ML20235J844

From kanterella
Jump to navigation Jump to search
Forwards Results of Fuel Oil Samples Collected from Diesel Fuel Oil Storage Tank Coating & Analyzed in Response to NRC Concerns Re Potential for Dissolution of Zinc from Tanks
ML20235J844
Person / Time
Site: Vogtle  
Issue date: 09/30/1987
From: Bailey J
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GN-1400, NUDOCS 8710020124
Download: ML20235J844 (2)


Text

-

(

' ' * -b Georgia Power Company Post Office Box 282 Waynesboro, Georgia 30830 Telephone 404 554-9961 404 724-8114 Southern Company Services. Inc.

Post Office Box 2625 b

Birmingham, Alabama 35202 VOgtle Project Telephone 205 870 6011 September 30, 1987 United States Nuclear Regulatory Commission Document Control Desk File:

X7BC35 Washington, D. C.

Log:

GN-1400 NRC DOCUMENT NUMBERS 50-424 AND 50-425 OPERATING LICENSE NPF-68 CONSTRUCTION PERMIT NUMBER CPPR-109 V0GTLE ELECTRIC GENERATING PLANT UNITS 1 AND 2 DIESEL FUEL OIL STORAGE TANKS C0ATING Gentlemen:

In response to the NRC staff's concerns regarding the potential for the dissolution of zinc from the diesel generator fuel oil storage tank coating from the Unit 1 tanks, samples were collected and analyzed with the following results:

Date Tank Zine (PPM) 8/22/87 Train A 7.2 8/22/87 Train B 6.6 9/11/87 Train A 7.2 9/11/87 Train B 5.6 For the samples on 8/22/87 the tanks were recirculated before sampling and the samples were drawn from approximately the middle of the tanks.

The samples on 9/11/87 were drawn from the top of the tanks and no recirculation was done before sampling.

The fuel oil has been stored in both tanks for approximately two years.

The total inorganic material, including the zinc, in the fuel oil tested was less than 10 PPM.

8710020124 870930' PDR ADOCK 05000424

'M

e File:

X7BC35 Log:

GN-1400 September 30, 1987 Page two The fuel oil samples were analyzed directly by flame atomic absorption spectrophotometry, using organometallic standards and an appropriate solvent for dilution.

Should you have any questions, please inquire.

Sincerely, 1

h.

J. A. Bailey Project Licensing Manager l

+

JAB /wk1 xc: NRC Regional Adttinistrator NRC Resident Inspector J. P. O'Reilly R. E. Conway L. T. Gucwa R. A. Thomas J. E. Joiner, Esquire M. A. Miller (2)

G. Bockhold, Jr.

R. Goddard, Esquire D. Feig R. W. McManus Vogtle Project File

___mm___--________m______m_

________________--_______.____m___

__--._._m_