Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195J311 + (12:51:06, 24 May 2025)
- ML20195J073 + (12:52:18, 24 May 2025)
- ML20195J049 + (12:52:26, 24 May 2025)
- ML20195J046 + (12:52:27, 24 May 2025)
- ML20195J042 + (12:52:29, 24 May 2025)
- ML20195J038 + (12:52:30, 24 May 2025)
- ML20195J027 + (12:52:33, 24 May 2025)
- ML20195J021 + (12:52:35, 24 May 2025)
- ML20195J010 + (12:52:40, 24 May 2025)
- ML20195J004 + (12:52:42, 24 May 2025)
- 05000461/LER-1999-007, :on 990513,main Steam Isolation Valve Leakage Control Sys Was Noted Outside Design Basis.Caused by Design Error.Revised Setpoint for Each MSIV-LCS Flow Measurement Channel to Meet Design Basis of Plant + (12:52:54, 24 May 2025)
- ML20195H939 + (12:53:14, 24 May 2025)
- 05000461/LER-1999-008, :on 990514,reactor Vessel Level Transient Was Noted.Caused by Failure of Motor Driven Reactor FW Pump Regulating Valve.Initiated Manual Scram & Fixed Procedure Discrepancies + (12:53:18, 24 May 2025)
- ML20195H922 + (12:53:20, 24 May 2025)
- ML20195H911 + (12:53:23, 24 May 2025)
- ML20195H907 + (12:53:26, 24 May 2025)
- 05000336/LER-1999-008, :on 990511,AFW Regulating Valve Failed Monthly Inservice Operability Test,Which Strokes Valve Through Full Range of Motion.Caused by Mechanical Failure of AFW Regulating Valve non-safety Positioner.Procedures Revised + (12:53:31, 24 May 2025)
- ML20195H808 + (12:53:52, 24 May 2025)
- ML20195H748 + (12:54:15, 24 May 2025)
- ML20195H734 + (12:54:21, 24 May 2025)
- 05000334/LER-1997-008-01, Informs of Change in Scheduled Completion Date for LER 97-008-01 Commitment from 981130 to 990830 + (12:54:25, 24 May 2025)
- ML20195H691 + (12:55:03, 24 May 2025)
- ML20195H603 + (12:55:25, 24 May 2025)
- IR 05000528/1987044 + (12:56:03, 24 May 2025)
- ML20195H236 + (12:57:20, 24 May 2025)
- ML20195H159 + (12:57:47, 24 May 2025)
- ML20195G994 + (12:59:26, 24 May 2025)
- DD-87-21, Directors Decision DD-87-21 Denying Addl Relief Requested by Petitioners That Commission Order Immediate Implementation of Relief Noted in 860506 Petition Re Suspension of Further Licensing of Nuclear Plants in Us + (12:59:48, 24 May 2025)
- ML20195G840 + (13:00:13, 24 May 2025)
- IR 05000397/1987006 + (13:00:28, 24 May 2025)
- ML20195G747 + (13:00:41, 24 May 2025)
- 05000271/LER-1998-019-01, Forwards LER 98-019-01,as Defined by NUREG-1022,rev 1, Section 2.9.Rept Is Being Reissued Due to Typo on Cover Ltr Submitted with Rept on 981105.Cover Ltr Provided Incorrect LER Number.Encl Rept Date Also Changed to 981112 + (13:01:01, 24 May 2025)
- ML20195G676 + (13:01:07, 24 May 2025)
- DD-98-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-98-10 Has Expired.Decision Became Final on 981116.With Certificate of Svc.Served on 981120 + (13:01:18, 24 May 2025)
- TAC:65587 + (13:01:27, 24 May 2025)
- 05000423/LER-1998-041, :on 981016,failed to Enter as for Inoperable SG Water Level Channel IAW Tss.Root Cause of Event Is Under Investigation.Failed Circuit Card Was Replaced on 981016 & P-14 Function Was Restored to Operable Status + (13:01:27, 24 May 2025)
- 05000482/LER-1999-005, :on 990512,ESFA Was Noted Due to Loss of Number 7 Transformer.Caused by Intrusion of Raccoon in Switchyard. No Equipment Damage Was Found & Breaker Was Reset + (13:01:46, 24 May 2025)
- 05000289/LER-1999-004, :on 990510,EFW Pump Was Inoperable Longer than Allowed by TSs Due to Lack of Lubrication.Caused by Loose Set Screw Resulting in Bearing Failure.Pump Was Repaired & Returned to Service on 990512 + (13:02:47, 24 May 2025)
- ML20195G373 + (13:02:59, 24 May 2025)
- ML20195G289 + (13:03:24, 24 May 2025)
- L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with + (13:04:03, 24 May 2025)
- ML20195G108 + (13:04:17, 24 May 2025)
- 05000423/LER-1998-040, :on 981017,entry Into TS 3.0.3 Occurred Due to Both Quench Spray Sys Pumps Being Placed in pull-to-lock Position.Caused by Human Error.Operator Involved in Event Removed from Shift & Disciplinary Action Taken + (13:04:22, 24 May 2025)
- ML20195F930 + (13:05:08, 24 May 2025)
- ML20195F910 + (13:05:14, 24 May 2025)
- ML20195F901 + (13:05:16, 24 May 2025)
- L-98-272, Comment on Draft Reg Guide DG-4005, Preparation of Suppl Environ Repts for Applications to Renew Nuclear Power Plant Operating Licenses + (13:05:28, 24 May 2025)
- 05000458/LER-1999-010, :on 990428,inadvertent Breach of Fuel Bldg Integrity Occurred.Caused by Failure to self-check. Administrative Control Was Instituted to Place Control of Door SH-113-01 Under on-shift Operations SS + (13:05:58, 24 May 2025)
- 05000458/LER-1999-011, :on 990510,initiation of Div I DG & ECCS Injection Into Rv Occurred.Caused by Failed,Unsealed Capacitor on Rosemount Trip Unit.Replaced Failed Trip Unit & Evaluated Methods to Reduce Consequences of Same Failures + (13:06:05, 24 May 2025)
- ML20195F354 + (13:07:48, 24 May 2025)
- ML20195F307 + (13:08:04, 24 May 2025)