Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235Z479 + (08:19:49, 3 December 2024)
- IR 05000423/1987016 + (08:20:12, 3 December 2024)
- ML20235Z475 + (08:20:14, 3 December 2024)
- ML20235Z470 + (08:20:14, 3 December 2024)
- ML20235Z469 + (08:20:15, 3 December 2024)
- ML20235Z467 + (08:20:16, 3 December 2024)
- ML20235Z463 + (08:20:17, 3 December 2024)
- ML20235Z461 + (08:20:18, 3 December 2024)
- ML20235Z460 + (08:20:18, 3 December 2024)
- ML20235Z454 + (08:20:20, 3 December 2024)
- 05000259/LER-1980-090-03, /03L-1:on 801210,during Normal Operation, Continuous Air Monitor for Reactor/Turbine Ventilation Exhaust Declared Inoperable.Caused by Iodine Channel Indication Downscale.Instrument Repaired + (08:20:22, 3 December 2024)
- ML20235Z449 + (08:20:22, 3 December 2024)
- ML20235Z447 + (08:20:23, 3 December 2024)
- ML20235Z446 + (08:20:24, 3 December 2024)
- ML20235Z443 + (08:20:25, 3 December 2024)
- ML20235Z441 + (08:20:26, 3 December 2024)
- ML20235Z440 + (08:20:27, 3 December 2024)
- ML20235Z439 + (08:20:27, 3 December 2024)
- ML20235Z437 + (08:20:28, 3 December 2024)
- ML20235Z435 + (08:20:29, 3 December 2024)
- ML20235Z436 + (08:20:29, 3 December 2024)
- NRC-87-0203, Forwards Revised Attachment 1 to Relief Request PR-10-R2 Re Alternative Vibration Acceptance Criteria for HPCI Pump Until Replacement of Booster Pump Impeller Scheduled for First Refueling Outage + (08:20:30, 3 December 2024)
- ML20235Z428 + (08:20:31, 3 December 2024)
- ML20235Z426 + (08:20:32, 3 December 2024)
- ML20235Z423 + (08:20:33, 3 December 2024)
- ML20235Z422 + (08:20:34, 3 December 2024)
- ML20235Z416 + (08:20:35, 3 December 2024)
- ML20235Z421 + (08:20:35, 3 December 2024)
- ML20235Z414 + (08:20:36, 3 December 2024)
- PNO-I-87-095, on 871015,State of Ma Atty General Jm Shannon Filed Petition Requesting Order to Show Cause Why Plant Should Not Remain Closed Until Full Adjudicatory Hearing Resolves Issues Re GE Mark I Containment & Evacuation Plans + (08:20:37, 3 December 2024)
- ML20235Z409 + (08:20:38, 3 December 2024)
- ML20235Z407 + (08:20:39, 3 December 2024)
- ML20235Z408 + (08:20:39, 3 December 2024)
- ML20235Z402 + (08:20:40, 3 December 2024)
- ST-HL-AE-2951, Notifies of Intention Not to Install All High Density Spent Fuels Racks in Spent Fuel Pools at Present Time.Sketch Showing Rack Installation Plan in Spent Fuel Pool Attached + (08:20:41, 3 December 2024)
- ML20235Z393 + (08:20:42, 3 December 2024)
- ML20235Z390 + (08:20:44, 3 December 2024)
- ML20235Z387 + (08:20:45, 3 December 2024)
- ML20235Z386 + (08:20:46, 3 December 2024)
- ML20235Z378 + (08:20:49, 3 December 2024)
- ML20235Z377 + (08:20:50, 3 December 2024)
- ML20235Z376 + (08:20:50, 3 December 2024)
- ML20235Z375 + (08:20:51, 3 December 2024)
- 05000265/LER-1988-029, :on 881214,determined That Calibr of Level Indicator Not Completed & on 890105,determined That Source Range Monitor Indicators Did Not Have Surveillance Procedures.Caused by Inadequate Procedures + (08:20:53, 3 December 2024)
- ML20235Z372 + (08:20:55, 3 December 2024)
- 05000424/LER-1987-056, :on 870916,cumulative Dose Calculations Program for Gaseous Effluent Releases to Atmosphere for Radioiodines Did Not Include I-133.Caused by Software Package Failure to Include I-133.Package Corrected + (08:20:57, 3 December 2024)
- ML20235Z366 + (08:20:58, 3 December 2024)
- ML20235Z363 + (08:20:59, 3 December 2024)
- ML20235Z364 + (08:20:59, 3 December 2024)
- ML20235Z362 + (08:21:00, 3 December 2024)
- ML20235Z358 + (08:21:01, 3 December 2024)
- NLS8700519, Comments on Anl 851003-04 Plant Visit Summary Re Control Room Ventilation Sys.Change to Updated SAR Will Be Processed to More Accurately Describe Fact That Damper AD 1021-02 Will Remain Open & Butterfly Valve Will Close + (08:21:01, 3 December 2024)