Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235W012 + (08:49:07, 3 December 2024)
- ML20235W010 + (08:49:08, 3 December 2024)
- ML20235W009 + (08:49:09, 3 December 2024)
- ML20235W007 + (08:49:10, 3 December 2024)
- TXX-6568, Interim Deficiency Rept CP-86-82 Re Welds Used to Splice Cable Tray Hanger (Cth) Channel Sections.Initially Reported on 870106.As-built Verification Program for Cth Installations Complete.Next Rept to Be Submitted by 871120 + (08:49:11, 3 December 2024)
- TXX-6820, Interim Deficiency Rept CP-86-38 Re Failure of Project Procedures to Adequately Address Installation & Insp Criteria for Cable Runs Used as Device Pigtail Extensions. Initially Reported on 870527.Next Rept Expected by 871216 + (08:49:11, 3 December 2024)
- ML20235W004 + (08:49:12, 3 December 2024)
- ML20235W003 + (08:49:12, 3 December 2024)
- ML20235W002 + (08:49:13, 3 December 2024)
- ML20235V998 + (08:49:14, 3 December 2024)
- ML20235V994 + (08:49:15, 3 December 2024)
- ML20235V989 + (08:49:16, 3 December 2024)
- ML20235V985 + (08:49:17, 3 December 2024)
- 05000456/LER-1987-029, :on 870617,discovered That Instrumentation Slave Relay Surveillance Pressure Interlock Missed on 861215.Caused by Procedural Deficiency.Procedure to Be Revised + (08:49:18, 3 December 2024)
- ML20235V981 + (08:49:19, 3 December 2024)
- ML20235V979 + (08:49:20, 3 December 2024)
- TXX-6796, Interim Deficiency Rept CP-87-88 Re Certian 6.9 Kv Switchgear Control Circuits Which Appear to Produce Excessive Voltage Drop.Initially Reported on 870903.Addl Calculations Being Performed.Next Rept by 880115 + (08:49:20, 3 December 2024)
- RBG-26764, Forwards Addenda Pages to Annual Radiological Environ Operating Repts, for Oct-Dec 1985 & Jan-Dec 1986.Data Inadvertently Omitted from Original Submittals & Does Not Affect Plant Operations + (08:49:24, 3 December 2024)
- ML20235V967 + (08:49:25, 3 December 2024)
- ML20235V965 + (08:49:26, 3 December 2024)
- ML20235V961 + (08:49:27, 3 December 2024)
- ML20235V960 + (08:49:28, 3 December 2024)
- ML20235V957 + (08:49:29, 3 December 2024)
- ML20235V949 + (08:49:30, 3 December 2024)
- ML20235V953 + (08:49:30, 3 December 2024)
- ML20235V945 + (08:49:31, 3 December 2024)
- ML20235V943 + (08:49:32, 3 December 2024)
- ML20235V944 + (08:49:32, 3 December 2024)
- ML20235V936 + (08:49:34, 3 December 2024)
- ML20235V938 + (08:49:34, 3 December 2024)
- TXX-6835, Interim Deficiency Rept CP-86-04 Re Placement of Richmond Inserts in Proximity of Loaded Embedded Plates.Initially Reported on 870213.Implementation of Corrective Actions Continuing.Next Rept Will Be Submitted by 871204 + (08:49:35, 3 December 2024)
- ML20235V934 + (08:49:36, 3 December 2024)
- ML20235V933 + (08:49:37, 3 December 2024)
- ML20235V930 + (08:49:38, 3 December 2024)
- ML20235V925 + (08:49:39, 3 December 2024)
- ML20235V917 + (08:49:40, 3 December 2024)
- ML20235V915 + (08:49:41, 3 December 2024)
- ML20235V913 + (08:49:44, 3 December 2024)
- ML20235V910 + (08:49:44, 3 December 2024)
- TXX-6793, Interim Deficiency Rept CP-87-87 Re Chemical Vol & Control Sys Relief Valve Piping.Initially Reported on 870903. Confirmation of Westinghouse Rept Will Be Completed Concurrently W/Review of Valve 1-8117.Next Rept by 871130 + (08:49:45, 3 December 2024)
- ML20235V904 + (08:49:46, 3 December 2024)
- ML20235V903 + (08:49:47, 3 December 2024)
- ML20235V901 + (08:49:48, 3 December 2024)
- ML20235V895 + (08:49:53, 3 December 2024)
- ML20235V893 + (08:49:54, 3 December 2024)
- ML20235V892 + (08:49:54, 3 December 2024)
- ML20235V889 + (08:49:55, 3 December 2024)
- IR 05000295/1987007 + (08:50:00, 3 December 2024)
- ML20235V886 + (08:50:01, 3 December 2024)
- ML20235V887 + (08:50:01, 3 December 2024)
- ML20235V883 + (08:50:03, 3 December 2024)
- ML20235V881 + (08:50:03, 3 December 2024)