Suppls Response to NRC Re Violations Noted in Insp Rept 50-285/85-28.Corrective Actions:Procedures on Control of Plant Keys Revised to Ensure Positive Control of Security Keys
ML20235V105
Person / Time
Site: Fort Calhoun 
Issue date: 07/21/1986
From: Andrews R
OMAHA PUBLIC POWER DISTRICT
To: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
LIC-86-359, NUDOCS 8710140589
Download: ML20235V105 (2)


Text

1 d$$h E!N.. E..

Nfk ENEbb Omaha Public Power District 1623 Harney Omaha. Nebraska 68102 2247 402/536-4000 f, ^p{ l.4

// { Ei, h,

,1 July 21, 1986

{

LIC-86-359 W 2 b P.R

'f 1

J. E. Gagliardo, Chief f

i Reactor Projects Branch

-~

U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Tx. 76011 References

1. Docket No. 50-285
2. Inspection Report 50-285/85-28, dated March 20, 1986
3. Latter OPPC (R. L. Andrews) to NRC (J. E. Gagliardo) dated Acril 18, 1.986 (LIC-86-183)
4. Lett.er NRC (J E. Gagliardo) to OPPD (R. L. Andrews) dated June Cs 1986

Dear Mr. Gagliardo:

Inspection Report-85-28 Supplemental Information in Reference 4, you requested supplemental information on our response to Reference 2.

Attached is the supplemental information requested.

If you require any additional information please do not hesitate to contact us.

Sincerely, l

R. L. Andrews ygolggy$70721300 gs Division Manager G

Nuclear Production RLA/me Attachment cc: LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Ave., N.W.

Washington, DC 20036 Mr. D. E. Sells, NRC Project Manager

\\

Mr. P. H. Harrell, NRC Senior Resident Inspector

.. v; \\[;

)

i rc. - tS~ 7 /M 3

1 \\

o m.,

o,mm-m ao, m ~u MSP f Pff1MP

,. y w

l A

4.

j R a:

j m-.4, hi 1

p' '

1 ATTACHMENT i.j[

As.a result of inspections conducted by Mr. R. ' A. Caldwell and Mr. A. B.

i Earnest,' violations were assessed -for lock and key control.

1 During a telephone call on May 5,1986, OPPD was advised that additional-

.information on corrective. actions was needed.

The District has revised procedures on control of plant keys to ensure positive contro1~of security. keys. The current procedure for central-issue of security keys,' improved. inventory procedures, and a lock' and key register eliminate passing of keys from shift to shift.

-The District is presently:in full' compliance with NRC requirements for lock and key--control.