Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000280/1991006 + (17:05:52, 25 May 2025)
- ML20128Q580 + (17:05:56, 25 May 2025)
- 05000311/LER-1985-006-01, :on 850423,reactor Trip Initiated When Turbine Lube Oil Cooler Placed in Svc.Caused by Lack of Procedural Guidance to Operators.Main Turbine Lubrication Oil Sys Operating Procedure Revised + (17:06:00, 25 May 2025)
- ML20128Q556 + (17:06:03, 25 May 2025)
- ML20128Q552 + (17:06:05, 25 May 2025)
- ML20128Q539 + (17:06:09, 25 May 2025)
- ML20128Q518 + (17:06:15, 25 May 2025)
- 05000352/LER-1985-046, :on 850423,w/unit in Cold Shutdown W/All Control Rods In,Reactor Full Scram Signal Occurred.Caused by Failure to Properly Remove Reactor Level Instrument from Svc.Use of Test Matrix Suggested + (17:06:19, 25 May 2025)
- ML20128Q504 + (17:06:20, 25 May 2025)
- ML20128Q486 + (17:06:25, 25 May 2025)
- ML20128Q478 + (17:06:29, 25 May 2025)
- 05000331/LER-1985-021, :on 850614,discovered That Spent Fuel Pool 5 Inches Below Tech Spec Level of 36 Ft.Caused by Small leak-through of Cask Pool Drain Valve.Maint Action Requests Initiated to Repair Valves + (17:09:32, 25 May 2025)
- ML20128Q396 + (17:09:39, 25 May 2025)
- ML20128Q371 + (17:09:47, 25 May 2025)
- ML20128Q359 + (17:09:53, 25 May 2025)
- ML20128Q302 + (17:10:07, 25 May 2025)
- ML20128Q294 + (17:10:10, 25 May 2025)
- 05000333/LER-1985-018, :on 850624,reactor Scram Occurred Due to Recirculation Flow Transient.Caused by Faulty Input Diode in Demodulator Board.Amplifier & Demodulator Board Replaced + (17:10:15, 25 May 2025)
- IR 05000219/1992025 + (17:15:02, 25 May 2025)
- IR 05000315/1990023 + (17:15:29, 25 May 2025)
- TAC:59930 + (17:16:25, 25 May 2025)
- IR 05000255/1993002 + (17:28:06, 25 May 2025)
- IR 05000498/1985005 + (17:28:51, 25 May 2025)
- TAC:M85109 + (17:30:19, 25 May 2025)
- TXX-9309, Responds to NRC Re Violations Noted in Insp Repts 50-445/92-50 & 50-446/92-50.Corrective Actions:Mgt Issued an Instructional Directive Stressing Need to Comply W/ Procedural Guidance Re Behavioral Observation Training + (17:31:01, 25 May 2025)
- NUREG-0422, Requests Comments on Review of Encl marked-up Tech Spec Concerns Resulting from Differing Prof Opinion.Some Concerns Should Be Resolved on plant-specific Basis.Proposed Amend Requests & Reply Needed within 90 Days + (17:31:24, 25 May 2025)
- IR 05000416/2005002 + (17:35:01, 25 May 2025)
- 05000445/LER-1993-001, :on 930118,trip Blocks Were Not in Place for Switch Manipulation & Reactor Trip Occurred While Restoring Ssps to Normal Lineup.Caused by Personnel Error.Event Reviewed & Training & Procedure Revised + (17:35:09, 25 May 2025)
- 05000219/LER-1981-065-01, /01T-1:on 811209,isolation Condenser Valve V-14-30 Failed to Properly Operate.Caused by Excessive Stress on Valve Backseat.Standing Order 33 Issued to Preclude Recurrence + (17:36:30, 25 May 2025)
- IR 05000250/1985008 + (17:37:02, 25 May 2025)
- IR 05000331/1996005 + (17:37:49, 25 May 2025)
- IR 05000498/1993001 + (17:38:30, 25 May 2025)
- ML20128L743 + (17:40:24, 25 May 2025)
- TXX-9306, Responds to NRC Re Violations Noted in Insp Repts 50-445/92-51 & 50-446/92-51 on 921025-1205.C/As:future Technical Bulletin Will Be Processed & Tracked Through Vendor Equipment Technical Info Program + (17:40:45, 25 May 2025)
- ML20128L478 + (17:41:34, 25 May 2025)
- ML20128K985 + (17:43:48, 25 May 2025)
- ML20128K964 + (17:43:55, 25 May 2025)
- IR 05000400/1985021 + (17:44:14, 25 May 2025)
- IR 05000456/1992025 + (17:47:57, 25 May 2025)
- ML20128K060 + (17:48:56, 25 May 2025)
- TAC:M84220 + (17:49:11, 25 May 2025)
- PMNS20200271, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:49:53, 25 May 2025)
- PMNS20200238, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:49:56, 25 May 2025)
- PMNS20200268, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:49:58, 25 May 2025)
- PMNS20200266, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:00, 25 May 2025)
- PMNS20200237, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:02, 25 May 2025)
- PMNS20200265, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:04, 25 May 2025)
- PMNS20200264, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:05, 25 May 2025)
- PMNS20200278, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:07, 25 May 2025)
- PMNS20200277, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:09, 25 May 2025)
- PMNS20200275, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:11, 25 May 2025)