- BSEP-87-1097, Requests Schedular Relief from ASME Section XI Which Requires That All Hydrostatic Pressure Testing Be Completed by End of Insp Interval.Relief Requested Due to Documentation Deficiences + (10:10:33, 3 December 2024)
- ML20235J939 + (10:10:33, 3 December 2024)
- 05000454/LER-1987-016-05, :on 870831,inadvertent Train a Safety Injection Occurred During Surveillance Test.Caused by Personnel Error. Disciplinary Action Given to Involved Nuclear Station Operators + (10:10:35, 3 December 2024)
- ML20235J932 + (10:10:37, 3 December 2024)
- 0CAN098704, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-313/87-22 & 50-368/87-22.Corrective Actions:Procedure for Containment Control Revised to Include Instructions for Containment Bldg Pressurization + (10:10:38, 3 December 2024)
- ML20235J926 + (10:10:39, 3 December 2024)
- ML20235J925 + (10:10:39, 3 December 2024)
- ML20235J924 + (10:10:40, 3 December 2024)
- ML20235J923 + (10:10:41, 3 December 2024)
- ML20235J919 + (10:10:42, 3 December 2024)
- ML20235J916 + (10:10:43, 3 December 2024)
- ML20235J914 + (10:10:44, 3 December 2024)
- 05000455/LER-1987-015-07, :on 870829,feedwater Isolation Actuation on Steam Generator Level high-2 Occurred.Caused by Personnel Error.Personnel counseled.Color-coding of Instruments to Prevent Error Under Investigation + (10:10:45, 3 December 2024)
- ML20235J910 + (10:10:46, 3 December 2024)
- ML20235J906 + (10:10:47, 3 December 2024)
- ML20235J903 + (10:10:47, 3 December 2024)
- AECM-87-0128, Application for Amend to License NPF-29,raising Standby Liquid Control Sys Pump Relief Valve Setpoint,Adding 3.0.4 Exceptions & Removing Isolation Instrumentation Operational Conditions.Fee Paid + (10:10:48, 3 December 2024)
- ML20235J897 + (10:10:49, 3 December 2024)
- ML20235J896 + (10:10:49, 3 December 2024)
- ML20235J891 + (10:10:51, 3 December 2024)
- ML20235J892 + (10:10:51, 3 December 2024)
- ML20235J889 + (10:10:52, 3 December 2024)
- ML20235J887 + (10:10:52, 3 December 2024)
- ML20235J886 + (10:10:53, 3 December 2024)
- ML20235J883 + (10:10:54, 3 December 2024)
- ML20235J881 + (10:10:56, 3 December 2024)
- ML20235J880 + (10:10:57, 3 December 2024)
- ML20235J879 + (10:10:57, 3 December 2024)
- ML20235J876 + (10:10:59, 3 December 2024)
- ML20235J875 + (10:11:00, 3 December 2024)
- ML20235J870 + (10:11:01, 3 December 2024)
- PNO-V-87-062, on 870928,unit Shut Down to Repair Boron Injection Tank Leaking Pressure Relief Valve Psv 8852. Leaking Relief Valve Removed & Blank Flange Put Over Line. Plant Remains in Shutdown Status + (10:11:01, 3 December 2024)
- 3F0787-04, Submits List of All Pressure Isolation Valves & Description of Periodic Tests or Other Measures Performed to Detect Leakage,Acceptance Criteria for Leakage,Operational Limits & Test Frequency,Per Generic Ltr 87-06 + (10:11:02, 3 December 2024)
- 05000458/LER-1987-018, :on 870901,discovered That Two Chemical Properties of Diesel Fuel Oil Shipment to Plant Did Not Meet Acceptable Criteria,Per Tech Specs.Fuel Oil Analysis Entered Into Surveillance Test Procedure Program + (10:11:04, 3 December 2024)
- ML20235J865 + (10:11:04, 3 December 2024)
- ML20235J864 + (10:11:05, 3 December 2024)
- ML20235J863 + (10:11:06, 3 December 2024)
- ML20235J862 + (10:11:07, 3 December 2024)
- ML20235J859 + (10:11:08, 3 December 2024)
- ML20235J854 + (10:11:08, 3 December 2024)
- ML20235J852 + (10:11:09, 3 December 2024)
- ML20235J853 + (10:11:09, 3 December 2024)
- ML20235J850 + (10:11:10, 3 December 2024)
- ML20235J849 + (10:11:11, 3 December 2024)
- ML20235J848 + (10:11:12, 3 December 2024)
- ML20235J847 + (10:11:12, 3 December 2024)
- ML20235J845 + (10:11:13, 3 December 2024)
- ML20235J844 + (10:11:14, 3 December 2024)
- ML20235J842 + (10:11:14, 3 December 2024)
- 3F0987-19, Responds to Violations Noted in Insp Rept 50-302/87-19. Corrective Actions:Calibr of Reactor Protection Sys Revised to Incorporate Setpoints of 50 & 60 Psig for Main Turbine Control & Main Feedwater Control Oil Pressure,Respectively + (10:11:15, 3 December 2024)
- ML20235J838 + (10:11:15, 3 December 2024)