Requests Notification within 30 Days of Ltr Should Util Anticipate Problems in Accommodating non-Region IV Personnel in Abbreviated Site Access Program
ML20235U643
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/02/1989
From: Yandell L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
References
NUDOCS 8903090300
Download: ML20235U643 (2)


Text

__

FEB - 2 l989 In Reply Refer To:

Docket: 50-382 L

L Louisiana Power & Light Company ATTN: J. G. Dewease, Senior Vice President Nuclear Operations 317 Baronne Street New Orleans, Louisiana 70160 Gentlemen:

Each quarter this office provides you with a letter concerning unescorted access authorization at your facility for NRC personnel. Enclosure 1 to that letter discusses several authorization matters and identifies NRC Region IV personnel that have completed radiation protection training conducted in Region IV that satisfies the items addressed 'a 10 CFR Part 19.12. That letter also requests that you limit training tor Region IV personnel who have completed radiation protection training to a short onsite orientation, as appropriate, on the site-specific aspects of radiation protection along with a security and emergency response briefing. We request that the orientation combined with.other access procedures such as security badging and whole body counting not take more than one hour.

In addition to NRC Region IV personnel, non-Region IV personnel such as NRC employees from other Regional Offices, NRC Headquarters representatives from the Offices of Nuclear Reactor Regulatior., Nuclear Regulatory Research, Nuclear Materials Safety and Safequards, or NRC contractors may find it necessary to W visit your facility intermittently. Region IV will continue to identify these i non-Region IV individuals by correspondence. Before any non-Region.IV individual is identified for unescorted access, this office will be responsible for reviewing their training history to ensure that they satisfy 10 CFR Part 19.12 requirements. We envision that the same site-specific training provided to Region IV personnel would also apply to non-Region IV personnel.

Please notify us within 30 days of the date of this letter if you anticipate any problems in accommodating non-Region IV personnel in your abbreviated site access program. Your cooperation in this matter is appreciated.

Sincerely, l ORIGINAL SIGNED BY:

Lawrence A. Yandell, Director Division of Resource Management RIV:C:RPB:DRSS D:DRSS D:DRMA $hb

  • BMurray/ sir *RBangart LYandel ,

I

/ /89 / /89 7 / l /89 8903090300 890202 '

1 PDR ADOCK 05000382 P PNU

n':' . . . I Louisiana' Power & Light Company : Louisiana Power '&' Light Company L ATTN: .R. P. Barkhurst, Vice President Nuclear Operations P.O. Box B.-

L Killona, Louistana. 70066 Louisiana Power & Light Company.

' ATTN: :N. S.'Carns,: Plant Manager sP .O.' Box B~

Killona, Louisiana 70066 Louisiana Power & Light Company

. ATTN:. R. F.-Burski, Manager, Nuclear Safety & Regulatory Affairs 317 Baronne Street

, P.O. Box 60340 E-

. New Orleans, -Louisiana-. 70160 Louisiana Power & Light-Company

' ATTN: L, W. Laughlin, Site Licensing Support Supervisor P.O. Box B Killona, Louisiana 70066 Louisiana Power & Light Company.

' ATTN: G. M. Davis, Manager, Events-Analysis' Reporting & Response P.00 Box B ,

Killona, Louisiana 70066 Middle South Services

' ATTN: ~Mr. R.'T. Lally

P.O. Box 61000 New Orleans,-Louisiana' 70161 Louisiana Radiation Control Program Director-bec -distrib. by RIV

R. D. Martin, RA Lisa Shea, RM/ALF Resident Inspector Section Chief, DRP/A DRP RPB-DRSS DRS MIS System RSTS Operator RIV File Inspector 4 Section Chief z B. Murray

  • R.' L. Bangart R. E. Hall Project Engineer, DRP/A D.- Wigginton, NRR Project Manager