Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235Y365 + (08:30:32, 3 December 2024)
- B12600, Submits Info Re ECCS Mods,Per NRC 870707,10 & 15 Telcons. Attachment 1 Provides Random Stress Summary by Data Point for 8-inch Piping Cross Tie Between RHR & Safety Injection Sys.W/One Oversize Drawing + (08:30:34, 3 December 2024)
- ML20235Y358 + (08:30:34, 3 December 2024)
- TXX-6856, Advises That Date of Full Compliance Stated in Util 870522 Response to Violations Noted in Insp Repts 50-445/86-15 & 50-446/86-12 Revised to 880301 & 890301 for Units 1 & 2, Respectively + (08:30:35, 3 December 2024)
- ML20235Y354 + (08:30:35, 3 December 2024)
- ML20235Y353 + (08:30:36, 3 December 2024)
- ML20235Y352 + (08:30:37, 3 December 2024)
- ML20235Y351 + (08:30:37, 3 December 2024)
- IR 05000309/1987019 + (08:30:38, 3 December 2024)
- ML20235Y349 + (08:30:38, 3 December 2024)
- ML20235Y347 + (08:30:39, 3 December 2024)
- ML20235Y346 + (08:30:40, 3 December 2024)
- ML20235Y345 + (08:30:40, 3 December 2024)
- ML20235Y343 + (08:30:41, 3 December 2024)
- ML20235Y341 + (08:30:42, 3 December 2024)
- ML20235Y339 + (08:30:43, 3 December 2024)
- ML20235Y337 + (08:30:44, 3 December 2024)
- IR 05000445/1989001 + (08:30:52, 3 December 2024)
- ML20235Y332 + (08:30:53, 3 December 2024)
- ST-HL-AE-2241, Forwards Response to Request for Addl Info Per IE Bulletin 86-002 Re Differential Pressure Switches Mfg by Sor,Inc. Results of Testing of Auxiliary Steam Sys Switch Indicates No Drift from Tolerance.No Concerns Exist + (08:30:54, 3 December 2024)
- ML20235Y330 + (08:30:55, 3 December 2024)
- ML20235Y328 + (08:30:56, 3 December 2024)
- IR 05000336/1987011 + (08:30:58, 3 December 2024)
- ML20235Y323 + (08:30:59, 3 December 2024)
- ML20235Y325 + (08:30:59, 3 December 2024)
- ML20235Y321 + (08:31:00, 3 December 2024)
- ML20235Y319 + (08:31:01, 3 December 2024)
- ML20235Y317 + (08:31:01, 3 December 2024)
- ML20235Y315 + (08:31:03, 3 December 2024)
- ML20235Y313 + (08:31:04, 3 December 2024)
- ML20235Y312 + (08:31:05, 3 December 2024)
- ML20235Y311 + (08:31:05, 3 December 2024)
- ML20235Y305 + (08:31:06, 3 December 2024)
- ML20235Y309 + (08:31:06, 3 December 2024)
- ML20235Y300 + (08:31:08, 3 December 2024)
- IR 05000321/1988034 + (08:31:09, 3 December 2024)
- IR 05000344/1987027 + (08:31:10, 3 December 2024)
- 05000219/LER-1987-033, :on 870911,Tech Spec Safety Limit Requiring Two Recirculation Loops to Be Fully Opened Violated.Caused by Personnel Error.Addl Training for Operators Will Be Provided & Procedure Revs in Progress + (08:31:12, 3 December 2024)
- ML20235Y293 + (08:31:13, 3 December 2024)
- ML20235Y292 + (08:31:14, 3 December 2024)
- ML20235Y290 + (08:31:15, 3 December 2024)
- ST-HL-AE-2392, Forwards Description Change in Initial Test Program, Addressing Delay of Completion of Essential Ac Lighting Sys Acceptance Test Until Prior to Entry Into Mode 2.Confirms That Unreviewed Safety Question Does Not Exist + (08:31:15, 3 December 2024)
- TXX-6476, Informs That FSAR Table 17A-1 Will Not Include safety- Related Masonry Walls or Supports But Will Include Nonseismic Masonry Walls to Document Interaction Evaluation Requirements,Per NRC 870311 Concerns + (08:31:16, 3 December 2024)
- ML20235Y286 + (08:31:16, 3 December 2024)
- 05000416/LER-1987-015, :on 870917,RWCU Sys Isolation Occurred.Caused by High Differential Flow Signal Received During Startup in Prepump Mode of Operation.Sys Operating Instruction Will Be Changed to Require Use of Bypass Switch + (08:31:18, 3 December 2024)
- ML20235Y283 + (08:31:19, 3 December 2024)
- ML20235Y282 + (08:31:20, 3 December 2024)
- ML20235Y276 + (08:31:21, 3 December 2024)
- ML20235Y275 + (08:31:21, 3 December 2024)
- ML20235Y271 + (08:31:22, 3 December 2024)
- TXX-6574, Interim Deficiency Rept CP-87-08 Re Accuracy Tolerance of Calibr of Dead Weight Tester Used as Std in Calibr Pressure Instrumentation.Initially Reported on 870420.Evaluation Underway.Next Rept Will Be Submitted by 871023 + (08:31:22, 3 December 2024)