ML20235U835

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-498/89-03 & 50-499/89-03 on 890206- 10.No Violations or Deviations Noted.Nrc Has Understanding That Util Will Complete Calibr of Effluent Monitors Installed in Units by 890701
ML20235U835
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/01/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20235U839 List:
References
NUDOCS 8903090393
Download: ML20235U835 (3)


See also: IR 05000498/1989003

Text

- .. _ _ - _ . _ _ _ _ _ _ _ _ . _ _ _ _ __ _ _ _ _

.

  • *

MAR - 1 1989

In Reply Refer To:

Do.ckets: 50-498/89-03

50-499/89-03

Houston Lighting & Power Company

ATTN: J. H. Goldberg, Group Vice

President, Nuclear

P.O. Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Mr. R. E. Baer and Dr. J. B.

Nicholas of this office during the period February 6-10, 1989, of activities

authorized by NRC Operating Licenses NPF-76 and NPF-78 for Units 1 and 2 of the

South Texas Project Electrical Generating Station, and to the discussion of our

findings with Mr. G. E. Vaughn and other members of your staff at the

conclusion of the inspection on February 10, 1989.

Areas examined during the inspection included portions of your radioactive

waste management program. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspectors. The inspection findings are

documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken toward resolving a previously

identified open item regarding calibration of effluent and process radiation

monitors. This matter was discussed during a telephone conversation on

February 14, 1989, between Mr. R. E. Baer of this office and Mr. G. L. Parkey

of your staff. Based on the results of this conversation, it is our

understanding that you will complete the primary calibration of all effluent

radiation monitors installed in Units 1 and 2 by July 1, 1989, and perform the

primary calibration of all Technical Specification process radiation monitors

installed in Units 1 and 2 by December 31, 1989.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

f*+

Original Signni BY

3O g g Ohb3Og oQ B A.B. Beacli

G L. J. Callan, Director

Division of Reactor Projects

Enclosures: (s next page)

RIV:FRPS:RP C:FRPS C:RPB C:PS . Ri!

JBNicholas;1m REBaef BMur ay EHoller L 1an

p/g/89 p jg/89 /y / < 89 $ // /89 3 /i /89

5\

lEcto

i. _ .

M --um mmii

. .

Houston Lighting & Power Company -2-

.

.

Enclosures:

1. Appendix - NRC Inspection Report

50-498/89-03

50-499/89-03

2. Attachment - Documents Reviewed

cc w/ enclosure:

Houston Lightirg & Power Company

ATTN: M. A. McBurnett, Manager

Operations Support Licensing

P.O. Box 289

Wadsworth, Texas 77483

Houston Lighting & Power Company

ATTN: Gerald E. Vaughn, Vice President

Nuclear Operations

P.O. Box 289

Wadsworth, Texas 77483

Houston Lighting & Power Company

ATTN: J. T. Westermeier, General Manager

South Texas Project

P.O. Box 289

Wadsworth, Texas 77483

Central Power & Light Company

ATTN: R. L. Range /R. P. Verret

P.O. Box 2121

Corpus Cht1 .ti, Texas 78403

City of Austin Electric Utility

ATTN: R. J. Miner, Chief Operating

Officer

721 Barton Springs Road

Austin, Texas 78704

Newman & Holtzinger, P.C.

ATTN: J. R. Newman, Esquire

1615 L Street, N.W.

Washington, D.C. 20036

Houston Lighting & Power Company

ATTN: S. L. Rosen

P.O. Box 289

Wadsworth, Texas 77483

. _ _ _ _ . _ _ - - _ _ _ _ . . _ _ _ _ . _ _ _ _ - - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

___

.

. .

Houston. Lighting & Power Company -3- l

-

\

3 Houston Lighting & Power Company

ATTN: R. W. Chewning, Chairman

Nuclear Safety Review Board

P.O. Box 289

Wadsworth, Texas 77483

\

City Public Service Board

3 ATTN: R. J. Costello/M. T. Hardt

P.O. Box 1771

San Antonio, Texas 78296

Houston Lighting & Power Company

ATTN: Licensing Representative

Suite 610

h Three Metro Center

Bethesda, Maryland 20814

Texas Radiation Control Program Director

bcc to DMB (IE06) -

bec distrib. by RIV:

  • DRD *R. E. Hall
  • Section Chief (DRP/D) *DRS
  • MIS System *RPB-DRSS

Lisa Shea, RM/ALF *RIV File

R. Bachmann, OGC *RSTS Operator

  • G. Dick, NRR Project Manager (MS: 13-D-18)
  • Project Engineer, DRP/D *R. D. Martin
  • B. Murray * SRI-Unit 1
  • SRI-Unit 2 R. L. Bangart
  • R. E. Baer *J. B. Nicholas
  • w/766

,

_ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _