Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000333/LER-1992-035, :on 920825,circuit Breaker Supplying Power to Load Ctr step-down Transformer Tripped,Resulting in ESF Actuation & Loss of Effluent Monitoring.Caused by Failure of Transformer T-13.Transformer Replaced W/Spare + (22:10:11, 25 May 2025)
- TAC:M56110 + (22:11:02, 25 May 2025)
- 05000336/LER-1992-015-01, :on 920821,determined That SPEC 200 Cabinets Mfg by Foxboro Co May Not Be Seismically Qualified as Result of Missing Bumpers.Caused by Lack of Vendor Instruction.Seismic Bumpers Ordered + (22:11:10, 25 May 2025)
- TAC:M65955 + (22:11:12, 25 May 2025)
- 05000331/LER-1992-013, :on 920817,automatic Reactor Scram Initiated Due to Perceived High Average power-range Neutron Flux Level.Caused by Noise Signal Which Affected Recirculation Flow Signals.Circuit Inductors Installed + (22:11:21, 25 May 2025)
- TAC:M80424 + (22:11:38, 25 May 2025)
- L-91-268, Advises That Util,In Cooperation W/State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Emergency Plan on 911204.Exercise Will Involve Participation by Local & State Emergency Response Personnel + (22:12:09, 25 May 2025)
- ML20117P943 + (22:12:19, 25 May 2025)
- TAC:64607 + (22:12:30, 25 May 2025)
- ML20117P431 + (22:12:53, 25 May 2025)
- ML20117P429 + (22:12:55, 25 May 2025)
- ML20117P408 + (22:12:57, 25 May 2025)
- ML20117P127 + (22:13:15, 25 May 2025)
- ML20117N069 + (22:14:23, 25 May 2025)
- ML20117N039 + (22:14:27, 25 May 2025)
- ML20117M999 + (22:14:34, 25 May 2025)
- 05000368/LER-1995-001, Provides Comments on Preliminary Accident Sequence Analysis Re LER 95-001-00 + (22:15:28, 25 May 2025)
- B130180, Surveillance Specimen Program Evaluation for River Bend Station + (22:18:21, 25 May 2025)
- ML20117G758 + (22:20:58, 25 May 2025)
- 05000302/LER-1996-012, :on 960411,declared Old Battery Chargers Outside Facility Design Basis & Inoperable.Caused by Failure of Mfg to Translate Util Requirements Into Mfg Test Program. Four Old Battery Chargers Replaced + (22:22:08, 25 May 2025)
- ML20117F397 + (22:22:36, 25 May 2025)
- ML20117F369 + (22:22:39, 25 May 2025)
- ML20117F029 + (22:23:04, 25 May 2025)
- 05000336/LER-1994-027-01, :on 940903,channel B Linear Range Ni Drawer Opened & Technicians Found Connector J6 Disconnected from Jack.Caused by Personnel Error.Reconnected HV Connector J6 & Ensured Proper Operation of Channel B + (22:23:25, 25 May 2025)
- ML20117D266 + (22:24:41, 25 May 2025)
- 05000352/LER-1985-045, :on 850401,License Condition 2.C.8.(b) Requiring SPDS Operability by 850401 Not Met.Caused by Incomplete Validation Process Pending 100% Power Level for Final Tests.Completion Schedule Proposed + (22:25:11, 25 May 2025)
- 05000315/LER-1985-010-01, :on 850112 & 0406,dose Equivalent I-131 of Reactor Coolant Exceeded Tech Spec Limit.Caused by Leaking Fuel Assemblies.Fuel Sipping Will Be Performed During 1985 Refueling Outage + (22:25:13, 25 May 2025)
- TAC:51908 + (22:25:19, 25 May 2025)
- ML20117C623 + (22:25:26, 25 May 2025)
- ML20117C507 + (22:25:35, 25 May 2025)
- 05000275/LER-1985-011, :on 850217,manual Reactor Trip Initiated in Response to Automatic Shutdown of Main Feedwater Pumps 1-1 & 1-2 from Excessive Thrust Bearing Wear Indication.Thrust Bearing Wear Detection Sys Reset + (22:25:36, 25 May 2025)
- ML20117C494 + (22:25:38, 25 May 2025)
- 05000528/LER-1985-022, :on 850402,during Performance of Retesting Per Contractor Work Order (Cwo) 81614,inadvertent Start of Diesel Generator B Occurred.Caused by Energizing of 4EX1 Relay Due to Sneak Circuit.Cwo Amended + (22:25:40, 25 May 2025)
- 05000395/LER-1985-008, :on 850404,reactor Manually Tripped Due to Loss of Various Secondary Plant Indications.Trip Resulted in Unmonitored Release from Main Steam Sys Relief Valves.Caused by Failure of Primary & Secondary Fuses + (22:25:42, 25 May 2025)
- ML20117C470 + (22:25:43, 25 May 2025)
- ML20117C217 + (22:25:57, 25 May 2025)
- ML20117C204 + (22:25:59, 25 May 2025)
- ML20117C191 + (22:26:00, 25 May 2025)
- ML20117C177 + (22:26:03, 25 May 2025)
- ML20117C139 + (22:26:05, 25 May 2025)
- ML20117B320 + (22:26:34, 25 May 2025)
- 05000354/LER-1995-033-09, Forwards LER 95-033-09.Suppl Documents of Surveillance Implementation Deficiencies + (22:27:08, 25 May 2025)
- 05000341/LER-1996-010, :on 960719,ESF Actuation & HPCI System Suction Flow Path Transfer Occurred.Caused by Radio Frequency Interference.Posting of CST Instrument Panel and CST Area Completed & Work Request to Repair Phone Initiated + (22:27:24, 25 May 2025)
- ML20116P340 + (22:27:35, 25 May 2025)
- ML20116P312 + (22:27:40, 25 May 2025)
- ML20116P246 + (22:27:46, 25 May 2025)
- ML20116P206 + (22:27:50, 25 May 2025)
- ML20116P164 + (22:28:01, 25 May 2025)
- ML20116P145 + (22:28:05, 25 May 2025)
- ML20116M497 + (22:30:48, 25 May 2025)
- TAC:M95848 + (22:31:30, 25 May 2025)