ML20235U835
| ML20235U835 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 03/01/1989 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20235U839 | List: |
| References | |
| NUDOCS 8903090393 | |
| Download: ML20235U835 (3) | |
See also: IR 05000498/1989003
Text
-
..
_
_ - _ .
_ _ _ _
_ _ _ _ .
_ _ _ _
__
_
_ _
_
.
MAR - 1 1989
In Reply Refer To:
Do.ckets: 50-498/89-03
50-499/89-03
Houston Lighting & Power Company
ATTN:
J. H. Goldberg, Group Vice
President, Nuclear
P.O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the inspection conducted by Mr. R. E. Baer and Dr. J. B.
Nicholas of this office during the period February 6-10, 1989, of activities
authorized by NRC Operating Licenses NPF-76 and NPF-78 for Units 1 and 2 of the
South Texas Project Electrical Generating Station, and to the discussion of our
findings with Mr. G. E. Vaughn and other members of your staff at the
conclusion of the inspection on February 10, 1989.
Areas examined during the inspection included portions of your radioactive
waste management program.
Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspectors.
The inspection findings are
documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
We have also examined actions you have taken toward resolving a previously
identified open item regarding calibration of effluent and process radiation
monitors. This matter was discussed during a telephone conversation on
February 14, 1989, between Mr. R. E. Baer of this office and Mr. G. L. Parkey
of your staff.
Based on the results of this conversation, it is our
understanding that you will complete the primary calibration of all effluent
radiation monitors installed in Units 1 and 2 by July 1, 1989, and perform the
primary calibration of all Technical Specification process radiation monitors
installed in Units 1 and 2 by December 31, 1989.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
f*+
Original Signni BY
3O g g Ohb3Og B
oQ
A.B. Beacli
G
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
(s
next page)
RIV:FRPS:RP
C:FRPS
C:RPB
C:PS
. Ri!
JBNicholas;1m
REBaef
BMur ay
EHoller
L
1an
p/g/89
p jg/89
/y / < 89
$ // /89
3 /i /89
5\\
lEcto
i.
_ .
M
--um
mmii
.
.
Houston Lighting & Power Company
-2-
.
.
Enclosures:
1. Appendix - NRC Inspection Report
50-498/89-03
50-499/89-03
2. Attachment - Documents Reviewed
cc w/ enclosure:
Houston Lightirg & Power Company
ATTN:
M. A. McBurnett, Manager
Operations Support Licensing
P.O. Box 289
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATTN: Gerald E. Vaughn, Vice President
Nuclear Operations
P.O. Box 289
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATTN:
J. T. Westermeier, General Manager
South Texas Project
P.O. Box 289
Wadsworth, Texas 77483
Central Power & Light Company
ATTN:
R. L. Range /R. P. Verret
P.O. Box 2121
Corpus Cht1 .ti, Texas 78403
City of Austin Electric Utility
ATTN:
R. J. Miner, Chief Operating
Officer
721 Barton Springs Road
Newman & Holtzinger, P.C.
ATTN:
J. R. Newman, Esquire
1615 L Street, N.W.
Washington, D.C.
20036
Houston Lighting & Power Company
ATTN:
S. L. Rosen
P.O. Box 289
Wadsworth, Texas 77483
. _ _ _ _ . _ _ -
-
_ _ _ _ . . _ _ _ _ . _ _ _ _ - - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
___
.
.
.
Houston. Lighting & Power Company
-3-
l
\\
-
3
Houston Lighting & Power Company
ATTN:
R. W. Chewning, Chairman
Nuclear Safety Review Board
P.O. Box 289
Wadsworth, Texas 77483
\\
City Public Service Board
3
ATTN:
R. J. Costello/M. T. Hardt
P.O. Box 1771
San Antonio, Texas 78296
Houston Lighting & Power Company
ATTN:
Licensing Representative
Suite 610
h
Three Metro Center
Bethesda, Maryland 20814
Texas Radiation Control Program Director
bcc to DMB (IE06) -
bec distrib. by RIV:
- DRD
- R. E. Hall
- Section Chief (DRP/D)
- DRS
- MIS System
- RPB-DRSS
Lisa Shea, RM/ALF
- RIV File
R. Bachmann, OGC
- RSTS Operator
- G. Dick, NRR Project Manager (MS:
13-D-18)
- Project Engineer, DRP/D
- R. D. Martin
- B. Murray
- SRI-Unit 1
- SRI-Unit 2
R. L. Bangart
- R. E. Baer
- J. B. Nicholas
- w/766
,
_ _ _ _ _ _ . _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _