Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000265/LER-1980-019-03, /03L-0:on 800829,recirculation Pump Motor Generator a Field Breaker Opened.Caused by Failure of Control Power Transformer for Recirculation Motor Generator A.Transformer Replaced + (19:22:53, 25 December 2024)
- 05000265/LER-1980-019, Forwards LER 80-019/03L-0 + (19:22:56, 25 December 2024)
- ML19338E433 + (19:23:01, 25 December 2024)
- ML19338E431 + (19:23:02, 25 December 2024)
- ML19338E430 + (19:23:05, 25 December 2024)
- ML19338E429 + (19:23:07, 25 December 2024)
- ML19338E428 + (19:23:08, 25 December 2024)
- ML19338E427 + (19:23:17, 25 December 2024)
- ML19338E426 + (19:23:19, 25 December 2024)
- ML19338E425 + (19:23:24, 25 December 2024)
- ML19338E424 + (19:23:28, 25 December 2024)
- ML19338E422 + (19:23:30, 25 December 2024)
- ML19338E421 + (19:23:33, 25 December 2024)
- ML19338E420 + (19:23:34, 25 December 2024)
- ML19338E419 + (19:23:35, 25 December 2024)
- ML19338E418 + (19:23:37, 25 December 2024)
- ML19338E417 + (19:23:38, 25 December 2024)
- ML19338E416 + (19:23:42, 25 December 2024)
- ML19338E415 + (19:23:47, 25 December 2024)
- ML19338E414 + (19:23:52, 25 December 2024)
- 05000010/LER-1977-042-03, /03L-0:on 771031,scram Discharge Level Switch LS 264 Failed to Operate on Intial Quarterly Surveillance Dis 300-1 Test,But Did Operate on Subsequent Tests.Cause Not Determined.Safety Sys a Tripped & LS 264 Retested + (19:23:58, 25 December 2024)
- 05000010/LER-1977-042, Forwards LER 77-042/03L-0 + (19:24:02, 25 December 2024)
- 05000010/LER-1977-040-03, /03L-0:on 771017,Channel 1 (RIC-281) Found to Trip at 132%.Caused by Instrument Drift.Trip Setpoint Readjusted to 115%.High Neutron Flux Monitor Testing Will Continue Monthly Per Dis 700-4,verifying Operability + (19:24:05, 25 December 2024)
- 05000010/LER-1977-040, Forwards LER 77-040/03L-0 + (19:24:08, 25 December 2024)
- 05000010/LER-1977-041-03, /03L-0:on 771023,water Leaked to C Holdup Tank & Ground During Normal U-1 Radwaste Operation.Caused by Scratched Valve V3 & V45 Seats & Worn Manhead Gasket.Valve Seats Lapped,Manhead Gasket Replaced & Hatch Tightened + (19:24:11, 25 December 2024)
- 05000010/LER-1977-041, Forwards LER 77-041/03L-0 + (19:24:14, 25 December 2024)
- ML19338E404 + (19:24:16, 25 December 2024)
- ML19338E403 + (19:24:17, 25 December 2024)
- ML19338E402 + (19:24:19, 25 December 2024)
- ML19338E401 + (19:24:21, 25 December 2024)
- IR 05000010/1976002 + (19:24:35, 25 December 2024)
- ML19338E398 + (19:24:38, 25 December 2024)
- IR 05000010/1973003 + (19:24:48, 25 December 2024)
- ML19338E396 + (19:24:50, 25 December 2024)
- ML19338E395 + (19:24:52, 25 December 2024)
- ML19338E393 + (19:24:54, 25 December 2024)
- ML19338E391 + (19:24:56, 25 December 2024)
- ML19338E390 + (19:24:57, 25 December 2024)
- IR 05000010/1978022 + (19:25:02, 25 December 2024)
- ML19338E388 + (19:25:05, 25 December 2024)
- ML19338E386 + (19:25:06, 25 December 2024)
- ML19338E385 + (19:25:08, 25 December 2024)
- IR 05000010/1976006 + (19:25:21, 25 December 2024)
- ML19338E382 + (19:25:23, 25 December 2024)
- IR 05000010/1976007 + (19:25:30, 25 December 2024)
- ML19338E378 + (19:25:32, 25 December 2024)
- IR 05000010/1975010 + (19:25:36, 25 December 2024)
- ML19338E375 + (19:25:40, 25 December 2024)
- IR 05000010/1973004 + (19:25:46, 25 December 2024)
- ML19338E373 + (19:25:49, 25 December 2024)
- ML19338E371 + (19:25:52, 25 December 2024)