Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:55704 + (01:31:06, 26 May 2025)
- TAC:69934 + (01:32:13, 26 May 2025)
- TAC:56337 + (01:33:49, 26 May 2025)
- 05000282/LER-1996-006, :on 960217,cooling Water Surveillance Tests Missed as Result of Rescheduling Error Occurred.Caused by Personnel Error.Surveillance Procedure Will Be re-written to Split Unit 1 + (01:33:55, 26 May 2025)
- 05000341/LER-1996-003, :on 960216,ECCS Outside Design Basis During ESF Bus 64C Undervoltage Protection Testing Occurred.Caused by Consequences of Bus 64C Udervoltage Testing Lineup.Dedicated Operator W/No Duties Stationed in CR + (01:33:56, 26 May 2025)
- ML20101D783 + (01:34:19, 26 May 2025)
- 05000354/LER-1995-038, :on 951127,failed to Comply W/Required Action Statement Upon Removal of Failed Snubber on RHR SDC Line.C/A to Avoid Unnecessary SDC Isolations & Associated Potential for Water Hammer Events Identified & Assigned in CAP + (01:34:37, 26 May 2025)
- ML20101D375 + (01:34:46, 26 May 2025)
- ML20101C666 + (01:35:47, 26 May 2025)
- 05000302/LER-1992-006, :on 920501,four safety-related Pipe Supports Did Not Meet Minimum Fs as Specified in NRC IE Bulletin 79-02.Caused by Design Oversight by Ae Firm in 1984.Sys Modified in Compliance W/Bulletin 79-02 + (01:36:57, 26 May 2025)
- TXX-9121, Discusses Confirmatory Testing of Thermo-Lag Fire Barrier Sys.Comprehensive Confirmatory Testing Program Initiated to Envelope Full Range of Protected Conduit & Cable Tray Configurations.Testing Scheduled for Second Wk in June + (01:38:07, 26 May 2025)
- ML20101A865 + (01:38:36, 26 May 2025)
- TXX-9217, Forwards Evaluation of Indication Discovered in Nozzle to Channel Head Weld on Tube Side Outlet Nozzle of RHR HX (TBX-RHAHRS-01) During First Refueling Outage ASME Section XI ISI Exam.Weld Will Be Reexam During Next Insp Period + (01:39:13, 26 May 2025)
- 05000498/LER-1989-017, Informs NRC of Change to Commitment Made as Result of LER 89-017 Re Event Involving Inadvertent Contamination of Nonradioactive Sys on 890814.Mods 89228,89229,89239 & 89231 No Longer Necessary.Justification Included + (01:39:25, 26 May 2025)
- ML20100R440 + (01:39:50, 26 May 2025)
- L-96-004, Monthly Operating Repts for Feb 1996 for Point Beach Nuclear Plant,Units 1 & 2 + (01:40:13, 26 May 2025)
- 05000341/LER-1996-001, :on 960205,EDG CW Function Potentially Lost Due to Ice Formation in Pump Columns.Performed Operability Determination on Dgsw Pumps B & C + (01:40:28, 26 May 2025)
- 05000369/LER-1984-029, :on 841029,concentration of Nitrogen in Upper Head Injection Accumulator Exceeded Tech Spec Limits.Caused by Repetitive Continuous Makeup to Accumulator from Upper Head Injection Surge Tank + (01:41:15, 26 May 2025)
- 05000482/LER-1996-002, :on 960130,lost a Train ESW Due to Icing on Trash Racks.Contingency Plans Developed to Be Implemented Whenever Lake Temp Drops to 40F or Lower & Air Bubblers Being Maintained in Outer Bays to Sweep Frazil Ice + (01:41:31, 26 May 2025)
- 05000261/LER-1981-002-01, /01T-3:on 810113,review of Svc Water Sys Revealed Potential Unmonitored Release Path to Environ.Caused by Lack of Radiation Monitoring on Svc Water Return Lines from Containment.Discharge Lines Modified + (01:42:12, 26 May 2025)
- 05000255/LER-1984-022, :on 840704,containment Dome Temp Measured at 138 F.Determined Reportable on 841022.Caused by Personnel Error.Containment Temp Limits Established + (01:43:19, 26 May 2025)
- TAC:65303 + (01:44:37, 26 May 2025)
- ML20100L151 + (01:46:54, 26 May 2025)
- TAC:49459 + (01:47:07, 26 May 2025)
- ML20100J454 + (01:49:26, 26 May 2025)
- ML20100H291 + (01:51:05, 26 May 2025)
- ML20100G890 + (01:51:45, 26 May 2025)
- 05000255/LER-1996-002-01, :on 960116,initiated TS Required Shutdown Due to Safeguards Cable Fault.Root Cause of Failure Under Investigation.Const Cable Installation Spec Will Be Revised & Testing of Faulted Cable Will Be Performed + (01:51:55, 26 May 2025)
- TAC:57263 + (01:51:57, 26 May 2025)
- TAC:54723 + (01:52:08, 26 May 2025)
- TAC:57471 + (01:52:52, 26 May 2025)
- ML20100G113 + (01:53:06, 26 May 2025)
- ML20100G108 + (01:53:07, 26 May 2025)
- ML20100F860 + (01:53:44, 26 May 2025)
- ML20100F722 + (01:53:56, 26 May 2025)
- IR 05000275/2020301 + (01:55:15, 26 May 2025)
- ML20100E197 + (01:55:55, 26 May 2025)
- ML20100D616 + (01:56:28, 26 May 2025)
- ML20100C065 + (01:57:50, 26 May 2025)
- ML20100B291 + (01:59:09, 26 May 2025)
- IR 05000269/1984025 + (02:03:39, 26 May 2025)
- PMNS20200296, Pre-Submittal Meeting for Subsequent License Renewal Application for North Anna Power Station, Units 1 and 2 + (02:03:45, 26 May 2025)
- ML20099K298 + (02:04:11, 26 May 2025)
- ML20099K226 + (02:04:23, 26 May 2025)
- ML20099H607 + (02:06:38, 26 May 2025)
- ML20099H530 + (02:06:50, 26 May 2025)
- 05000416/LER-1992-015, :on 920709,automatic Actuation of RWCU Sys Inboard Containment Isolation Valves Occurred & Leak Detection RWCU HX Room High Temp Annunicator Alarmed.Caused Not Yet Determined.Investigation Underway + (02:06:59, 26 May 2025)
- ML20099G942 + (02:07:46, 26 May 2025)
- ML20099G100 + (02:09:11, 26 May 2025)
- ML20099F498 + (02:09:40, 26 May 2025)