Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137C139 + (07:19:51, 25 May 2025)
- 05000341/LER-1997-002, :on 970216,HPCI Sys Pump Discharge Valve Failed to Open.Caused by Failure of Pinion Gear Setscrew.Maint Procedure Controlling Work on Valve Mos Revised,Motor Shaft for Valve E4150-F006,spot Drilled & New Setscrew Installed + (07:20:08, 25 May 2025)
- ML20137C062 + (07:20:13, 25 May 2025)
- TAC:M86339 + (07:21:39, 25 May 2025)
- TAC:59166 + (07:22:49, 25 May 2025)
- ML20137B248 + (07:25:10, 25 May 2025)
- ML20137A750 + (07:27:36, 25 May 2025)
- IR 05000275/1985023 + (07:29:14, 25 May 2025)
- TAC:M97997 + (07:29:31, 25 May 2025)
- ML20137A490 + (07:30:11, 25 May 2025)
- ML20137A279 + (07:30:57, 25 May 2025)
- ML20137A249 + (07:31:02, 25 May 2025)
- ML20137A122 + (07:31:30, 25 May 2025)
- 05000245/LER-1996-020-02, Forwards LER 96-020-02,documenting Event Occurred at Unit 1 on 960322.Supplemental Rept Provides Update to Vol Calculations.Commitment B15674-3 Updated + (07:32:18, 25 May 2025)
- IR 05000387/1997001 + (07:33:09, 25 May 2025)
- TAC:56868 + (07:33:30, 25 May 2025)
- IR 05000250/1985040 + (07:33:57, 25 May 2025)
- ML20136J230 + (07:34:04, 25 May 2025)
- TAC:56205 + (07:34:07, 25 May 2025)
- ML20136H936 + (07:35:57, 25 May 2025)
- ML20136H918 + (07:36:03, 25 May 2025)
- 05000285/LER-1996-005, :on 960615,tornado Venting Floor Panels Encumbered by Various Attachments.Caused by Inadequate Initial Construction & Lack of Detailed Design Info for Auxiliary Building.Encumbrances Removed + (07:39:00, 25 May 2025)
- NUREG/CR-2239, Forwards Slides/Handout Used at 821110 Presentation of NUREG/CR-2239 Re Sandia Siting or Consequences Study. Transcript of Meeting in PDR Did Not Include Slides + (07:39:23, 25 May 2025)
- 05000341/LER-1997-001, :on 970206,error in Mass Flow Conversion Algorithm in Heat Methodology for Calculating Core Thermal Power Discovered.Caused by Deficiency in Calculation Software.Calculation Will Be Revised + (07:40:12, 25 May 2025)
- ML20136G987 + (07:41:12, 25 May 2025)
- 05000311/LER-1981-066-03, /03X-1:on 810720,controllers 2607A & 2610B Failed Due to Low Amperage Readings in Tapes & Two Independent Channels of Heat Trace Inoperable.Caused by Defective Splice.Surveillance Procedures Revised + (07:42:28, 25 May 2025)
- ML20136G591 + (07:45:43, 25 May 2025)
- ML20136G463 + (07:46:53, 25 May 2025)
- L-96-012, Rev 1 to Unit 1 RCS & SG Isotopic Concentrations,Pre- Incident Spike Concentrations & Iodine Spike Appearance Rates Corresponding to 0.35 & 0.5 Uci/Gm RCS Specific Activity + (07:47:38, 25 May 2025)
- ML20136G308 + (07:47:44, 25 May 2025)
- L-95-008, Rev 2 to SA of Common CR Eab,Lpz Doses from MSLB Outside of CNMT at Unit 1 W/Increased Primary-to-Secondary Leakage + (07:47:54, 25 May 2025)
- L-96-021, Rev 0 to RG 1.145 Short-Term Accident X/Q Values for Eab & LPZ Units 1 & 2 Based on 1986-1995 Observations + (07:47:59, 25 May 2025)
- ML20136G075 + (07:49:04, 25 May 2025)
- 05000354/LER-1997-004, :on 970207,B Div Primary Containment Isolation Sys Isolation Occurred.Caused by Personnel Error During Troubleshooting.Failed Optical Isolator Replaced & Channel Calibr Satisfactorily Completed on 970208 + (07:49:08, 25 May 2025)
- TAC:M96100 + (07:49:13, 25 May 2025)
- 05000245/LER-1996-037-02, Forwards Supplemental LER 96-037-02 Which Documents an Event That Occurred at Mnps,Unit 1 on 960327,per 10CFR50.73(a)(2)(ii) + (07:50:06, 25 May 2025)
- IR 05000010/1985001 + (07:51:13, 25 May 2025)
- ML20136F558 + (07:52:03, 25 May 2025)
- ML20136F481 + (07:52:33, 25 May 2025)
- 05000423/LER-1997-018, :on 970208,determined Plant Operated in Conditions Prohibited by 3 Different Ts.Caused by Interpreting TS for Intent Rather than Compliance W/Spec.Ts &/Or Bases Will Be Revised + (07:52:37, 25 May 2025)
- 05000423/LER-1997-016, :on 970206,piping Supports for Portions of RHR Sys in Condition Inconsistent W/Design Installation Details.Caused by Improper Installation of Spacer During Initial Const Activities.Restored Piping Supports + (07:52:47, 25 May 2025)
- ML20136F406 + (07:54:09, 25 May 2025)
- IR 05000335/1996002 + (07:56:05, 25 May 2025)
- IR 05000410/1985031 + (07:57:51, 25 May 2025)
- IR 05000335/1995015 + (07:59:46, 25 May 2025)
- ML20136E548 + (07:59:50, 25 May 2025)
- IR 05000250/1997002 + (07:59:56, 25 May 2025)
- IR 05000335/1996011 + (08:00:33, 25 May 2025)
- TAC:55328 + (08:00:45, 25 May 2025)
- NUREG-0591, Discusses Review of EPICOR-II Operating & Emergency Procedures.All But Three Procedures Approved.Engineering Design of Facility for Contaminated Filter & Resins Not Complete + (08:10:35, 25 May 2025)
- ML20136C928 + (08:10:50, 25 May 2025)