Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217E726 + (13:59:43, 3 December 2024)
- NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) + (13:59:43, 3 December 2024)
- ML20217E725 + (13:59:44, 3 December 2024)
- ML20217E719 + (13:59:45, 3 December 2024)
- ML20217E717 + (13:59:46, 3 December 2024)
- IR 05000271/1997006 + (13:59:53, 3 December 2024)
- ML20217E715 + (13:59:54, 3 December 2024)
- ML20217E714 + (13:59:54, 3 December 2024)
- ML20217E712 + (13:59:55, 3 December 2024)
- ML20217E710 + (13:59:56, 3 December 2024)
- ML20217E711 + (13:59:56, 3 December 2024)
- ML20217E708 + (13:59:57, 3 December 2024)
- PNO-II-97-055, on 971006,contaminated Person Transported from Sequoyah Nuclear Plant to Offsite Medical Facility,Following Apparent Heart Attack.Victim Pronounced Dead at Hosp,Due to Apparent Heart Attack.Licensee Responded to Media Inquirie + (13:59:57, 3 December 2024)
- ML20217E707 + (13:59:58, 3 December 2024)
- ML20217E704 + (13:59:59, 3 December 2024)
- ML20217E701 + (14:00:00, 3 December 2024)
- ML20217E700 + (14:00:02, 3 December 2024)
- ML20217E698 + (14:00:03, 3 December 2024)
- ML20217E699 + (14:00:03, 3 December 2024)
- 05000265/LER-1998-001, Forwards LER 98-001-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitments Made by Ltr + (14:00:04, 3 December 2024)
- 05000271/LER-1998-003, :on 980301,determined That Gaseous Effluent Flowrate Results Were Not Estimated as Required by Ts.Caused by Failure of Operating Crew to Recognize TS Requirements. Performed TS Required Estimation of Flowrate + (14:00:07, 3 December 2024)
- ML20217E691 + (14:00:07, 3 December 2024)
- ML20217E689 + (14:00:08, 3 December 2024)
- ML20217E686 + (14:00:09, 3 December 2024)
- ML20217E688 + (14:00:09, 3 December 2024)
- ML20217E685 + (14:00:10, 3 December 2024)
- ML20217E684 + (14:00:11, 3 December 2024)
- ML20217E682 + (14:00:11, 3 December 2024)
- BSEP-98-0050, Forwards Rev 2 to ESR 97-00034, Engineering Evaluation B213R1 Core Shroud Insps, Incorporating Changes Resulting from Revised Insp Data.Root Cause Evaluation for Condition Rept 97-03902 Included + (14:00:12, 3 December 2024)
- ML20217E681 + (14:00:12, 3 December 2024)
- ML20217E678 + (14:00:13, 3 December 2024)
- ML20217E676 + (14:00:20, 3 December 2024)
- ML20217E672 + (14:00:21, 3 December 2024)
- ML20217E675 + (14:00:21, 3 December 2024)
- NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future + (14:00:22, 3 December 2024)
- ML20217E669 + (14:00:23, 3 December 2024)
- ML20217E664 + (14:00:25, 3 December 2024)
- ML20217E661 + (14:00:26, 3 December 2024)
- ML20217E662 + (14:00:26, 3 December 2024)
- ML20217E660 + (14:00:27, 3 December 2024)
- ML20217E654 + (14:00:30, 3 December 2024)
- ML20217E653 + (14:00:31, 3 December 2024)
- L-98-055, Forwards ISI Ninety-Day Summary Rept Bvps,Unit 1 Outage 12, Yr 1997, Per ASME Boiler & Pressure Vessel Code,Section XI, Artical IWA-6230 + (14:00:32, 3 December 2024)
- ML20217E647 + (14:00:32, 3 December 2024)
- ML20217E645 + (14:00:34, 3 December 2024)
- IR 015000042/1997009 + (14:00:35, 3 December 2024)
- ML20217E641 + (14:00:35, 3 December 2024)
- ML20217E633 + (14:00:36, 3 December 2024)
- ML20217E631 + (14:00:37, 3 December 2024)
- ML20217E628 + (14:00:38, 3 December 2024)
- ML20217E629 + (14:00:38, 3 December 2024)
- ML20217E623 + (14:00:39, 3 December 2024)