Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235J897 + (10:10:49, 3 December 2024)
- ML20235J896 + (10:10:49, 3 December 2024)
- ML20235J891 + (10:10:51, 3 December 2024)
- ML20235J892 + (10:10:51, 3 December 2024)
- ML20235J889 + (10:10:52, 3 December 2024)
- ML20235J887 + (10:10:52, 3 December 2024)
- ML20235J886 + (10:10:53, 3 December 2024)
- ML20235J883 + (10:10:54, 3 December 2024)
- ML20235J881 + (10:10:56, 3 December 2024)
- ML20235J880 + (10:10:57, 3 December 2024)
- ML20235J879 + (10:10:57, 3 December 2024)
- ML20235J876 + (10:10:59, 3 December 2024)
- ML20235J875 + (10:11:00, 3 December 2024)
- ML20235J870 + (10:11:01, 3 December 2024)
- PNO-V-87-062, on 870928,unit Shut Down to Repair Boron Injection Tank Leaking Pressure Relief Valve Psv 8852. Leaking Relief Valve Removed & Blank Flange Put Over Line. Plant Remains in Shutdown Status + (10:11:01, 3 December 2024)
- 3F0787-04, Submits List of All Pressure Isolation Valves & Description of Periodic Tests or Other Measures Performed to Detect Leakage,Acceptance Criteria for Leakage,Operational Limits & Test Frequency,Per Generic Ltr 87-06 + (10:11:02, 3 December 2024)
- 05000458/LER-1987-018, :on 870901,discovered That Two Chemical Properties of Diesel Fuel Oil Shipment to Plant Did Not Meet Acceptable Criteria,Per Tech Specs.Fuel Oil Analysis Entered Into Surveillance Test Procedure Program + (10:11:04, 3 December 2024)
- ML20235J865 + (10:11:04, 3 December 2024)
- ML20235J864 + (10:11:05, 3 December 2024)
- ML20235J863 + (10:11:06, 3 December 2024)
- ML20235J862 + (10:11:07, 3 December 2024)
- ML20235J859 + (10:11:08, 3 December 2024)
- ML20235J854 + (10:11:08, 3 December 2024)
- ML20235J852 + (10:11:09, 3 December 2024)
- ML20235J853 + (10:11:09, 3 December 2024)
- ML20235J850 + (10:11:10, 3 December 2024)
- ML20235J849 + (10:11:11, 3 December 2024)
- ML20235J848 + (10:11:12, 3 December 2024)
- ML20235J847 + (10:11:12, 3 December 2024)
- ML20235J845 + (10:11:13, 3 December 2024)
- ML20235J844 + (10:11:14, 3 December 2024)
- ML20235J842 + (10:11:14, 3 December 2024)
- 3F0987-19, Responds to Violations Noted in Insp Rept 50-302/87-19. Corrective Actions:Calibr of Reactor Protection Sys Revised to Incorporate Setpoints of 50 & 60 Psig for Main Turbine Control & Main Feedwater Control Oil Pressure,Respectively + (10:11:15, 3 December 2024)
- ML20235J838 + (10:11:15, 3 December 2024)
- ML20235J836 + (10:11:16, 3 December 2024)
- ML20235J835 + (10:11:17, 3 December 2024)
- ML20235J834 + (10:11:17, 3 December 2024)
- ST-HL-AE-2369, Second Interim Deficiency & Part 21 Rept Re Cooling of Unit 1 High Voltage Cubicle Panels for Standby Diesel Generators.Initially Reported on 870729.Util Completed Design Mod to Provide Addl Cooling.Next Rept by 871130 + (10:11:18, 3 December 2024)
- ML20235J828 + (10:11:19, 3 December 2024)
- ML20235J824 + (10:11:20, 3 December 2024)
- ML20235J825 + (10:11:20, 3 December 2024)
- ML20235J822 + (10:11:21, 3 December 2024)
- ML20235J821 + (10:11:22, 3 December 2024)
- ML20235J819 + (10:11:22, 3 December 2024)
- ML20235J816 + (10:11:23, 3 December 2024)
- ML20235J817 + (10:11:23, 3 December 2024)
- ML20235J814 + (10:11:24, 3 December 2024)
- ML20235J810 + (10:11:25, 3 December 2024)
- ML20235J807 + (10:11:25, 3 December 2024)
- ML20235J804 + (10:11:26, 3 December 2024)
- ML20235J803 + (10:11:27, 3 December 2024)