Forwards IE Insp Rept 50-010/75-10 on 750513,14 & 20. Noncompliance Noted
ML19338E375
Person / Time
Site: Dresden Constellation icon.png
Issue date: 06/20/1975
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19338E376 List:
References
NUDOCS 8009250559
Download: ML19338E375 (2)


See also: IR 05000010/1975010

Text

-

-________

_ _ _ - _ _ _ _ _ _ _

_ _ _ _ _ _

.

________ _ . _ _ _ . _ _ . .

_ _ _ _ . _ _ . _

.__

_ . _ .

.

7

  • 0.

.vjuk &

e,

f,

' . . . , ' . ,

UNITED STATES

,

NUCLEAR REGULATORY COMMISSION

-

,

REGION HI

799 ROOSEVELT RO AD

GLEN ELLYN. ILLINOIS 60137

I'

JUN 2 0 1975

a==anwealth Edison Company

Docket No. 50-10

ATTN

Mr. Byron Lee, Jr.

Vice President

P. O. Box 767

Chicago. T114nais 60690

Gentlement

Thia refers to the inspection conducted by Masars. Fisher and Knop

of this office on May 13, 14, and 20, 1975 of activities at Dresden

,

Unit 1 authorized by NRC Operating License No. DPR-2 and to the

discussion of our findings with Mr. Stephenson and members of his

staff at the conclusion of the inspection.

A copy of our report of this inspection is enclosed and identifies the

areas arm =4nad during the inspection. Within these areas, the inspection

consisted of a selective rmaination of procedures and representative

records, intsrviews with plant personnel, and observations by the

! _

,

inspector.

'

'

.

.

During this inspection, it was found that certain of your activities

appear to be in nonctumpliance with NRC requirements. The item and

reference to the pertinent requirements are listed under Enforcement

!.

Action in the Summary of Findings Section of the enclosed inspection

report.

,

i

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office within

cwenty days of your receipt of this notice, a written statement or

explanation in reply, inc1=Hng:

(1) corrective steps which have been

taken by you, szd the ruults achieved; (2) corrective steps which will

be rahan to avoid further teams af noncompliance; and (3) the date when

.'

full compliante will ba achieved.

f

Based upon discussion with'yrnr ==nagement personnel at the con-

clusion, we understand that you plan to:

gotuTio,

f

O

$

a

x

  • %.,/

800923o g

.

.

._

_ _.

..

.

,, / -

t

ss

.

"

JUN 2 0 '1975

-

Commonwealth Edison Company

-2-

,

(

l.

Determine whether a safety analysis was performed to evaluate

i

the possible effects of routinely overflowing the resin and

j

sludge tanks.

g

2.

Make core borings near the resin and sludge vat _lts to determine

whether vault leakage has occurred.

We will examine these matters during a future inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practics." Part

2, Title 10, Code of Federal Regulations, a copy of this notice, the

enclosed inspection report, and your response to this notice will be

placed in the NRC's Public Document Room.

If this report contains any

information that you or your contractors believe to be proprietary, it

is necessary that you make a written application to this office, wittiin

twenty days of your receipt of this notice, to withhold such information

from public disclosure. Any such application must include a full statement

of the reasons for which it is clained that the information is proprietary,

and should be prepared so the proprietary information identified in the

~

application is contained in a separate part of the document. Unless we

receive an application to withhold information or are otherwise contacted

within the specified time period, the written material identified in

this paragraph will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

Slad to discuss them with you.

Sincerely yours,

'

Gaston Fiorelli, Chief

Reactor Operations Branch

Enclosure:

IE Inspection Report

No. 050-010/75-10