Forwards Insp Rept 50-458/87-14 on 870501-0615 & Notice of Violation
ML20234E975
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/29/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
Shared Package
ML20234E977 List:
References
NUDOCS 8707080058
Download: ML20234E975 (2)


See also: IR 05000458/1987014

Text

- - -

e f

JUN 2 91987

4

In Reply Refer To:

Docket: 50-458/87-14

Gulf States Utilities

ATTN: Mr. James C. Deddens

SeniorVicePresident,(RBNG)

Nuclear Licensing

P. O. Box 220

St. Francisville, LA 70775

,

Gentlemen:

This refers to the inspection conducted by Messrs. D. D. Chamberlain,

W. B. Jones, and W. R. Bennett of this office during the period May 1 through

June 15, 1987, of activities authorized by NRC Operating License NPF-47 for

River Bend Station, and to the discussion of our findings with you and other

members of your staff at the conclusion of the inspection.

Areas examined during the inspection included,10 CFR Part 21 Reports,

maintenance witnessing, safety system walkdown, surveillance test witnessing,

operational safety verification, inspection of stainless steel piping and

in-office review of written reports of non-routine events at power teactor j

facilities. Within these areas, the inspection consisted of selected i

examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspectors. The inspection findings are

documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of l

Federal Regulations. Your response should be based on the specifics contained I

in the Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed inspection report.

,[ ,

.

R1 : I / SR b PI U  :[P/A AC k d

(plBjones

WRBennett J#Jaudon

MEEmerson

L /M /87 T(,/>q /87 [JEGaglia

G /pg/87

[. ADChimberlain(/g/87

( // /87 4/49/87

S 870629

{fok@K05000458

G

PDR

/h h

-_ _ - _ _ _ _ _ _ .

. , i

Gulf States Utilities -2-

l

Should you have any questions concerning this inspection, we will be pleased to'  !

discuss them with you.

Sincerely, j

-

  • cironel craned te  ;

l n. c.. um.t.* I

\ J. E. Gagliardo, Chief

i

Reactor Projects Branch

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report l

50-458/87-14 )

cc w/ enclosures: '

Gulf States Utilities

ATTN: Mr. J. E. Booker, Manager-

River Bend Oversight

P. O. Box 2951

Beaumont, Texas 77704 '

!

Louisiana State University, l

Government Documents Department '

Louisiana Radiation Control Program Director

bcc to DMB (IE01)

bec distrib. by RIV:

  • RPB DRSP
  • Resident Inspector R. D. Martin, RA
  • SectionChief(RPB/A) *D. Weiss, RM/ALF
  • MIS System *RSB
  • RSTS Operator * Project Inspector
  • R&SPB *R. Hall
  • RIV File M. E. Emerson (2)

NRR Project Manager

R. Starostecki, NRR

  • w/766