Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235H677 + (10:24:05, 3 December 2024)
- NLS8700310, Forwards MDE-103-0986, Cooper Nuclear Station Reactor Pressure Vessel Surveillance Matls Testing & Fracture Toughness Analysis. Rept Contains Test Results of Reactor Vessel Surveillance Capsule Withdrawn Following Cycle 9 + (10:24:32, 3 December 2024)
- ML20235H666 + (10:24:33, 3 December 2024)
- ML20235H657 + (10:24:34, 3 December 2024)
- ML20235H658 + (10:24:34, 3 December 2024)
- 05000313/LER-1987-005-01, :on 870825,reactor Trip Occurred Due to Failure of One Phase of Breaker 5118.Caused by Relay Personnel Forgetting to Pull Breaker Failure Module.Maint & Testing Performed & Procedures Under Evaluation + (10:24:36, 3 December 2024)
- JPN-87-035, Forwards Insp Summary of Igscc,Per Util 861028 Commitment. Welds Classified According to NUREG-0313,Rev 2.Specific Insp Plans Will Be Addressed Prior to Next Scheduled Refueling Outage.Two Oversize Drawings Encl + (10:24:37, 3 December 2024)
- ML20235H648 + (10:24:38, 3 December 2024)
- ML20235H644 + (10:24:39, 3 December 2024)
- ML20235H645 + (10:24:39, 3 December 2024)
- ML20235H643 + (10:24:40, 3 December 2024)
- ML20235H641 + (10:24:40, 3 December 2024)
- ML20235H640 + (10:24:41, 3 December 2024)
- ML20235H639 + (10:24:42, 3 December 2024)
- ML20235H636 + (10:24:42, 3 December 2024)
- ML20235H635 + (10:24:43, 3 December 2024)
- TXX-6553, Interim Deficiency Rept CP-86-55 Re Seismic Air Gap Design Adequacy Between Auxiliary Bldg & Units 1 & 2 Containment Bldgs.Initially Reported on 860814.Evaluation Continuing. Next Rept Expected by 870911 + (10:24:44, 3 December 2024)
- ML20235H630 + (10:24:45, 3 December 2024)
- ML20235H629 + (10:24:46, 3 December 2024)
- ML20235H626 + (10:24:47, 3 December 2024)
- ML20235H620 + (10:24:48, 3 December 2024)
- ML20235H619 + (10:24:49, 3 December 2024)
- ML20235H617 + (10:24:49, 3 December 2024)
- ML20235H616 + (10:24:50, 3 December 2024)
- ML20235H612 + (10:24:51, 3 December 2024)
- ML20235H610 + (10:24:52, 3 December 2024)
- ML20235H609 + (10:24:54, 3 December 2024)
- ML20235H605 + (10:24:54, 3 December 2024)
- ML20235H604 + (10:24:55, 3 December 2024)
- PY-CEI-NRR-0680, Forwards Page 55 of Supplemental Startup Rept Inadvertently Omitted Per 870605 Submittal.Attached Page Completes Suppl + (10:24:56, 3 December 2024)
- ML20235H597 + (10:24:57, 3 December 2024)
- ML20235H587 + (10:25:06, 3 December 2024)
- ML20235H584 + (10:25:07, 3 December 2024)
- BSEP-87-1090, Responds to Violations Noted in Insp Repts 50-324/87-20 & 50-325/87-20.Corrective Actions:Personnel Involved W/ Incidents Appropriately Counseled & Operations Total Quality Team Established to Implement Ways to Reduce Operator Error + (10:25:08, 3 December 2024)
- ML20235H583 + (10:25:08, 3 December 2024)
- ML20235H578 + (10:25:09, 3 December 2024)
- ML20235H573 + (10:25:10, 3 December 2024)
- ML20235H572 + (10:25:11, 3 December 2024)
- ML20235H571 + (10:25:11, 3 December 2024)
- ML20235H570 + (10:25:12, 3 December 2024)
- ML20235H567 + (10:25:13, 3 December 2024)
- 05000344/LER-1987-024, :on 870828,turbine Trip Occurred Due to Steam Generator C High Level While Bringing South Main Feed Pump on Line.Caused by Personnel Error.Steam Generator Levels Stabilized + (10:25:15, 3 December 2024)
- ML20235H564 + (10:25:15, 3 December 2024)
- ML20235H562 + (10:25:16, 3 December 2024)
- ML20235H559 + (10:25:17, 3 December 2024)
- ML20235H558 + (10:25:18, 3 December 2024)
- ML20235H555 + (10:25:19, 3 December 2024)
- ML20235H554 + (10:25:20, 3 December 2024)
- ML20235H553 + (10:25:20, 3 December 2024)
- ML20235H547 + (10:25:21, 3 December 2024)
- IR 05000324/1987012 + (10:25:52, 3 December 2024)