Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20234E986 + (11:34:39, 3 December 2024)
- ML20234E981 + (11:34:40, 3 December 2024)
- ML20234E984 + (11:34:40, 3 December 2024)
- ML20234E979 + (11:34:41, 3 December 2024)
- ML20234E980 + (11:34:41, 3 December 2024)
- ML20234E978 + (11:34:42, 3 December 2024)
- ML20234E975 + (11:34:43, 3 December 2024)
- ML20234E974 + (11:34:43, 3 December 2024)
- ML20234E973 + (11:34:44, 3 December 2024)
- TXX-6481, Revises Response to Item B of Violation Noted in Insp Repts 50-445/86-06 & 50-446/86-04.Corrective Actions:Procedures for Engineering Insps of Class 1E Cable Runs Will Be Issued. Completion Date for Cable Rework Revised to 870901 + (11:34:45, 3 December 2024)
- ML20234E969 + (11:34:45, 3 December 2024)
- ML20234E965 + (11:34:46, 3 December 2024)
- IR 05000282/1987016 + (11:34:48, 3 December 2024)
- ML20234E958 + (11:34:51, 3 December 2024)
- ML20234E957 + (11:34:51, 3 December 2024)
- 3F0188-04, Notifies That Me Smith Reassigned on 880104 from Position for Which Need of License OP-20072 Certified,Per 10CFR50.74(a) + (11:34:52, 3 December 2024)
- ML20234E955 + (11:34:53, 3 December 2024)
- ML20234E954 + (11:34:53, 3 December 2024)
- 05000423/LER-1987-030, :on 870608,inadvertent Mode Change from Cold to Hot Shutdown Occurred.Caused by Operator Error.Operators Counseled & Operator Involved Temporarily Relieved of Licensed Duties + (11:34:55, 3 December 2024)
- ML20234E951 + (11:34:56, 3 December 2024)
- ML20234E948 + (11:34:57, 3 December 2024)
- PY-CEI-NRR-0717, Forwards Revised Corporate QA Program Containing Organization & Maint Program Changes Necessary to Preserve Integrity of Unit 2 Equipment & Matl During Period of Const Delay + (11:34:57, 3 December 2024)
- ML20234E945 + (11:34:58, 3 December 2024)
- ML20234E943 + (11:34:58, 3 December 2024)
- ML20234E942 + (11:34:59, 3 December 2024)
- ML20234E941 + (11:35:00, 3 December 2024)
- ML20234E940 + (11:35:01, 3 December 2024)
- ML20234E939 + (11:35:01, 3 December 2024)
- ML20234E938 + (11:35:02, 3 December 2024)
- ML20234E937 + (11:35:03, 3 December 2024)
- B12776, Forwards Rept Evaluating Risk Significance of Loss of HVAC Sys Scenarios in Control Room,Switchgear Room & Auxiliary Feedwater Pump Cubicles,Per 851122 Commitment.Loss of Room Cooling Not Significant Core Damage Frequency Issue + (11:35:04, 3 December 2024)
- ML20234E932 + (11:35:04, 3 December 2024)
- ML20234E931 + (11:35:05, 3 December 2024)
- ML20234E928 + (11:35:06, 3 December 2024)
- 3F0188-03, Responds to Re Conformance to Reg Guide 1.97, Rev 3.All Items Scheduled to Be Completed on or Before Refuel VI Complete.Remaining Open Items Listed.Utils Plans to Submit Revised Set of Variable Sheets on 880229 + (11:35:06, 3 December 2024)
- ML20234E926 + (11:35:07, 3 December 2024)
- ML20234E921 + (11:35:08, 3 December 2024)
- ML20234E924 + (11:35:08, 3 December 2024)
- ML20234E919 + (11:35:09, 3 December 2024)
- ML20234E918 + (11:35:10, 3 December 2024)
- ML20234E916 + (11:35:11, 3 December 2024)
- ML20234E914 + (11:35:11, 3 December 2024)
- ML20234E913 + (11:35:12, 3 December 2024)
- ML20234E911 + (11:35:13, 3 December 2024)
- ML20234E907 + (11:35:14, 3 December 2024)
- ML20234E909 + (11:35:14, 3 December 2024)
- ML20234E904 + (11:35:15, 3 December 2024)
- ML20234E902 + (11:35:16, 3 December 2024)
- TXX-7084, Interim Deficiency Rept CP-87-110 Re Solid State Safeguard Sequencer Relay Not Meeting Contact Interrupting Rating Requirements.Initially Reported on 871012.Evaluation Continuing.Next Rept Will Be Submitted by 880316 + (11:35:17, 3 December 2024)
- ML20234E898 + (11:35:17, 3 December 2024)
- ML20234E895 + (11:35:18, 3 December 2024)