024)
- ML20216J834 + (14:52:23, 3 December 2024)
- ML20216J835 + (14:52:23, 3 December 2024)
- ML20216J832 + (14:52:24, 3 December 2024)
- ML20216J831 + (14:52:25, 3 December 2024)
- ML20216J830 + (14:52:25, 3 December 2024)
- ML20216J829 + (14:52:26, 3 December 2024)
- 3F0999-03, Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment + (14:52:27, 3 December 2024)
- ML20216J826 + (14:52:28, 3 December 2024)
- ML20216J824 + (14:52:28, 3 December 2024)
- ML20216J823 + (14:52:29, 3 December 2024)
- ML20216J819 + (14:52:30, 3 December 2024)
- ML20216J821 + (14:52:30, 3 December 2024)
- ML20216J818 + (14:52:31, 3 December 2024)
- ML20216J815 + (14:52:32, 3 December 2024)
- ML20216J816 + (14:52:32, 3 December 2024)
- ML20216J814 + (14:52:33, 3 December 2024)
- ML20216J810 + (14:52:34, 3 December 2024)
- ML20216J809 + (14:52:35, 3 December 2024)
- ML20216J807 + (14:52:35, 3 December 2024)
- ML20216J805 + (14:52:36, 3 December 2024)
- ML20216J806 + (14:52:36, 3 December 2024)
- ML20216J801 + (14:52:37, 3 December 2024)
- ML20216J794 + (14:52:38, 3 December 2024)
- ML20216J793 + (14:52:39, 3 December 2024)
- ML20216J792 + (14:52:40, 3 December 2024)
- ML20216J790 + (14:52:41, 3 December 2024)
- ML20216J791 + (14:52:41, 3 December 2024)
- 0CAN049803, Responds to Violations Noted in Insp Rept 50-313/97-21 & 50-368/97-21.Corrective Actions:Temporary Alteration Package to Document three-inch Flanged Gap FME Cover Was Completed on 970218 + (14:52:43, 3 December 2024)
- ML20216J789 + (14:52:43, 3 December 2024)
- ML20216J787 + (14:52:44, 3 December 2024)
- ML20216J783 + (14:52:45, 3 December 2024)
- ML20216J784 + (14:52:45, 3 December 2024)
- ML20216J779 + (14:52:46, 3 December 2024)
- ML20216J778 + (14:52:47, 3 December 2024)
- ML20216J775 + (14:52:48, 3 December 2024)
- ML20216J774 + (14:52:48, 3 December 2024)
- ML20216J773 + (14:52:49, 3 December 2024)
- NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr + (14:52:49, 3 December 2024)
- ML20216J766 + (14:52:50, 3 December 2024)
- 2CAN039804, Discusses TS Bases Change Re Plant Protection Sys Matrix Logic Testing.Encl Revised Bases Page B 3/4 3-1a Should Be Issued Immediately Due to Increase in Current Channel Testing Frequency + (14:52:51, 3 December 2024)
- ML20216J765 + (14:52:51, 3 December 2024)
- ML20216J763 + (14:52:53, 3 December 2024)
- ML20216J762 + (14:52:53, 3 December 2024)
- ML20216J759 + (14:52:54, 3 December 2024)
- ML20216J758 + (14:52:54, 3 December 2024)