Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20117F397 + (22:22:36, 25 May 2025)
- ML20117F369 + (22:22:39, 25 May 2025)
- ML20117F029 + (22:23:04, 25 May 2025)
- 05000336/LER-1994-027-01, :on 940903,channel B Linear Range Ni Drawer Opened & Technicians Found Connector J6 Disconnected from Jack.Caused by Personnel Error.Reconnected HV Connector J6 & Ensured Proper Operation of Channel B + (22:23:25, 25 May 2025)
- ML20117D266 + (22:24:41, 25 May 2025)
- 05000352/LER-1985-045, :on 850401,License Condition 2.C.8.(b) Requiring SPDS Operability by 850401 Not Met.Caused by Incomplete Validation Process Pending 100% Power Level for Final Tests.Completion Schedule Proposed + (22:25:11, 25 May 2025)
- 05000315/LER-1985-010-01, :on 850112 & 0406,dose Equivalent I-131 of Reactor Coolant Exceeded Tech Spec Limit.Caused by Leaking Fuel Assemblies.Fuel Sipping Will Be Performed During 1985 Refueling Outage + (22:25:13, 25 May 2025)
- TAC:51908 + (22:25:19, 25 May 2025)
- ML20117C623 + (22:25:26, 25 May 2025)
- ML20117C507 + (22:25:35, 25 May 2025)
- 05000275/LER-1985-011, :on 850217,manual Reactor Trip Initiated in Response to Automatic Shutdown of Main Feedwater Pumps 1-1 & 1-2 from Excessive Thrust Bearing Wear Indication.Thrust Bearing Wear Detection Sys Reset + (22:25:36, 25 May 2025)
- ML20117C494 + (22:25:38, 25 May 2025)
- 05000528/LER-1985-022, :on 850402,during Performance of Retesting Per Contractor Work Order (Cwo) 81614,inadvertent Start of Diesel Generator B Occurred.Caused by Energizing of 4EX1 Relay Due to Sneak Circuit.Cwo Amended + (22:25:40, 25 May 2025)
- 05000395/LER-1985-008, :on 850404,reactor Manually Tripped Due to Loss of Various Secondary Plant Indications.Trip Resulted in Unmonitored Release from Main Steam Sys Relief Valves.Caused by Failure of Primary & Secondary Fuses + (22:25:42, 25 May 2025)
- ML20117C470 + (22:25:43, 25 May 2025)
- ML20117C217 + (22:25:57, 25 May 2025)
- ML20117C204 + (22:25:59, 25 May 2025)
- ML20117C191 + (22:26:00, 25 May 2025)
- ML20117C177 + (22:26:03, 25 May 2025)
- ML20117C139 + (22:26:05, 25 May 2025)
- ML20117B320 + (22:26:34, 25 May 2025)
- 05000354/LER-1995-033-09, Forwards LER 95-033-09.Suppl Documents of Surveillance Implementation Deficiencies + (22:27:08, 25 May 2025)
- 05000341/LER-1996-010, :on 960719,ESF Actuation & HPCI System Suction Flow Path Transfer Occurred.Caused by Radio Frequency Interference.Posting of CST Instrument Panel and CST Area Completed & Work Request to Repair Phone Initiated + (22:27:24, 25 May 2025)
- ML20116P340 + (22:27:35, 25 May 2025)
- ML20116P312 + (22:27:40, 25 May 2025)
- ML20116P246 + (22:27:46, 25 May 2025)
- ML20116P206 + (22:27:50, 25 May 2025)
- ML20116P164 + (22:28:01, 25 May 2025)
- ML20116P145 + (22:28:05, 25 May 2025)
- ML20116M497 + (22:30:48, 25 May 2025)
- TAC:M95848 + (22:31:30, 25 May 2025)
- 05000302/LER-1982-061-03, /03X-1:on 820929,fan Damper Operator on Industrial Cooler Failed & Reactor Bldg Average Temp Exceeded 130 F Limit of Tech Specs.Caused by Water in Instrument Air Sys Due to Personnel Error.Procedures Reviewed + (22:32:04, 25 May 2025)
- 05000259/LER-1984-022, :on 840512,determined That Necessary Cooling Equipment for Some Electrical Board Rooms Could Be Lost During Loca.Caused by Design Oversight on Load Shed Logic. Mods Scheduled + (22:32:14, 25 May 2025)
- 05000266/LER-1992-009, :on 921012,identified That CCW Sys Surge Tank Vent Valves 1&2cc-00017 Did Not Meet Design Basis.Caused by Oversight During Original Design of CCW Sys.Design Will Be Evaluated & Modified If Necessary + (22:33:22, 25 May 2025)
- L-96-016, Monthly Operating Repts for Jul 1996 for Point Beach Nuclear Plant Units 1 & 2 + (22:33:49, 25 May 2025)
- ML20116J920 + (22:34:29, 25 May 2025)
- 05000266/LER-1992-004, :on 920515,improper Sequencing of Emergency Safety Features Occurred.Caused by Faulty Relay for 1-W1B1.Time Delay Relay Replaced & Adjusted to within Acceptance Criteria + (22:34:57, 25 May 2025)
- L-96-015, Forwards Unit 1 Refueling 23 ISI Summary Rept for Form NIS-1 + (22:35:44, 25 May 2025)
- 05000285/LER-1992-029, :on 920416,RPT Responding to Heat Stress Situation Received an Unanticipated Intake of Radioactive Matl Due to Deficiencies in Method Used to Change Filters. Maint & RP Procedures Revised + (22:37:02, 25 May 2025)
- 05000325/LER-1979-040-01, /01T-1:on 790525,reanalysis Determined That Hanger Supports Lack Capability to Carry Calculated Loads Under Worst Case Seismic Conditions Per IE Bulletin 79-07. Supports Strengthened + (22:37:41, 25 May 2025)
- 05000302/LER-1996-006-05, Forwards LER 96-006-05.Suppl Provides Revised Corrective Action Schedule.Ler Will Be Tracked by Util Internal Administrative Controls + (22:38:04, 25 May 2025)
- 05000324/LER-1980-121-03, /03L-1:on 801229,following Reactor Scram,Reactor Level Instrument 2-B21-LI-R604A Did Not Track Properly to Decreasing Reactor Level.Caused by Instrument Level Transmitter 2-B21-LT-N026A Out of Calibr + (22:38:33, 25 May 2025)
- ML20116F245 + (22:38:43, 25 May 2025)
- 05000354/LER-1995-033-08, Forwards LER 95-033-08.Suppl Documents Discovery of TS Surveillance Implementation Deficiency Identified by TS Surveillance Improvement Program + (22:39:04, 25 May 2025)
- TAC:75467 + (22:39:38, 25 May 2025)
- ML20116D786 + (22:40:52, 25 May 2025)
- ML20116A660 + (22:44:39, 25 May 2025)
- ML20116A298 + (22:44:55, 25 May 2025)
- ML20116A250 + (22:44:57, 25 May 2025)
- 05000327/LER-1996-006-02, :on 960623,failed Coupled Capacitor Potential Device Caused Actuation of Generator Backup/Transfomer Feeder Relay Tripping Turbine & Reactor.Removed & Replaced Ccpd + (22:45:10, 25 May 2025)
- ML20115K089 + (22:45:24, 25 May 2025)