ENCLOSURE 1 NOTICE OF VIOLATION l
Georgia Power Company Docket No. 50-424
.Vogtle Electric Generating. Plant License No. NPF l During the Nuclear Regulatory Commission -(NRC) inspection ' conducted on August 31L - Septenter 4,1987, a violation of NRC requirements was identified.
l The. violation involved failure to meet Technical Specification requirements for q
locking high radiation areas.
In accordance with the. " Gene ai St;tJent of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1986), the violation is listed below:
Technical Specification (TS) 6.11.2 requires that areas accessible to i
personnel with radiation levels greater than 1,000 millirem / hour at 45 cm.
(18 in.) from the radiation source or from any surface which the radiat_1on penetrates shall be provided with locked doors to prevent _ unauthorized.
I entry, and the keys shall be maintained under the administrative control J
of the shift foremen on duty and/or health physics supervision.
This TS also requires dcors to remain locked except.during periods of access by_
-1 I
personnel under an approved radiation work permit.
Contrary to the above, the licensee failed to provide locked doors of the j
type required to prevent unauthorized entry into a high radiation area in.
q that on August 3,1987, and prior to this date a lock and access controls i
of the type required was not provided on the personnel access door to Unit No. 1 containment.
y This is a Severity Level IV violation (Supplement IV).
l l
Pursuant to the provisions of 10 CFR 2.201, Georgia Power Company is hereby required to submit to this Office'within 30 days of the date of the letter:
transmitting this Notice a written statement or explanation in. reply including:
(1) admission er denial of the violation, (2) the reason for the violation if i
admitted, (3) the corrective steps which have been taken and.the ~ results I
achieved, (4) the corrective steps which will be taken to avoid further l
violations, and (5) the cate when full compliance.will be achieved. Where good-l cause is shown, consideration will be given to extending the response tire.
- j FOR THE NUCLEAR REGULATORY COMMISSION i
n J. Nelson Grace w
Regional Administrator Dated at Atlanta, Georgic this 24 day of September 1987 9710010392 870924 PDR ADOCK 05000424 G