Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235T059 + (09:19:38, 3 December 2024)
- ML20235T050 + (09:19:46, 3 December 2024)
- IR 05000425/1989009 + (09:19:47, 3 December 2024)
- 05000364/LER-1987-002-01, :on 870903,determined That Train a & B Svc Water Battery Changer Room Coolers Water Supplies Crossed. Caused by Design Error.Design Change Will Be Implemented & Completed During Refueling Outage in Oct 1987 + (09:19:49, 3 December 2024)
- ML20235T041 + (09:19:50, 3 December 2024)
- ML20235T046 + (09:19:50, 3 December 2024)
- ML20235T039 + (09:19:51, 3 December 2024)
- ML20235T034 + (09:19:52, 3 December 2024)
- ML20235T030 + (09:19:53, 3 December 2024)
- 05000352/LER-1987-045, :on 870830,standby Gas Treatment Sys Initiated. Caused by Polyphase Fault to Ground on Unit 2 Load Ctr Transformer,Producing Low Voltage Condition on Unit 1 Instrument Panel.Transformer Returned to Mfg + (09:19:54, 3 December 2024)
- ML20235T021 + (09:19:56, 3 December 2024)
- ML20235T024 + (09:19:56, 3 December 2024)
- ML20235T020 + (09:19:57, 3 December 2024)
- ML20235T018 + (09:19:57, 3 December 2024)
- ML20235T015 + (09:19:58, 3 December 2024)
- ML20235T013 + (09:19:59, 3 December 2024)
- ML20235T011 + (09:19:59, 3 December 2024)
- ML20235T006 + (09:20:00, 3 December 2024)
- ML20235T005 + (09:20:01, 3 December 2024)
- PNO-II-89-015, on 890125,Unit 1 Tripped Due to Ruptured Air Line to Main Feedwater Regulating Valve.Subsequent to Trip, Radiation Monitor Indications & Increased Charging Flow Revealed primary-to-secondary Leak from C Steam Generator + (09:20:02, 3 December 2024)
- ML20235S998 + (09:20:03, 3 December 2024)
- AECM-87-0186, Forwards Mark Up of Safety Issues Mgt Sys (Sims) W/Util Supplied Implementation Dates.Nrc Will Be Notified at 871019 Meeting of Items That Should Be Added to Encl Sims Rept Based on Plant long-term Work Planning Documentation + (09:20:03, 3 December 2024)
- TXX-6740, Interim Deficiency Rept CP-87-74 Re Inadequate Measurement of Weld Size in Joints of Structural Tube Test.Initially Reported on 870824.Drawing Review Initiation of Tubular Structural Installation to Meet Design Requirements + (09:20:04, 3 December 2024)
- 05000298/LER-1987-021, :on 840624,850503,24,0730 & 0816 Unplanned Actuations of Automatic Diesel Generators Occurred W/O Being Reported.Caused by Past Understanding of Term ESF Actuation as Applied to Diesel Generators + (09:20:07, 3 December 2024)
- ML20235S986 + (09:20:08, 3 December 2024)
- 05000352/LER-1987-015, :on 870514,HPCI Turbine Shut Down After Running for 25 Minutes.Caused by Loose Lead on Output of Flow Controller & Drift in Adjustment Valves Balance Chamber. Loose Lead Tightened & Valves Replaced + (09:20:10, 3 December 2024)
- ML20235S980 + (09:20:11, 3 December 2024)
- ML20235S979 + (09:20:11, 3 December 2024)
- TXX-6735, Interim Deficiency Rept CP-87-68 Re Concrete Expansion Anchors Supplied by Hilti.Initially Reported on 870824.Spec Will Be Revised to Prohibit Further Use of Hilti Bolts.Next Rept Will Be Submitted by 871118 + (09:20:14, 3 December 2024)
- ML20235S968 + (09:20:15, 3 December 2024)
- TXX-8908, Responds to NRC Re Violations Noted in Insp Repts 50-445/88-82 & 50-446/88-78.Corrective Actions:Dca 548,Rev 6 Issued on 890207 to Correct as-built Weld Sizes Shown & Sample of 15 Other DCAs Reviewed + (09:20:16, 3 December 2024)
- ML20235S966 + (09:20:16, 3 December 2024)
- ML20235S959 + (09:20:17, 3 December 2024)
- ML20235S960 + (09:20:17, 3 December 2024)
- 05000155/LER-1989-002, :on 890203,discovered That Sys Leak Tests Not Formally Completed Nor Has Specific Written Relief Been Requested of Nrc.Caused by Oversight During Development of 40 Yr Inservice Insp Plan + (09:20:19, 3 December 2024)
- ML20235S954 + (09:20:21, 3 December 2024)
- ML20235S951 + (09:20:22, 3 December 2024)
- ML20235S950 + (09:20:23, 3 December 2024)
- SNRC-1556, Shoreham Nuclear Power Station Annual Operating Rept 1988 + (09:20:24, 3 December 2024)
- ML20235S947 + (09:20:24, 3 December 2024)
- ML20235S942 + (09:20:25, 3 December 2024)
- U-601050, Advises That Util Endorses BWR Owners Group 870820 Comments on Draft NUREG-1150, Reactor Risk Ref Document + (09:20:26, 3 December 2024)
- ML20235S938 + (09:20:26, 3 December 2024)
- ML20235S936 + (09:20:27, 3 December 2024)
- U-601049, Forwards Proposed Mod to NPDES Permit,Changing Design Max Flow for Outfall 003 Water Treatment Wastes + (09:20:28, 3 December 2024)
- ML20235S934 + (09:20:28, 3 December 2024)
- ML20235S931 + (09:20:29, 3 December 2024)
- ML20235S929 + (09:20:30, 3 December 2024)
- ML20235S927 + (09:20:30, 3 December 2024)
- ML20235S925 + (09:20:31, 3 December 2024)
- ML20235S922 + (09:20:32, 3 December 2024)
- B12578, Responds to NRC 870519 Concerns Over Implementation of Commitments (Ref Insp Rept 50-213/87-08).Efforts Underway to Improve Link Between Commitment Tracking & Work Assignment Sys.Util Performance Expected to Improve + (09:20:33, 3 December 2024)