Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000295/LER-1997-025-02, :on 971124,visual Insp of Reactor Cavity Area Was Not Performed Per Ts.Caused by Inadequate Review of TSS 15.6.21 Procedure Performed in 1991.Revised TSS 15.6.21 Procedure + (10:50:52, 24 May 2025)
- ML20197G419 + (10:51:05, 24 May 2025)
- NUREG-0801, Forwards Comments on Program Plan for Detailed Control Room Design Review (Dcrdr).Program Plan Addresses All Required Elements of DCRDR.In-progress Audit Not Planned + (10:51:09, 24 May 2025)
- 05000445/LER-1997-004-02, Forwards LER 97-004-02 Re Issues Discovered During Review of GL 96-01 Associated W/Ts Surveillances + (10:51:37, 24 May 2025)
- 05000295/LER-1997-021-01, Forwards LER 97-021-01,per 10CFR50.73(a)(2)(i)(B). Commitments Associated W/Correspondence,Encl + (10:52:13, 24 May 2025)
- IR 05000344/1986006 + (10:52:30, 24 May 2025)
- IR 05000192/1988001 + (10:52:35, 24 May 2025)
- IR 05000443/1996003 + (10:52:49, 24 May 2025)
- ML20197F960 + (10:52:52, 24 May 2025)
- CY-97-155, Requests Exemption from Requirements of 10CFR70.24(a), Criticality Accident Requirements. Request Is That Applicable Parts of Previously Granted Exemption to 10CFR70.24 Be Reapproved.Justification for Request,Encl + (10:53:07, 24 May 2025)
- IR 05000298/1988010 + (10:53:23, 24 May 2025)
- ML20197F748 + (10:53:38, 24 May 2025)
- 05000352/LER-1997-012, :on 971120,unplanned Closure of Primary Containment Isolation Valve Occurred.Caused by an Inaccurate Drawing & an Inadequate Partial Surveillance Test. Engineering Change Request Was Initiated + (10:53:54, 24 May 2025)
- ML20197F684 + (10:53:55, 24 May 2025)
- NUREG-0812, Forwards Response to Comments on Des.Only Lochstet Comments Require Reply + (10:53:59, 24 May 2025)
- IR 05000293/1988011 + (10:54:34, 24 May 2025)
- ML20197F431 + (10:54:55, 24 May 2025)
- A06968, Responds to NRC 871215 Request for Addl Info on SEP Topic III-6, Seismic Reevaluation & Clarifies Questions Raised During 880406 meeting.W/13 Oversize Drawings + (10:55:00, 24 May 2025)
- IR 05000482/1988009 + (10:55:05, 24 May 2025)
- ML20197F371 + (10:55:11, 24 May 2025)
- IR 05000498/1988007 + (10:55:26, 24 May 2025)
- ML20197F286 + (10:57:03, 24 May 2025)
- TXX-8849, Forwards Endorsement 24 to Nelia Policy NF-274 + (10:57:55, 24 May 2025)
- ML20197F054 + (10:59:24, 24 May 2025)
- 05000382/LER-1997-031, :on 971120,HR Analyzer Valves Position Did Not Meet TS Requirements.Caused by Inadequate Design.Verified Valves Were in Closed Position,Declared Remote Position Indication for Valves Inoperable & Entered TS 3.3.3.6 + (10:59:39, 24 May 2025)
- ML20197E790 + (11:00:49, 24 May 2025)
- IR 05000255/1986001 + (11:00:50, 24 May 2025)
- 05000344/LER-1985-013-01, Forwards Rev 0 to 01-0300-1471, Preliminary Thermal Expansion Evaluation of Reactor Coolant Loop for Trojan Nuclear Plant, as Clarification of LER 85-013-01 in Response to 860430 Telcon + (11:01:07, 24 May 2025)
- ML20197E685 + (11:01:17, 24 May 2025)
- IR 05000395/1997003 + (11:01:37, 24 May 2025)
- NUREG-0427, Discusses Reassessment of Reported Manpower & External Contractural Costs for Radiological Safety CP Review by Comparison w/man-yrs Recorded in NUREG-0427.Expenditures Considered Reasonable + (11:01:43, 24 May 2025)
- ML20197E589 + (11:01:50, 24 May 2025)
- IR 05000188/1988001 + (11:02:03, 24 May 2025)
- IR 05000382/1988005 + (11:02:13, 24 May 2025)
- IR 05000261/1997010 + (11:02:17, 24 May 2025)
- IR 05000298/1988006 + (11:02:42, 24 May 2025)
- ML20197E338 + (11:02:49, 24 May 2025)
- ML20197D928 + (11:04:19, 24 May 2025)
- ML20197D920 + (11:04:21, 24 May 2025)
- IR 05000259/1988005 + (11:05:29, 24 May 2025)
- 05000282/LER-1997-016, :on 971119,condition That Did Not Fully Comply W/Prescriptive Requirements of 10CFR50,App R Section Iii.O, Was Noted.Caused by Inadequate Review.Revised Alarm Response Procedures C47012 & C47512 to Inspect Area Around RCP + (11:05:37, 24 May 2025)
- TAC:07551 + (11:05:49, 24 May 2025)
- ML20197D396 + (11:06:11, 24 May 2025)
- 05000255/LER-1986-017, :on 860410,excess Primary Coolant Leakage Detected.Plant Placed in Hot Shutdown.Caused by Failure of Valves RV-2006,PRV-1067,-1068 & -1072 to Seat Fully.Valves Repaired & Reseated + (11:06:21, 24 May 2025)
- 05000461/LER-1997-028, :on 971126,identified Inoperability of All in-service 33 480-volt K-line safety-related Circuit Breakers.Caused by Failure of ABB to Supply Properly Qualified Components Per 10CFR21.Will Replace Components + (11:06:30, 24 May 2025)
- TAC:51655 + (11:06:43, 24 May 2025)
- ML20197D211 + (11:07:01, 24 May 2025)
- TAC:64136 + (11:07:13, 24 May 2025)
- TAC:M99222 + (11:07:50, 24 May 2025)
- TAC:M99213 + (11:07:52, 24 May 2025)
- ML20197C965 + (11:08:15, 24 May 2025)