Text
y
~:*h 6,
\\y.
^,,
% 'R y
l 4
VI H'GINI A. ELECTHIC AND POWP.R COM PANY -
RICHMOND, DHOINIA 2O261, j
WJR.Cantwasour.-
"'N"""E""'
February 17, 1989'
~
ci
'1
]
l 0
I lUnited States Nuclear. Regulatory Commission-Serial No.
'89-106 Attention:
Document Control. Desk PES /JRH:cdk f
Washington, D.C.
20555 Docket Nos. 50-339.
l License Nos. NPF-7 L
l 1
Gentlemen:
a YIRU NIA ELECTRIC AND POWER COMPANY NORTH ANN _A POWER STATION UND_2 IEQiNKA_ SPECIFICATION REPORTING RE0VIREMENTS FOR TI)LERE SURVEILLANCE REPORJ North Anna Unit 2 is currently scheduled ' to complete.its sixth cycle of.
, operation on February 19.,
1989 and enter a refueling outage.
Cycle 7 is currently scheduled to begin on April 18, 1989.
- Because of delays in the restart of the Surry units and system load demands,
' North Anna Unit 2 has operated beyond the burnup range used for the initial cych 7 reload core design:. The cycle 7 core will be redesigned following the completion of cycle 6 operation to facilitate use of actual cycle 6 burnup info.mation.
The time. required for the redesign of the cycle 7 reload core then makes it ' impossible to meet the sixty day advance submitta'l requirement of Technical Specification 6.9.1.7 prior to cycle 7 initial criticality.
However, the Technical Specification provides for an alternate submittal date i
with NRC written approval.
Therefore, in accordance with this Technical Specification provision, we request-the sixty day advance submittal requirement be waived by the NRC, and alternately, we propose to submit the required Core Surveillance Report by March 15, 1989.
. Based on a preliminary assessment, Technical Specification changes are not p
expected to be required to support the cycle 7 reload core design.
Should you have any questions, please contact us at your earliest convenience.
Very truly your,
W. R. Cartwright g 22 g y{ h I
<7- ;.\\, y.g :. w. ;
-)
,.c, wp
- c i ! ~, ;..
'. a ' 4L 4
si
'4 cc: U. S.. Nuclear Regulatory Commission L's Region II 101 Marietta Street,.N. W.
Suite 2900 Atlanta, Georgia 30323 Mr. J. L. Caldvill NRC Senflor Resident Inspector
! North Anna Power Station i