ML20117C191

From kanterella
Jump to navigation Jump to search
Forwards List of Documents Re Facility ATWS Events,In Response to 831003 Request
ML20117C191
Person / Time
Site: 05000000, Salem
Issue date: 03/11/1983
From: Allan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rehm T
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20114F930 List:
References
FOIA-84-616 NUDOCS 8505090353
Download: ML20117C191 (2)


Text

-

l I

ER1} 1983 MEMORANDUM FOR:

Thomas Rehm Assistant for Operations, Office of Executive Director for Operations FROM:

James M. Allan, Deputy Regional Administrator, Region I

SUBJECT:

REQUEST FOR DOCUMENTS CONCERNING SALEM ATWS EVENT (Your note to H. Denton et. al. dated 3/10/83)

The enclosed list is in response to your note requesting all documents that Region I has related to the Salem ATWS' event.

We are awaiting your directions regarding which documents you require and where they should be sent.

Original Signed By:

James M. Allan Deputy Regional Administrator

Enclosure:

As Stated cc w/ enc 1:

H. Denton, NRR J. Heltames, AE0D R. DeYoung IE bec w/ enc 1:

T. T. Martin R. W. Starostecki R. R. Keimig 85050g353 BM PDR

{

NFIELO-616

'4 2

ai.R1 :M) e=~~>.k.. :....me e.....7;,y,,,,,,,,

's

'l......

  • * " >.....Eu/.e.3..

w:e rc:= m o o..o. unc= on' OFFICIAL RECORD COPY 1

SALEM DOCUMENTS i

I 2/22 Regional Duty Officer log - 2/22/83 2/23 Region I Morning Report Preliminary Notification 83-10 Reactor Trip and Safety Injection 2/24 Region I Morning Report 2/25 Region I Morning Report Preliminary Notification PNI-I-83-ll Reactor Trip Breakers failed to open (ATWS Preliminary Notification PNO-I-83-11A, Reactor Trip Breakers failed to Open (ATWS)

Regional Duty Officer log - 2/25/83 NRC Bulletin 83-01 Failure of Reactor Trip Breakers to Open on Trip Signal 2/25 Licensee Event Report 83-011/lP 2/28 Memo, W. Dircks to H. Denton, Evaluation of the Implications of the Salem Unit '

Event 3/1 Letter R. Uderitz to D. Eisenhut Letter to Denton from Chaiman of Westinghouse Owners Group on Salem RT Breaker

'"I Westinghouse letter to H. Denton, 3/1 3/7 Regton I Confimatory Action Letter 3/8 Memo to C. J. Heltames, Director, Office of Analysis and Evaluation, Oraft of Possible Abnomal Occurence Letter R. Uderitz to R. Starostecki 3/9 PSEAGCo Reply to Region I CAL Undated Response to Senator Simpson Questions Senior Resident Inspector evaluation of Management Capability at Salem DSI/ICS8 input to Salem 1 Restart SER Draft Human Factors Input to Restart Report PSEAG Co Operational Quality Assurance Program Review Agenda for RRG Meetings March 8 - 11, 1983 Salem Restart Action Plan Investigation into Circumstances Surrounding Salem Failure to Scram - Region I Task Force Report Charter.for Investigation Team TIA 83-20 Salem 1 = Restart from 2/25/83 Event Slides for Connission Briefing s

-