Forwards Insp Repts 50-010/73-04,50-237/73-04,50-249/73-05, 50-295/73-36 & 50-304/73-18 on 730925-27 & Notice of Violation
ML19338E371
Person / Time
Site: Dresden, Zion  
Issue date: 11/21/1973
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Behnke W
COMMONWEALTH EDISON CO.
Shared Package
ML19338E372 List:
References
NUDOCS 8009250556
Download: ML19338E371 (2)


See also: IR 05000010/1973004

Text

-

_

.

.

.

-

  • ~

joor c

,

.

'

UNITED STATES

I

(.'

y,

ATOMIC ENERGY COMMISSION

,

,

[,

s *

OIRECTORATE OF REGULATORY OPERATIONS

o%res o' "h

i

' , ,

REGION ell

799 ROOSEVELT ROAO

- l

mg

GLEN ELLYN, ILLINOIS 6o137

(312) 050-2860

,

NOV 21 1973

Commonwealth Edison Company

Docket No. 50-10

ATTN:

W. B. Behnka

Docket No. 50-237

Executive Vice President

Docket No. 50-249

Poet Office Box 767

Docket No. 50-295

Chicago, T1Hnais 60690

Docket No. 50-304

Gentlemen:

This refers to the inspection conducted by Messrs. Pcoeroy and Tripp,

of our Regulatory Oparations Headquarters office, at the Comunonwealth

Edison Company offices in Chicago, Illinois, and to discussions of our

findings with Mr. W. J. Showski and others of your staff at the con-

clusion of the inspection. The inspection was an examination of

activities related to the procurement of fuel for several of your

nuclear power plants, including a comparison of these activities with

the Comunission's Quality Assurance Criteria. The inspection consisted

of selective examinations of procedures and representative records,

-

,

interviews with personnel, and observations by the inspectors.

Based on the results of the inspection, it appears that certain of

your activities are in violation of AEC requirements. These activities

are identified ia the Enclosure to this letter and are discussed in the

enclosed inspection report.

This letter is a notice of violation and is sent to you pursuant to

the provisions of Section 2.201 of the AEC's " Rules of Practice,"

Part 2, Title 10. Code of Federal Regulations. Section 2.201 requires

you to submit to this office, within twenty (20) c'.ays of the date

of this letter, a written statement or explanation in reply, including:

(1) corrective steps which have been taken by you and the results

achieved; (2) corrective steps which will be taken to avoid further

violations; and (3) the date when full compliance will be achieved.

In addition to the need for corrective action regarding these specific

l

deficiencies, we are concerned about the implementation of your

i

quality assurance program which permitted these deficiencies to occur.

Consequently, in your reply, you should describe, in particular, those

actions taken or planned to inprove the effectiveness of your quality

assurance programm for procurement of nuclear fael.

l

soo9 m o CS'6

. . -

- -

--

.

_

-,

.-.

.

.

.

.

.

.

.

_

.

. ,

2 1 1973

I

.

commonwealth Edison company

-2-

i

In accordance with Section 2.790 of the AEC's " Rules of Practice,"

Part 2. ""o 10, Code of Federcl Regulation, a copy of thia letter,

the e

' spection report, and your response to this letter is to

be

, AEC's Public Document room. If this report contains

.a that you (or your suppliers) believe to be proprietary,

s

ary t. hat you make a written application to this office, within

a

2t.

. the date of this letter, to withhold such information from public

discA.~are. Any such application must include a full statement identifying

the basis for which it is ew=ad that the information is proprietary, and

,

should be prepared so the proprietary information identified in the application

is contained in a separate part of the document, eince the application,

excluding this separate part, will also be placed in the Public Document

Room. Unless we receive an application to withhold information or are

otherwise contacted within the specified time period, the written

material identified in this paragraph, will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be

'

glad to discuss them with you.

i

Sincerely yours,

James C. Kappler

Regional Director

Enclosures:

1.

Notice of Violat?.ons

2.

RO Inspection Report

bec: R0 Chief, FS&EB

,

RO:HQ (4)

Licensing (4)

DR Central Files

RO Files

PDR

Local PDR

NSIC

DTIE

OGC, Beth, P-506A

R. Renfrow, GC (2)

!

_ - . -