Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217P521 + (12:42:32, 3 December 2024)
- ML20217P520 + (12:42:33, 3 December 2024)
- ML20217P516 + (12:42:34, 3 December 2024)
- ML20217P518 + (12:42:34, 3 December 2024)
- ML20217P515 + (12:42:35, 3 December 2024)
- ML20217P513 + (12:42:35, 3 December 2024)
- ML20217P510 + (12:42:36, 3 December 2024)
- ML20217P512 + (12:42:36, 3 December 2024)
- 3F0498-06, LAR 232,Rev 0 to License DPR-72,changing Scope & Frequency of Volumetric & Surface Insps for CR-3 Reactor Coolant Pump Motor Flywheels + (12:42:38, 3 December 2024)
- ML20217P508 + (12:42:38, 3 December 2024)
- ML20217P505 + (12:42:39, 3 December 2024)
- RBG-44460, Forwards Annual Radiological Environmental Operating Rept, for Period Jan-Dec 1997 + (12:42:40, 3 December 2024)
- ML20217P503 + (12:42:41, 3 December 2024)
- ML20217P502 + (12:42:41, 3 December 2024)
- ML20217P501 + (12:42:42, 3 December 2024)
- 05000266/LER-1998-008, :on 980203,EDG Air Start Motor Solenoid Valves W/Spring Not in Accordance W/Design Occurred.Caused by Use of 275 Psig Solenoid Valve Which Does Not Meet Minimum DC Voltage Available.Solenoid Valves Modified + (12:42:44, 3 December 2024)
- ML20217P499 + (12:42:44, 3 December 2024)
- ML20217P496 + (12:42:45, 3 December 2024)
- ML20217P495 + (12:42:46, 3 December 2024)
- ML20217P494 + (12:42:47, 3 December 2024)
- U-602986, Requests Addl Time to Respond to RAI Received 980225 Re IPEEE Submittal.Response to Two Seismic Questions Will Be Provided by 980930,response to Fire Questions 1 & 2 by 980831 & Fire Questions 3,4 & 5 by 981231 + (12:42:47, 3 December 2024)
- ML20217P492 + (12:42:48, 3 December 2024)
- SVP-98-120, Confirms Remaining Actions Util Plans to Take Prior to startup.Pre-startup Action List,Encl + (12:42:49, 3 December 2024)
- ML20217P489 + (12:42:50, 3 December 2024)
- NSD-NRC-98-5603, Documents Final Resolution of What W Understands to Be Last of FSER Open Items Re Structural Design & Analysis.Changes to SSAR Issues Provided in Encl Pages.W Status of Listed Open Items Is Confirm W:220.120F,220.124F & 220.128F + (12:42:51, 3 December 2024)
- ML20217P486 + (12:42:54, 3 December 2024)
- NPL-98-0323, Forwards Response to Violations Noted in Insp Repts 50-266/98-10 & 50-301/98-10.Corrective Actions:Programmatic Corrective Actions Completed on 980408,w/issuance of Revised Administrative Procedure Np 8.7.1 + (12:42:55, 3 December 2024)
- ML20217P483 + (12:42:55, 3 December 2024)
- ML20217P478 + (12:42:57, 3 December 2024)
- RC-98-0067, Requests Registration as User of Amersham Model 660 Series Radiographic Exposure Device Identification Number USA/9033/B(U),per Requirements of 10CFR71.12 + (12:42:59, 3 December 2024)
- ML20217P475 + (12:43:00, 3 December 2024)
- ML20217P474 + (12:43:01, 3 December 2024)
- ULNRC-03794, Submits Rept Re Present Level of Insurance & Sources of Insurance Which Are Applicable to Callaway Plant + (12:43:01, 3 December 2024)
- ML20217P469 + (12:43:02, 3 December 2024)
- ML20217P466 + (12:43:02, 3 December 2024)
- CY-98-037, Informs NRC That All Required Actions of CAL Have Been Completed.Util Requests That CAL & Any & All Restrictions or Requirements Imposed by CAL Be Rescinded.Summary of Actions Taken Listed + (12:43:03, 3 December 2024)
- ML20217P460 + (12:43:04, 3 December 2024)
- ML20217P457 + (12:43:05, 3 December 2024)
- ML20217P458 + (12:43:05, 3 December 2024)
- ML20217P455 + (12:43:06, 3 December 2024)
- ML20217P454 + (12:43:06, 3 December 2024)
- ML20217P449 + (12:43:09, 3 December 2024)
- ML20217P450 + (12:43:09, 3 December 2024)
- ML20217P447 + (12:43:10, 3 December 2024)
- NPL-98-0302, Number of Personnel & Rem by Work & Job Function for 1997 + (12:43:12, 3 December 2024)
- NSD-NRC-98-5601, Forwards W Responses to FSER Open Items on AP600.Summary of Encl Responses,Fser Open Item Number,Associated Oits Number & Status to Be Designated in W Status Column of Oits, Included in Table 1 + (12:43:13, 3 December 2024)
- ML20217P439 + (12:43:14, 3 December 2024)
- ML20217P432 + (12:43:15, 3 December 2024)
- ML20217P435 + (12:43:15, 3 December 2024)
- ML20217P431 + (12:43:16, 3 December 2024)
- NPL-98-0186, Submits Withdrawal of Fifth Surveillance Capsule from Unit 2,IAW Requirements of App H of 10CFR50 + (12:43:17, 3 December 2024)
- 2CAN029807, Forwards Response to Telcon RAI Re TS Change Request, Reducing RCS Flow Requirements & Main Steam Isolation Signal Setpoints to Allow Up to 30% SG Tube Plugging.Proprietary Dose Evaluation,Encl.Proprietary Info Withheld + (12:43:18, 3 December 2024)