Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235X220 + (08:37:32, 3 December 2024)
- ML20235X216 + (08:37:33, 3 December 2024)
- ML20235X218 + (08:37:33, 3 December 2024)
- TXX-6841, Interim Deficiency Rept CP-87-105 Re Conductor Lug Terminations.Initially Reported on 870914.Conductor Lug Terminations May Be Inadequate Due to Improper Crimping of Lug Barrels.Next Rept Will Be Submitted by 880119 + (08:37:34, 3 December 2024)
- ML20235X210 + (08:37:35, 3 December 2024)
- TXX-6854, Advises of New Mgt Appointments.Cl Terry Appointed Unit 1 Project Manager Effective 870915 & Rd Walker Appointed Manager,Nuclear Licensing Effective 871005 + (08:37:35, 3 December 2024)
- ML20235X199 + (08:37:37, 3 December 2024)
- ML20235X198 + (08:37:38, 3 December 2024)
- ML20235X197 + (08:37:39, 3 December 2024)
- ML20235X196 + (08:37:40, 3 December 2024)
- ML20235X195 + (08:37:41, 3 December 2024)
- IR 05000266/1987018 + (08:37:45, 3 December 2024)
- 05000440/LER-1987-042, :on 870617,reactor Protection Sys Electrical Protection Assembly Breaker Tripped,Resulting in Deenergization of Bus A.Caused by Failure of Assembly Logic Card.Card Replaced + (08:37:47, 3 December 2024)
- RBG-30174, Special Rept:On 890204,temp in Main Steam Tunnel Rose Above Tech Spec 3/4.7.8 Limit of 135 F.Caused by Packing Leak from Penetration Leakage Control Sys Valve.Valve Packing Will Be Repaired at Next Available Outage of Sufficient Duration + (08:37:47, 3 December 2024)
- ML20235X191 + (08:37:48, 3 December 2024)
- 05000336/LER-1989-002-02, :on 890204,six of Sixteen Valves Tested Failed Initial Simmer Test.Cause Unknown.One Valve Passed Next Two Consecutive Tests W/O Further Adjustment.Four Valves Adjusted in Place + (08:37:50, 3 December 2024)
- ML20235X188 + (08:37:50, 3 December 2024)
- ML20235X186 + (08:37:51, 3 December 2024)
- ML20235X185 + (08:37:52, 3 December 2024)
- ML20235X184 + (08:37:52, 3 December 2024)
- ML20235X183 + (08:37:53, 3 December 2024)
- 0CAN048513, Responds to 850426 Telcon & Confirms Info Provided During Later Telcon on 850426 Re Actions Taken by Util to Restrict Use of North Gate at Plant + (08:37:54, 3 December 2024)
- ML20235X181 + (08:37:54, 3 December 2024)
- ML20235X178 + (08:37:55, 3 December 2024)
- ML20235X177 + (08:37:55, 3 December 2024)
- ML20235X176 + (08:37:56, 3 December 2024)
- ST-HL-AE-2301, Forwards Certification That 870518 Final Draft Tech Specs as Revised by 870707 Draft Page Changes,Consistent W/Fsar,Ser & as-built Facility.Final Draft Ready for Incorporation Into Ol,App a Tech Specs for Unit 1 + (08:37:57, 3 December 2024)
- ML20235X172 + (08:37:58, 3 December 2024)
- ML20235X171 + (08:37:58, 3 December 2024)
- ML20235X169 + (08:37:59, 3 December 2024)
- ML20235X170 + (08:37:59, 3 December 2024)
- ML20235X168 + (08:38:00, 3 December 2024)
- 05000155/LER-1989-003, :on 880630,during Receipt Insp of Kerotest Globe Valve,Discovered That Valve Disc Assembly Rattled Inside Valve Body.Evaluation Implies That Overtorqued Condition Occurred After Shipment + (08:38:02, 3 December 2024)
- ML20235X165 + (08:38:02, 3 December 2024)
- ML20235X164 + (08:38:03, 3 December 2024)
- ML20235X161 + (08:38:07, 3 December 2024)
- IR 05000454/1989002 + (08:38:10, 3 December 2024)
- ML20235X154 + (08:38:11, 3 December 2024)
- ML20235X155 + (08:38:11, 3 December 2024)
- ML20235X153 + (08:38:12, 3 December 2024)
- ML20235X151 + (08:38:14, 3 December 2024)
- 05000333/LER-1987-014, :on 870912,automatic Initiation of 4 Kv Emergency Bus Degraded Voltage Protection Sys Occurred. Caused by Sys Design.Operating Procedure Changed to Require Performance of Load Transfer by Two Operators + (08:38:14, 3 December 2024)
- ML20235X149 + (08:38:15, 3 December 2024)
- ML20235X147 + (08:38:16, 3 December 2024)
- ML20235X144 + (08:38:17, 3 December 2024)
- B12592, Responds to & Comments on Findings of SALP Board W/Emphasis on Board Recommendations for Individual Evaluation Categories.Response to Each of Board Recommendations for Plant Encl.Util Goal to Return to Category 1 in All Areas + (08:38:18, 3 December 2024)
- ML20235X136 + (08:38:19, 3 December 2024)
- ML20235X138 + (08:38:19, 3 December 2024)
- ML20235X134 + (08:38:20, 3 December 2024)
- ML20235X128 + (08:38:21, 3 December 2024)
- ML20235X130 + (08:38:21, 3 December 2024)