IR 05000331/1996005

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-331/96-05
ML20128M245
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 10/10/1996
From: Lanksbury R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
References
NUDOCS 9610160034
Download: ML20128M245 (1)


Text

October 10, 1996

SUBJECT:

NOTICE OF VIOLATION (NRC INSPECTION REPORT N0. 50-331/96005 (DRP))

.

Dear Mr. Liu:

This will acknowledge receipt of your letter signed by Mr. John Franz, Vice President, Nuclear, dated September 27, 1996, in response to our letter dated August 30, 1996, transmitting a Notice of Violation associated with Inspection Report No. 50-331/96005 (DRP). We have reviewed your corrective actions and have no further questions at this time. These corrective actions will be examined during future inspections.

Sincerely, Original signed by R. D. Lanksbury Roger D. Lanksbury, Chief Reactor Projects Branch 2 Docket No. 50-331 cc:

G. Van Middlesworth, Plant Manager K. E. Peveler, Manager, Licensing and Emergency Planning Chairperson, Iowa Utilities Board Distribution:

Docket File PUBLIC IE-01 DRP Project Mgr., NRR SRI DAEC OC/LFDCB A. B. Beach

,

B. L. Burgess W. L. Axelson

To receive a copy of ttus document, indicate in the box "C" = Copy w/o attach /enel "E" = Copy w/ attach /enci "N" = No copy 0FFICE DRP lc DRP lV l

l h

NAME Tongue / sng g LanksburfR Of-k k

DATE 10/7/96 10/ 96 0FFICIAL RECORD COPY

'

9610160034 961010

}

PDR ADOCK 05000331

PDR j