Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TXX-6844, Informs That Field Verification Method (Fvm) for Unit 2 Sys Will Be Issued to Support Completion of Walkdowns,Generation of DCAs & Installation of Cable Grips by 881231,in Response to Notice of Violation.Draft FSAR Encl + (08:59:14, 3 December 2024)
- SNRC-1551, Forwards Semiannual Radioactive Effluent Release Rept,Third & Fourth Quarters of 1988 & Rev 5 to Solid Waste Process Control Room + (08:59:15, 3 December 2024)
- ML20235U898 + (08:59:16, 3 December 2024)
- ML20235U897 + (08:59:17, 3 December 2024)
- ML20235U895 + (08:59:17, 3 December 2024)
- 2CAN028901, Application for Amend to License NPF-6,revising Tech Specs to Delay Snubber Insp Until Upcoming Outage Scheduled for Sept 1989.Fee Paid + (08:59:18, 3 December 2024)
- ML20235U891 + (08:59:19, 3 December 2024)
- ML20235U889 + (08:59:20, 3 December 2024)
- ML20235U888 + (08:59:20, 3 December 2024)
- ML20235U886 + (08:59:21, 3 December 2024)
- ML20235U885 + (08:59:22, 3 December 2024)
- PY-CEI-NRR-0978, Semiannual Radioactive Effluent Release Rept for Jul-Dec 1988 + (08:59:23, 3 December 2024)
- ML20235U881 + (08:59:24, 3 December 2024)
- ML20235U878 + (08:59:24, 3 December 2024)
- PY-CEI-NRR-0974, Forwards Ninth Quarterly Rept - Seismic Monitoring Network, Oct-Dec 1988. Info Re Continued Operation of Network Through at Least 1989 Also Encl + (08:59:26, 3 December 2024)
- ML20235U875 + (08:59:26, 3 December 2024)
- ML20235U871 + (08:59:27, 3 December 2024)
- ML20235U868 + (08:59:28, 3 December 2024)
- IR 05000416/1987022 + (08:59:31, 3 December 2024)
- TXX-6836, Interim Deficiency Rept CP-87-98 Re Review of Cable & Raceway Data Sys Which Indicates That Wrong Cable Diameter May Have Been Used in Calculations.Evaluation of Impact of Application of Nominal Cable Continues.Next Rept by 871120 + (08:59:32, 3 December 2024)
- ML20235U861 + (08:59:32, 3 December 2024)
- ML20235U859 + (08:59:33, 3 December 2024)
- BVY-89-023, Effluent & Waste Disposal Semiannual Rept for Third & Fourth Quarters,1988 + (08:59:34, 3 December 2024)
- ML20235U856 + (08:59:35, 3 December 2024)
- IR 05000498/1989003 + (08:59:36, 3 December 2024)
- ML20235U851 + (08:59:37, 3 December 2024)
- AECM-89-0047, Discusses Generic Ltr 88-11, NRC Position on Radiation Embrittlement of Reactor Vessel Matls & Impact on Plant Operations. Util Will Submit Proposed OL Amend Changing Tech Specs to Reflect Limitation of 10 Efpy.Fee Paid + (08:59:38, 3 December 2024)
- ML20235U847 + (08:59:38, 3 December 2024)
- ML20235U846 + (08:59:39, 3 December 2024)
- ML20235U843 + (08:59:39, 3 December 2024)
- ML20235U842 + (08:59:40, 3 December 2024)
- ML20235U838 + (08:59:41, 3 December 2024)
- ML20235U835 + (08:59:41, 3 December 2024)
- ML20235U833 + (08:59:42, 3 December 2024)
- TXX-6806, Final Deficiency Rept CP-85-19 Re Use of Nonrepresentative Sample in Determining Typical Conduit Span Calculations. Initially Reported on 861021.Evaluation Using Revised Design Criteria Identified No Overstressed Conduit Spans + (08:59:43, 3 December 2024)
- ML20235U832 + (08:59:43, 3 December 2024)
- ML20235U828 + (08:59:44, 3 December 2024)
- ML20235U824 + (08:59:45, 3 December 2024)
- ML20235U823 + (08:59:45, 3 December 2024)
- 05000482/LER-1989-004, :on 890202,reactor Trip Occurred from 100% Power as Result of Steam Generator Reaching lo-lo Level Trip Setpoint.Caused by Loose Screw on Terminal Strip in Solid State Protection Sys.Other Cabinets Checked + (08:59:47, 3 December 2024)
- ML20235U820 + (08:59:51, 3 December 2024)
- ML20235U819 + (08:59:51, 3 December 2024)
- ML20235U818 + (08:59:52, 3 December 2024)
- ML20235U816 + (08:59:53, 3 December 2024)
- IR 05000454/1989001 + (08:59:57, 3 December 2024)
- ML20235U812 + (08:59:58, 3 December 2024)
- ML20235U809 + (08:59:59, 3 December 2024)
- ML20235U810 + (08:59:59, 3 December 2024)
- ML20235U806 + (09:00:00, 3 December 2024)
- TXX-6813, Interim Deficiency Rept CP-87-33 Re Rotational of Auxiliary Feedwater Pump Motor Cooling Fans.Initially Reported on 870708.Evaluation Continuing.Submittal of Next Rept Anticipated by 871202 + (09:00:00, 3 December 2024)
- ML20235U801 + (09:00:02, 3 December 2024)
- ML20235U803 + (09:00:02, 3 December 2024)