Forwards Rev 3 to CCNPP EALs Technical Basis Document (Tbd). TBD Meets RG 1.101 Criteria & Approved by Nrc. Changes Effected by Rev 3 of TBD Will Be Incorporated in Rev 18,Change 5 of Erpip 3.0, Immediate Actions
ML20100G108
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/15/1996
From: Cruse C
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20100G111 List:
References
RTR-REGGD-01.101, RTR-REGGD-1.101 NUDOCS 9602220361
Download: ML20100G108 (2)


Text

- _ - - - _ _ - _ _ _ _ _ _ _ _ _ _

J e i.

,1 Cucaxs H. Cat sE Baltimore Gas and Electric Company Vice President Calvert Cliffs Nuclear Power Plant Nuclear Energy 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4455 1

February 15,1996 l

l U. S. Nuclear Regulatory Commission Washington,DC 20555 ATTENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Independent Spent Fuel Storage Facility Docket No. 72-8 l

Revision to Emergency Action Levels Technical Basis Document f

REFERENCE:

(a)

Letter from Mr. D. G. Mcdonald, Jr. (NRC) to Mr. R. E. Denton (BGE),

dated April 12, 1994, Emergency Action Levels, Calvert Cliffs Nuclear r

Power Plant Units 1 and 2 (TAC Nos. M87080 and M87081)

Enclosed for your information is Revision 3 to the Calvert Cliffs Nuclear Power Plant Emergency Action Levels Technical Basis Document. The Technical Basis Document meets Regulatory Guide 1.101 criteria i

I l

(i.e., NUMARC/NESP-007, Methodology for Development of Emergency Action Levels), and has been l

approved by the NRC (Reference a). (NOTE: Since Revision 2 was canceled prior to implementation; the changes shown in the enclosed Revision 3 reflect all the changes made to Revision 1 of the Technical Basis Document.)

The Emergency Action Level changes that will be effected by Revision 3 of the Technical Basis Document l

will be incorporated in Revision 18, Change 5, of Calvert Cliffs Emergency Response Plan Implementation Procedure 3.0, "Immediate Actions."

Emergency Response Plan Implementation Procedure 3.0, Revision 18, Change 5, will be implemented approximately 90 days from the date of this letter, but not earlier than 45 days. This implementation date allows for staff training and for other internal document processing requirements. The Emergency Action Level Technical Basis Document, Resision 3, changes have been reviewed and endorsed by appropriate State and local agencies.

9602220361 960215 PDR ADOCK 05000317 8

4( 0l1 220098

'h

\\

DbcuhkIt ControlDesk February 15,1996 Page 2 a

Should you have questions regarding this matter, please contact Mr. T. E. Forgette, Director-Emergency Planning, at (410) 495-4996.

Very truly yours, 4 s' CHC/GT/ dim

Enclosure:

Revision 3 to the Calvert Cliffs Nuclear Power Plant Emergency Action Levels Technical Basis Document cc:

(Without Enclosure)

D. A. Brune, Esquire J. E. Silberg, Esquire L. B. Marsh, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC Resident Inspector, NRC R. I. McLean, DNR J. H. Walter, PSC 1

e