Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235J358 + (10:14:56, 3 December 2024)
- ML20235J356 + (10:14:57, 3 December 2024)
- ML20235J357 + (10:14:57, 3 December 2024)
- ML20235J353 + (10:14:58, 3 December 2024)
- ML20235J347 + (10:14:59, 3 December 2024)
- ML20235J351 + (10:14:59, 3 December 2024)
- 05000336/LER-1987-008-02, :on 870611,scheduling Error Discovered W/ Battery Surveillance 2736B-1,due on 870406.Surveillance Performed on 870506.Maint Dept Surveillance Scheduling Procedure Changed + (10:15:01, 3 December 2024)
- ML20235J344 + (10:15:02, 3 December 2024)
- ML20235J342 + (10:15:02, 3 December 2024)
- ML20235J338 + (10:15:03, 3 December 2024)
- 05000245/LER-1987-017, :on 870610,reactor Pressure Sys Activated by Scram Valve Air Header Low Pressure Scram Circuit.Caused by Loss of Pressure Due to Use of Air for Power Tools & Other Equipment.Jumper Bypass Placed on Circuit + (10:15:05, 3 December 2024)
- ML20235J336 + (10:15:05, 3 December 2024)
- ML20235J335 + (10:15:06, 3 December 2024)
- 05000325/LER-1987-017-02, :on 870612,reactor Scram Resulting from Primary Containment Isolations Occurred.Caused by Deficiency in Procedure of Periodic Test (PT)-80.2.Procedure Revised to Delete Use of Involved Test Pressure Gauge + (10:15:07, 3 December 2024)
- 05000354/LER-1987-024, :on 870608,Channel a Primary Containment Isolation Sys Isolation Occurred When Two Functional Tests Being Performed at Same Time.Caused by Procedural Inadequacy.Procedures Revised + (10:15:09, 3 December 2024)
- ML20235J330 + (10:15:09, 3 December 2024)
- 05000482/LER-1987-023, :on 870601,shaft Seal on Containment Air Lock Failed During Local Leak Test,Causing Total Leak to Exceed Tech Spec Limit of 0.6La.Caused by Failure of Handwheel Shaft.Shaft Smoothed W/Emory Cloth + (10:15:11, 3 December 2024)
- ML20235J327 + (10:15:12, 3 December 2024)
- RBG-30090, Responds to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Startup Testing Ensured That air-operated Components Failed as Designed on Loss of Instrument Air + (10:15:12, 3 December 2024)
- LD-87-138, Discusses NAC-1E Spent Fuel Shipping Cask Status.Cask Removed from Svc Pending Repair of Surface Damage Caused by Removal of Weld Made Between Cask Lid & Upper Forging. Repairs Targeted for 870921 + (10:15:13, 3 December 2024)
- ML20235J317 + (10:15:15, 3 December 2024)
- ML20235J321 + (10:15:15, 3 December 2024)
- U-600970, Special Rept:On 870608,plant Failed to Reach Rated Voltage & Rated Speed in Equal to or Less than 12 S.Caused by Linkage Connecting Shaft to Fuel Rack Out of Alignment.Alignment Requirements & Linkage Reworked + (10:15:16, 3 December 2024)
- ML20235J315 + (10:15:17, 3 December 2024)
- ML20235J312 + (10:15:19, 3 December 2024)
- ML20235J313 + (10:15:19, 3 December 2024)
- ML20235J311 + (10:15:20, 3 December 2024)
- ML20235J310 + (10:15:20, 3 December 2024)
- ML20235J308 + (10:15:21, 3 December 2024)
- ML20235J303 + (10:15:22, 3 December 2024)
- ML20235J306 + (10:15:22, 3 December 2024)
- ML20235J301 + (10:15:23, 3 December 2024)
- ML20235J302 + (10:15:23, 3 December 2024)
- ML20235J299 + (10:15:24, 3 December 2024)
- ML20235J298 + (10:15:24, 3 December 2024)
- ML20235J297 + (10:15:25, 3 December 2024)
- ML20235J296 + (10:15:26, 3 December 2024)
- ML20235J294 + (10:15:27, 3 December 2024)
- ML20235J295 + (10:15:27, 3 December 2024)
- 05000029/LER-1987-011, :on 870613,combined Leakage for Penetrations Subj to Type B & C Testing Exceeded Tech Spec Limit.Caused by Faulty Isolation Valve SW-TV-408 & Blank Flange Due to Improper Installation.Faults Fixed + (10:15:31, 3 December 2024)
- ML20235J283 + (10:15:32, 3 December 2024)
- ML20235J284 + (10:15:32, 3 December 2024)
- ML20235J280 + (10:15:33, 3 December 2024)
- 05000395/LER-1987-015, :on 870616,main Control Board Annunciators Alarmed.Caused by Failure of Capacitor in Inverter Xit 5904 Which Caused Output Fuse to Blow.Failed Pressurizer Pressure Control Card & All Inverter Xit 5904 Replaced + (10:15:34, 3 December 2024)
- ML20235J277 + (10:15:35, 3 December 2024)
- ML20235J273 + (10:15:36, 3 December 2024)
- ML20235J269 + (10:15:37, 3 December 2024)
- ML20235J271 + (10:15:37, 3 December 2024)
- ML20235J267 + (10:15:38, 3 December 2024)
- ML20235J266 + (10:15:38, 3 December 2024)
- ML20235J264 + (10:15:39, 3 December 2024)
- ML20235J263 + (10:15:40, 3 December 2024)