Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- A07742, Responds to NRC Bulletin 88-007,Suppl 1 Power Oscillations in Bwrs. Unit 1 Completed Addl Procedure Revs Re GE Interim Stability Recommendations Effective on 890201 & Stability Boundaries Will Be Reevaluated + (09:01:19, 3 December 2024)
- ML20235U708 + (09:01:19, 3 December 2024)
- 05000321/LER-1989-002-01, :on 890205,4 H Grab Sampling & Analyses Not Performed,Per Tech Spec 3.6.G.2.A When Particulate Fission Product Monitor Inoperable.Caused by Personnel Error. Procedures Upgraded & Personnel Counseled + (09:01:21, 3 December 2024)
- ML20235U705 + (09:01:22, 3 December 2024)
- ML20235U704 + (09:01:22, 3 December 2024)
- ML20235U702 + (09:01:23, 3 December 2024)
- ML20235U700 + (09:01:25, 3 December 2024)
- ML20235U698 + (09:01:26, 3 December 2024)
- ML20235U697 + (09:01:27, 3 December 2024)
- ML20235U695 + (09:01:27, 3 December 2024)
- 05000370/LER-1987-016-02, :on 870906,reactor Trip Occurred Due to High Pressurizer Pressure When Main Turbine Governor & Intercepts Closed.Caused by Overcurrent Fault Breaker Trip Due to Grounded Motor Lead Connector on Compressor + (09:01:29, 3 December 2024)
- ML20235U693 + (09:01:30, 3 December 2024)
- ML20235U692 + (09:01:31, 3 December 2024)
- ML20235U691 + (09:01:31, 3 December 2024)
- ML20235U689 + (09:01:32, 3 December 2024)
- ML20235U686 + (09:01:34, 3 December 2024)
- 05000285/LER-1989-005, :on 890126,contract Electrician Performed Maint Inside Posted High Radiation Area W/O Radiation Protection Coverage.Caused by Personnel Error.Cross Training Arranged & Procedure Reviewed for Upgrading + (09:01:39, 3 December 2024)
- PNO-II-87-047, on 870715,unit Experienced Steam Generator Tube Leak.Util Reported Estimated Release of Radioactive Matl to Atmosphere Less than 1.3% of Tech Spec Release Limit.Release Path Isolated + (09:01:40, 3 December 2024)
- ELV-00294, Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Per 10CFR50,App J + (09:01:41, 3 December 2024)
- ELV-00292, Annual Operating Rept Part I + (09:01:42, 3 December 2024)
- ML20235U678 + (09:01:42, 3 December 2024)
- B12700, Corrects Error in 821029 Environ Rept OL Stage Re Mortality Coefficient of Winter Flounder Used in Second of Two equivalent-adult Methods.Revised Calculations Encl + (09:01:43, 3 December 2024)
- ML20235U675 + (09:01:44, 3 December 2024)
- ML20235U674 + (09:01:45, 3 December 2024)
- ML20235U673 + (09:01:45, 3 December 2024)
- ML20235U672 + (09:01:46, 3 December 2024)
- ML20235U669 + (09:01:47, 3 December 2024)
- ML20235U670 + (09:01:47, 3 December 2024)
- ML20235U665 + (09:01:48, 3 December 2024)
- ML20235U664 + (09:01:49, 3 December 2024)
- TXX-6850, Interim Deficiency Rept CP-87-100 Re Three Containment Isolation Penetrations That May Lack Relief Protection. Initially Reported on 870910.Evaluation Continuing.Next Rept Will Be Submitted by 871211 + (09:01:49, 3 December 2024)
- ML20235U662 + (09:01:50, 3 December 2024)
- IR 05000483/1989002 + (09:01:51, 3 December 2024)
- ML20235U661 + (09:01:51, 3 December 2024)
- ELV-00273, Forwards Sixth Suppl to Summary Rept of Startup Test Program.Initial Summary Rept Submitted on 870831.Suppl Addresses Remaining Startup Tests Incomplete as of Last Submittal + (09:01:53, 3 December 2024)
- ML20235U656 + (09:01:53, 3 December 2024)
- ML20235U650 + (09:01:54, 3 December 2024)
- ML20235U654 + (09:01:54, 3 December 2024)
- ML20235U648 + (09:01:55, 3 December 2024)
- IR 05000321/1987024 + (09:01:56, 3 December 2024)
- TXX-6560, Interim Deficiency Rept CP-86-48 Re Adequacy of Nonconformance Dispositions.Initially Reported on 860616. Nonconformance Rept Review Program Scheduled for Completion by Fuel Load.Next Rept Will Be Submitted by 871120 + (09:01:56, 3 December 2024)
- 05000302/LER-1989-004, :on 890201,numerous Cells in Train a & B Batteries Found to Have Electrolyte Level Above Max Level Allowed by Tech Specs Resulting in Batteries Being Declared Inoperable.Caused by Overfilling of Cells + (09:01:58, 3 December 2024)
- ML20235U643 + (09:01:59, 3 December 2024)
- ML20235U642 + (09:01:59, 3 December 2024)
- IR 05000206/1989005 + (09:02:00, 3 December 2024)
- ML20235U641 + (09:02:00, 3 December 2024)
- 05000440/LER-1987-064, :on 870909,feedwater Pump Overspeed & Change in Feedwater Flow Control Signal Resulted in Reactor Scram,Hpcs Injection & RCIC Initiation.Caused by Procedural Error in Periodic Test Instruction (Pti).Pti Revised + (09:02:02, 3 December 2024)
- TXX-6801, Interim Deficiency Rept CP-87-89 Re Voltage Drop Between Class 1E Batteries & Station Uninterruptible Power Supply. Initially Reported on 870903.Evaluation Continuing to Determine Impact on 125 Volt Dc Sys Design.Next Rept 880115 + (09:02:03, 3 December 2024)
- ML20235U637 + (09:02:03, 3 December 2024)
- ML20235U634 + (09:02:04, 3 December 2024)
- ML20235U635 + (09:02:04, 3 December 2024)
- BSEP-89-0168, Responds to Violations Noted in Insp Repts 50-324/88-41 & 50-325/88-41.Corrective Actions:Std Operating Procedure SPO-02.6 Revised to Include Specific Directions for Following Plant Overtime Policy Guidelines + (09:02:05, 3 December 2024)