Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000245/LER-1996-062, :on 961203,failure Vulnerability of SBGTS Was Identified.Performed Engineering Calculations to Quantify Consequences of Failure of 1-AC-10 During Fuel Handling Accident Coincident W/Venting of Primary Containment + (15:02:43, 25 May 2025)
- IR 05000501/2006015 + (15:03:15, 25 May 2025)
- ML20133B804 + (15:03:50, 25 May 2025)
- ML20133B744 + (15:04:13, 25 May 2025)
- TAC:43516 + (15:04:17, 25 May 2025)
- ML20133B666 + (15:04:53, 25 May 2025)
- 05000245/LER-1996-046-02, Forwards LER 96-046-02.Util Commits to Modify Procedure for Performing Local Leak Rate Test on Vacuum Breaker to Include Testing of Shaft Packing & Stuffing Box + (15:05:20, 25 May 2025)
- ML20133B443 + (15:06:12, 25 May 2025)
- 05000245/LER-1996-060, :on 960408,EDG Air Start Check Valve Internals Were Removed W/O Proper Documentation.Caused by Failure to Document Design Mod.Internals Have Been Reinstalled in Check Valves & Sys Has Been Restored to Original Configuration + (15:08:32, 25 May 2025)
- IR 05000250/1985021 + (15:09:17, 25 May 2025)
- 05000245/LER-1996-061, :on 961121,containment Isolation Function in Design Basis Accident Concurrent W/Loss of One Train of Dc Sys Failed.Caused by Inappropriate Exclusion in Past of Operation Conditions.Requirements Documented + (15:09:26, 25 May 2025)
- 05000354/LER-1995-033-14, Forwards LER 95-033-14.Design Change Package Will Be Completed Which Will Revise RBM Bypass Setpoint Calculation + (15:10:56, 25 May 2025)
- IR 05000272/1996014 + (15:12:20, 25 May 2025)
- ML20133A252 + (15:13:19, 25 May 2025)
- ML20132H066 + (15:16:17, 25 May 2025)
- ML20132G965 + (15:16:54, 25 May 2025)
- ML20132G888 + (15:17:24, 25 May 2025)
- ML20132G865 + (15:17:37, 25 May 2025)
- 05000483/LER-1985-025-01, Forwards LER 85-025-01 Re Intermediate Range High Flux Reactor Trip Caused by Blown Fuse in ex-core Neutron Monitoring Channel.Expected Submission Date of Supplemental Rept Amended Due to Continuing Investigation + (15:17:39, 25 May 2025)
- IR 05000237/1996201 + (15:17:55, 25 May 2025)
- 05000245/LER-1995-008, :on 950411,potential Inoperability Was Determined Re Feedwater Coolant Injection Sys Upon Failure of S2 DC Power.Caused by Error That Occurred During Original Plant Design.Physical Plant Mods Have Been Completed + (15:19:12, 25 May 2025)
- ML20132G174 + (15:21:32, 25 May 2025)
- 05000423/LER-1996-028, :on 960916,potential Overcooling of Charging Pump Lube Oil Sys Occurred Due to Failure of air-operated Temperature Control Valves.Temporary Mod to Limit Failure Position of Three Way Cce Temp Control Valve,Installed + (15:21:40, 25 May 2025)
- 05000423/LER-1996-007, :on 960403,containment Recirculation Spray, Quench Spray & Safety Injection Sys Were Outside Design Basis Due to Design Errors.Design Reviews of Rss,Qss,Si & Other Sys Will Be Performed + (15:22:11, 25 May 2025)
- TAC:56946 + (15:23:56, 25 May 2025)
- DD-96-19, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision DD-96-19 Expired.Decision Became Final Agency Action on 961213. W/Certificate of Svc.Served on 961218 + (15:24:12, 25 May 2025)
- TAC:M84788 + (15:24:28, 25 May 2025)
- ML20132F648 + (15:24:51, 25 May 2025)
- ML20132F592 + (15:25:09, 25 May 2025)
- ML20132F580 + (15:25:16, 25 May 2025)
- 05000334/LER-1996-004, :on 961126,determined Incorrect Testing of safety-related Logic Circuits.Caused by Relays Not Being Considered Part of Instrument Channel.Will Revise Maint & Operations Procedures to Include Relay Testing + (15:25:24, 25 May 2025)
- ML20132F439 + (15:26:05, 25 May 2025)
- ML20132F381 + (15:26:24, 25 May 2025)
- IR 05000219/2003001 + (15:26:43, 25 May 2025)
- ML20132F314 + (15:26:46, 25 May 2025)
- IR 05000250/1985017 + (15:30:33, 25 May 2025)
- ML20132E306 + (15:32:10, 25 May 2025)
- IR 05000259/1984040 + (15:36:43, 25 May 2025)
- IR 05000250/1985020 + (15:36:55, 25 May 2025)
- IR 05000232/2027001 + (15:37:05, 25 May 2025)
- ML20132D524 + (15:38:43, 25 May 2025)
- IR 05000233/1978001 + (15:39:08, 25 May 2025)
- NUREG/CR-4077, Recommends Board & Industry Notification of Westinghouse Owners Group Ack of Possible Failure of Secondary O-ring Seal Matl Used in Reactor Coolant Pump Seal Assemblies. NUREG/CR-4077 Re Aecl Seal Test Program Encl + (15:40:57, 25 May 2025)
- TAC:13278 + (15:41:08, 25 May 2025)
- 05000245/LER-1996-020-01, :on 960322,CST Unusable Vol Not Accounted for in Plant Procedures.Caused by Personnel Error.Design Calculations Will Be Revised to Correctly Identify Usable Vol of Csr + (15:41:38, 25 May 2025)
- TAC:55581 + (15:42:30, 25 May 2025)
- ML20132C797 + (15:42:32, 25 May 2025)
- 05000245/LER-1996-051, :on 960913,seismic Qualification Deficiencies Found in SR Piping.Caused by Original Plant Design Deficiency.Reviewed All SR Piping Sys to Identify Addl Design Deficiencies + (15:42:52, 25 May 2025)
- IR 05000225/2003005 + (15:43:25, 25 May 2025)
- 05000245/LER-1996-031, :on 960425,incorrect Fuses Caused Automatic Depressurization Sys to Be Inoperable.Cause Has Not Been Determined.All DC Circuits within Fuse Control Program Will Have Fuses W/Properly Certified DC Rating + (15:43:31, 25 May 2025)
- 05000245/LER-1996-059, :on 961115,reactor Pressure Vessel High Level Trip Sys Single Failure Vulnerability Identified.Caused by Failure to Identify & Properly Evaluate All Single Failure & Separation Issues.Rfp Will Be Reevaluated + (15:43:41, 25 May 2025)