Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- HBL-89-015, Semiannual Radioactive Effluent Release Rept Jul-Dec 1988 + (08:57:18, 3 December 2024)
- ML20235V144 + (08:57:18, 3 December 2024)
- ML20235V141 + (08:57:19, 3 December 2024)
- ML20235V138 + (08:57:20, 3 December 2024)
- ML20235V136 + (08:57:21, 3 December 2024)
- PNO-V-87-052, on 870715,loose Copper Windings on Rotor Pole on Train B Diesel Generator Discovered.Caused by Mfg,Parsons Peebles,Improper Application of Resin &/Or Poor Workmanship. Mfg Expected Onsite to Discuss Course of Action + (08:57:21, 3 December 2024)
- ML20235V132 + (08:57:22, 3 December 2024)
- ML20235V131 + (08:57:22, 3 December 2024)
- ML20235V127 + (08:57:23, 3 December 2024)
- ML20235V126 + (08:57:24, 3 December 2024)
- ML20235V122 + (08:57:24, 3 December 2024)
- 05000368/LER-1987-007, :on 870909,reactor Trip on High RCS Occurred. Caused by Failure of Terminal Lug Connecting B phase,120 Volt Ac Electrical Cable to Secondary Side of Transformer 2X11.Repairs Performed + (08:57:27, 3 December 2024)
- ML20235V116 + (08:57:27, 3 December 2024)
- ML20235V115 + (08:57:28, 3 December 2024)
- ML20235V113 + (08:57:29, 3 December 2024)
- TXX-6839, Interim Deficiency Rept CP-87-16 Re Conduit & Cable Which Feed safety-related Valve Limit Switches Not Installed in Accordance W/Wiring Drawings.Initially Reported on 870601. Evaluation Continuing.Next Rept Will Be Submitted by 871211 + (08:57:29, 3 December 2024)
- TXX-6788, Interim Deficiency Rept CP-87-93 Re Motor Control Ctr Starter Coils Which May Not Pick Up at Min Bus Voltage. Initially Reported on 870903.Evaluation Continuing.Next Rept Will Be Submitted by 880108 + (08:57:30, 3 December 2024)
- TXX-6853, Interim Deficiency Rept CP-87-39 Re Optical Isolator Chips Used in NSSS Control Cabinets Furnished to Facility by Westinghouse.Initially Reported on 870715.Next Rept Will Be Submitted on 871207 + (08:57:30, 3 December 2024)
- ML20235V109 + (08:57:31, 3 December 2024)
- ML20235V105 + (08:57:32, 3 December 2024)
- ML20235V104 + (08:57:32, 3 December 2024)
- NRC-87-0178, Advises That Util Planning to Restart on 871009 & Request That Tech Spec Proposed Amend Re Primary Containment Isolation Valves Be Processed Under Emergency Authorization as Allowed by 10CFR50.91(a)(5) + (08:57:33, 3 December 2024)
- ML20235V102 + (08:57:33, 3 December 2024)
- B13127, Proposed Tech Specs,Revising Info on Core Exit Thermocouples,Main Stack wide-range Noble Gas Monitor, Reactor Vessel Water Level & RCS Subcooling Margin Monitor, Per Generic Ltr 83-37 + (08:57:35, 3 December 2024)
- ML20235V089 + (08:57:36, 3 December 2024)
- ML20235V085 + (08:57:37, 3 December 2024)
- ST-HL-AE-2998, Responds to Violations Noted in Insp Repts 50-498/87-01 & 50-499/87-01.Corrective Actions:Emergency Plan & EPIPs Revised to Reflect Incorporation of Unit 2 + (08:57:38, 3 December 2024)
- ML20235V074 + (08:57:41, 3 December 2024)
- ML20235V065 + (08:57:43, 3 December 2024)
- ML20235V064 + (08:57:44, 3 December 2024)
- ML20235V061 + (08:57:44, 3 December 2024)
- IR 05000424/1987037 + (08:57:45, 3 December 2024)
- ML20235V058 + (08:57:46, 3 December 2024)
- 05000374/LER-1989-004-01, :on 890201,determined That Static O-Ring RHR Min Flow Switch Exceeded Rejection Limits During Instrument Surveillance.Reject & Flow Switches Replaced + (08:57:47, 3 December 2024)
- ML20235V053 + (08:57:48, 3 December 2024)
- ML20235V052 + (08:57:49, 3 December 2024)
- ML20235V049 + (08:57:51, 3 December 2024)
- ML20235V048 + (08:57:51, 3 December 2024)
- ML20235V046 + (08:57:52, 3 December 2024)
- ML20235V042 + (08:57:53, 3 December 2024)
- ML20235V041 + (08:57:53, 3 December 2024)
- ML20235V039 + (08:57:54, 3 December 2024)
- ML20235V036 + (08:57:55, 3 December 2024)
- RBG-26757, Updates 870609 & 0814 Ltrs Responding to WR Butler Re Activities in Support of Facility First Refueling Outage.Current Expected Schedules for Identified Activities Requiring NRC Action to Support Refueling Outage Encl + (08:57:55, 3 December 2024)
- ML20235V034 + (08:57:56, 3 December 2024)
- ML20235V031 + (08:57:56, 3 December 2024)
- ML20235V025 + (08:57:58, 3 December 2024)
- ML20235V020 + (08:58:01, 3 December 2024)
- RBG-26761, Application for Amend to License NPF-47,reflecting Organizational Changes within Nuclear Group + (08:58:02, 3 December 2024)
- ML20235V013 + (08:58:03, 3 December 2024)
- ML20235V011 + (08:58:04, 3 December 2024)