Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196A193 + (12:34:13, 24 May 2025)
- ML20196A180 + (12:34:18, 24 May 2025)
- ML20196A171 + (12:34:21, 24 May 2025)
- ML20196A169 + (12:34:22, 24 May 2025)
- ML20196A161 + (12:34:25, 24 May 2025)
- 05000333/LER-1999-004-01, :on 990403,two Electrical Leads in 09-30 Panel in Relay Room Were Found Unlanded.Caused by Inattention to Detail & Inadequate Process to Ensure Complete Protective Tag.Performed Extent of Condition Walkdowns.With + (12:34:33, 24 May 2025)
- 05000425/LER-1998-009, :on 981021,trouble Alarm Was Received for Train B ESFAS Sequencer Due to Inoperability.Caused by Inability to Interpret Initial Conditions.Sequencer Was down-powered to Replace Field Buffer Card.With + (12:34:49, 24 May 2025)
- ML20196A093 + (12:34:53, 24 May 2025)
- 05000456/LER-1999-001-06, :on 990516,both Trains of LPSI Were Declared Inoperable.Caused by Leakage of SI Accumulator Water.Design Changes Were Implemented to Install Local High Point Vents in Common Portion of Rh Sys Piping to 1B & 1C RCS + (12:35:05, 24 May 2025)
- ML20196A073 + (12:35:10, 24 May 2025)
- ML20196A061 + (12:35:17, 24 May 2025)
- ML20195K444 + (12:35:41, 24 May 2025)
- 05000362/LER-1999-004, :on 990515,reactor Manually Tripped Due to Feedwater Control Valve Opening.Caused by Faulty Valve Positioner.Faulty Positioner Was Replaced + (12:35:48, 24 May 2025)
- ML20195K255 + (12:36:43, 24 May 2025)
- 05000282/LER-1999-006, :on 990519,discovered That Manual SI Actuation Switch Had Not Been Tested on Staggered Basis During Integrated SI Test.Caused by Inadequate Procedure.Util Has Quarantined Sps 1083 & 2083 Until Revs Are Completed + (12:36:51, 24 May 2025)
- 05000413/LER-1998-016, :on 981020,determined That Plant Was in Condition Outside Design Basis Due to Discovery of Missing Interlock.Caused by Failure to Coordinate Licensing Commitment.Licensee Will Install Interlock,Per UFSAR + (12:37:27, 24 May 2025)
- 05000266/LER-1999-005, :on 990514,steam Leak from Low Pressure FW Heater Was Noted.Caused by Rupture & Walls Thinnings Which Accelerated Corrosion.Repaired FW Heaters + (12:42:03, 24 May 2025)
- ML20195J724 + (12:42:14, 24 May 2025)
- ML20195J663 + (12:43:10, 24 May 2025)
- ML20195J656 + (12:43:13, 24 May 2025)
- 05000361/LER-1998-023, :on 981020,missed Surveillance of Fire Detector Circuit Supervision Inside Containment Occurred.Caused by Integration of Repetitive Maint Orders.Licensee Controlled Specifications Revised + (12:50:22, 24 May 2025)
- 05000461/LER-1998-035, :on 981016,failure to Comply with TS Action Requirements to Immediately Restore AC & DC Electrical Power Sources,Was Discovered.Caused by Inadequate Communications. LCO Tracking Database for Daily Rept Will Be Revised + (12:50:29, 24 May 2025)
- ML20195J387 + (12:50:36, 24 May 2025)
- ML20195J311 + (12:51:06, 24 May 2025)
- ML20195J073 + (12:52:18, 24 May 2025)
- ML20195J049 + (12:52:26, 24 May 2025)
- ML20195J046 + (12:52:27, 24 May 2025)
- ML20195J042 + (12:52:29, 24 May 2025)
- ML20195J038 + (12:52:30, 24 May 2025)
- ML20195J027 + (12:52:33, 24 May 2025)
- ML20195J021 + (12:52:35, 24 May 2025)
- ML20195J010 + (12:52:40, 24 May 2025)
- ML20195J004 + (12:52:42, 24 May 2025)
- 05000461/LER-1999-007, :on 990513,main Steam Isolation Valve Leakage Control Sys Was Noted Outside Design Basis.Caused by Design Error.Revised Setpoint for Each MSIV-LCS Flow Measurement Channel to Meet Design Basis of Plant + (12:52:54, 24 May 2025)
- ML20195H939 + (12:53:14, 24 May 2025)
- 05000461/LER-1999-008, :on 990514,reactor Vessel Level Transient Was Noted.Caused by Failure of Motor Driven Reactor FW Pump Regulating Valve.Initiated Manual Scram & Fixed Procedure Discrepancies + (12:53:18, 24 May 2025)
- ML20195H922 + (12:53:20, 24 May 2025)
- ML20195H911 + (12:53:23, 24 May 2025)
- ML20195H907 + (12:53:26, 24 May 2025)
- 05000336/LER-1999-008, :on 990511,AFW Regulating Valve Failed Monthly Inservice Operability Test,Which Strokes Valve Through Full Range of Motion.Caused by Mechanical Failure of AFW Regulating Valve non-safety Positioner.Procedures Revised + (12:53:31, 24 May 2025)
- ML20195H808 + (12:53:52, 24 May 2025)
- ML20195H748 + (12:54:15, 24 May 2025)
- ML20195H734 + (12:54:21, 24 May 2025)
- 05000334/LER-1997-008-01, Informs of Change in Scheduled Completion Date for LER 97-008-01 Commitment from 981130 to 990830 + (12:54:25, 24 May 2025)
- ML20195H691 + (12:55:03, 24 May 2025)
- ML20195H603 + (12:55:25, 24 May 2025)
- IR 05000528/1987044 + (12:56:03, 24 May 2025)
- ML20195H236 + (12:57:20, 24 May 2025)
- ML20195H159 + (12:57:47, 24 May 2025)
- ML20195G994 + (12:59:26, 24 May 2025)
- DD-87-21, Directors Decision DD-87-21 Denying Addl Relief Requested by Petitioners That Commission Order Immediate Implementation of Relief Noted in 860506 Petition Re Suspension of Further Licensing of Nuclear Plants in Us + (12:59:48, 24 May 2025)