Mod 5,providing Incremental Funding,Modifying Funding Mechanism to Pay for Telemetry Costs & Increasing Ceiling,To Northeastern Seismic Research Program - Task 4
ML20235J358
Person / Time
Issue date: 09/25/1987
From: Nargi R, Wiggins E
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), PENNSYLVANIA STATE UNIV., UNIVERSITY PARK, PA
To:
Shared Package
ML20235J339 List:
References
CON-FIN-D-1851, CON-NRC-04-85-113, CON-NRC-4-85-113 NUDOCS 8710010411
Download: ML20235J358 (2)


Text

_ - - - - -- - - - - - - -,-

a f-

1. Core 1 RACI tD COOL PAGE OF PAU L *a j
  • 7 AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 1

l 2

l

2. AMLNOMEN t/MQDIFICATICN NO.
3. EFFECT IVE DATE
m. REQUISI T40N/ PURCHASE REQ. NO.

5, PHOJECT NO. (if apphcabic)

Five (5) 9/15/87 RES-85-ll3 6.essucD uv

' ' ^ "'"'"'"'#*'"""'"'"

CODE!

cODc-U.S. Nuclear Regulatory Commission Division of Contracts Washington, DC 20555

8. NAML AN D ADDRESS OF CON T H AC1OR (No., street, county, State and EtP Code)

(g) 9A. AMENDMENT OF 501.lCIT AT 40N NO.

'The Pennsylvania State University 5 Old Main Building To. DaruD fsEEirEu m University Park, PA 16802 10A, MODIFICATION OF CONT R ACT/ ORDER NO.

X NRC-04-85-ll3-04 108, DAT ED (SEE ITEM 13)

CODE l FACILITY CODE 4/1/85

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in item 14. The hour and date specified ior rsceipt of Offers is extended, is not ex-tartdud.

Oners must acknowledge receipt of this omendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods; (a) Dy completing items 8 and 15. and returning copies of the amendmen';; (b) oy acktsowledging receipt of this amendment on each copy of the of fer j submitted; or (c) By separate letter or telegram which includss a reference to the solicitation and emendment numbers. FAILURE OF 'YOUR ACKNOWLEDG- '

MENT TO BE RECElVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE sPECIFl\\ID MAY RESULT IN 6 EJECTION OF YOUR OFFER. If by virtuo of this amendment you desire to change an offer already submitted, such change may be rnade by telegram or letter, provided each totegram or letter makes reference to the solicitation and this amendment, and is received p ic r to the opening hour and date specified.

12, ACCOUNT @,G AND APPHOPRI ATION DAT A (if rrouired)

B&R No.: 10-20-23-01 FIN No.: 01851 INCREASE:

$40,000.004

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

A. t Hib CHANGE OHDL R IS 455UL0 Pui'5UANT T O: (Specify authority) THE CHANGES. SLT FORTH IN ITEM la AHE MADE IN THE CON-g T H ACT ORDER NO. IN ITE M 10A.

I

p. THE ABOVE NUMBERED CONT R ACT/OPDER IS MODIFIED TO REFLECT THE ADMINISTR ATIVE CHANGES (such as changes in paying offsce.

. ut propdation date, etc.) SET F OR1 H IN ITLM 14. PURSUANT TO THE AUTHORITY OF F AR 43.103(D).

C.1 Hib SUPPLLMLN T AL AGREEI3EN T lb ENT CHLD INTO PURSUANT TO AUT HORITY OF D. 01 HL H hpecsfy type of sno6stscatwn and autowen ty)

X The nutual agreement of the parties E. IMPORT ANT: Contracto, O is not.

x is lequirea io sign inis ooCurnent ena <efurn 2

cogi,51,,se isseio,,,,;ce.

14Tl5LSCH10 TIC N OF AMLNOMLN T/MODit 4C ATION (Organised by UCF section heehngs, ancluding solicitation / con tract suOcet matter schere feasibJc.)

Ref: Telecon, 9/10/87, between T. LaBorde, PSU, and P. Edgeworth, NRC i

The purpose of this modification is to increase the contract ceiling, to provide incremental funding, and to modify the funding mechanism (See Modification No. 4) established from funds presently allotted to this contract in order to pay for telemetry services through October 1987. Accordingly, the contract is modified as follows:

y(l. Section G.1 - Consideration, is delcted in its entirety and the following is n.

substituted in lieu thereof:

5 m

O as provided herein, all terms and conditions of the document eeterenced in item 9A c' 10A, as heretofore changed, remains unchanged and in tull force e

EEML AND itiLL OF 54GNLH (Type or prent) 16A. NAML ANG 1ITLE OF CONT RACTING OFFILEH (Type or prant) 4 m THE PENNSYLVANIA STATE UNIVERSITY wukR.D.Nargi,AssistantTreasurer Elois J. Wiggins 64/ WF140H ibC. DAIL SIGNLD 100 UNI,l EO ST ATLS OF AM 36C. DA Tt' SIGNLD

&ytH.COtwtHACT, L U ORICA i

a 7/~

aY

!C

{

iSstnature of person a riced to sign)

Qf26l8]

~

(ssenetwe of Contre ffecer) 7 ASN 7540414152 8070 30 105 STANDARD FORM 30 (REV.10 83)

PREVIOUS LD1TaON UNUSABLE PrescelDed by GSA F AR f 48 CF H153.Pa 3

p-.

e z

l-i NRC-04-85-ll3-04' Modification No. 5.

Page 2 'of. 2 l

l

.A.

Estimated Cost and Oblication 1

y

.. l...

It is estimated that the total cost to the Government for full performance of this contract will be $381,872.02.

3 2.

Total funds currently available for payment and allotted to this contract are $381,872.02.

L (a) The contract ceiling and total funds currently available are I

increased from $341,872.02 by $40,000.00 to $381,872.02.

l.

-(b) The amount of $40,000.00 presently furnished is to be utilized to pay for seismic data transmission (telemetry) expenses for l

the period July 1986 through October 1987.

1 (c) A ceiling of $11,545.91 for telemetry costs is hereby -

~

established within the amount of $301,813.00 (the original contract ceiling amount covering program costs only.and not telemetry costs).

This leaves a total of $290,267.09 to lie utilized on the Northeastern Seismic Research Program Costs -

l Task 4 as described under the basic contract.

L (d) The amount of $40,000.00 identified in subparagraph (b) above and the amount of $11,545.91 identifiedinsubparagraph(c) j above results in a not to be exceeded ceiling amount'of j

$51,545.91 for seismic data transmission (telemetry) expenses i

for the period July 1986 through October 1987.

i (e)

In summary, under the subject contract, S290,267.09 is to be l

- utilized for program costs, $40,059.02 is to be utilized to pay I

for telemetry expenses for the period April 1985 through June 1986 (See Modification No. 4), and $51,545.91 represents a not to be exceeded ceiling for telemetry expenses for the period July 1986 through October 1987.

This results in a total contract ceiling of $381,872.02, 3.

It is estimated that the amount currently allotted will cover telemetry costs through October 1987 and program costs through January 1988.

All other terms and conditions of the contract remain the same.