Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-98-193, Calculation EA-C-PAL-98-1939-01, Evaluation of Corrosion on Studs Between Casing & Cover of Pump P-50A,Ref C-PAL-98- 1939 + (09:45:12, 24 May 2025)
- 05000282/LER-1997-017, :on 971206,concluded That Condition of Cabling to 1LT-433 & 1LT-426 Did Not Satisfy Separation Criteria of 10CFR50,App R,Section III.G.2.Caused by Incorrect Design Documentation.Noncombustible Radiant Energy Installed + (09:46:35, 24 May 2025)
- 05000334/LER-1997-039, :on 971208,gas Accumulated in Charging/High Safety Injection Pump Piping.Caused by HHSI Pump Minimum Flow Recirculation Line Orifices.Flow Orifices Are Being Replaced at Unit 1 & 2,to Reduce Generation of Gas Bubbles + (09:47:15, 24 May 2025)
- TAC:598228 + (09:47:47, 24 May 2025)
- ML20198G652 + (09:47:48, 24 May 2025)
- ML20198G641 + (09:47:53, 24 May 2025)
- ML20198G481 + (09:48:35, 24 May 2025)
- ML20198G464 + (09:48:39, 24 May 2025)
- TAC:M96261 + (09:50:04, 24 May 2025)
- IR 05000348/1996009 + (09:50:13, 24 May 2025)
- TAC:53908 + (09:50:16, 24 May 2025)
- IR 05000461/1996009 + (09:50:23, 24 May 2025)
- IR 05000313/1997003 + (09:50:26, 24 May 2025)
- ML20198G123 + (09:50:37, 24 May 2025)
- IR 05000443/1997002 + (09:50:38, 24 May 2025)
- IR 05000354/1997002 + (09:50:40, 24 May 2025)
- ML20198G006 + (09:51:07, 24 May 2025)
- TAC:M94834 + (09:51:16, 24 May 2025)
- IR 05000128/1997001 + (09:51:31, 24 May 2025)
- IR 05000266/1996303 + (09:52:02, 24 May 2025)
- ML20198F804 + (09:52:08, 24 May 2025)
- ML20198F741 + (09:52:22, 24 May 2025)
- IR 05000302/1997006 + (09:53:36, 24 May 2025)
- IR 05000285/1997006 + (09:54:11, 24 May 2025)
- 05000324/LER-1996-003-02, Forwards Supplemental LER 96-003-02 Re Operation of Unit in Excess of Max Power Level Specified in Operating License. List of Regulatory Commitments,Encl + (09:54:17, 24 May 2025)
- IR 05000254/1997009 + (09:54:20, 24 May 2025)
- ML20198F263 + (09:54:46, 24 May 2025)
- ML20198F231 + (09:54:59, 24 May 2025)
- 05000266/LER-1997-034, :on 970707,discovered Unplanned Loss of Voltage on Train B Safeguards Buses.Caused by Inadequate Design & Design Review for Installation of New Train B Edgs.Incorrect Wiring Reworked + (09:55:23, 24 May 2025)
- ML20198F013 + (09:56:11, 24 May 2025)
- ML20198F008 + (09:56:12, 24 May 2025)
- ML20198E899 + (09:56:42, 24 May 2025)
- L-97-001, Forwards Response to NRC Re Violations Noted in Insp Repts 50-334/97-01,50-412/97-01,50-334/97-02 & 50-412/97-02 & Enforcement Conference.Corrective Actions: Quality Svcs Performed Assessment of TS SRs for Units 1 & 2 + (09:56:47, 24 May 2025)
- ML20198E859 + (09:57:01, 24 May 2025)
- 05000302/LER-1997-043, :on 971208,deficiency in Electrical Design Criteria Resulted in Control Complex Chiller Motor Trip Set Point Set Below Full Load Ampere Setting,Was Discovered. Caused by Lack of Effective Cap.Established Improved CAP + (09:57:14, 24 May 2025)
- A05331, Responds to 851025 Request for Addl Info Re Use & Training of Shift Advisors.Training Program for Shift Advisors Encl + (09:57:35, 24 May 2025)
- 05000266/LER-1985-002-01, Forwards LER 85-002-01 Re Details of Fuel Damage Found on Fuel Assembly H14,which Spent Last Cycle in Core Position D12.Rept Suppls Original Rept + (09:58:05, 24 May 2025)
- IR 05000341/1985043 + (09:58:12, 24 May 2025)
- ML20198E570 + (09:58:39, 24 May 2025)
- 05000302/LER-1997-044, :on 971209,breaker Trip Setpoint Resulted in Deenergizing of Sre.Caused by Inadequate Setpoint Criteria. Revised Electrical Design Criteria for CR-3 + (09:59:07, 24 May 2025)
- ML20198E477 + (09:59:13, 24 May 2025)
- NPL-97-0767, Forwards non-proprietary & Proprietary Versions of Temporary Change to Rev 9 of EPIP 8.4.1, Post-Accident Sampling & Analysis of Potentially High Activity Reactor Coolant. Proprietary Version Withheld + (09:59:55, 24 May 2025)
- NUREG-1450, Forwards Description of Staff Actions Planned in Response to Investigation of 910529 Incident at GE Fuel & Component Facility + (10:00:05, 24 May 2025)
- NUREG-1462, Notification of 921209 Meeting w/ABB-C-E in Rockville,Md to Discuss Status of Closure of Open Items in Draft SER for Sys 80+ (NUREG-1462).Meeting Agenda Encl + (10:00:25, 24 May 2025)
- 05000302/LER-1998-013, :on 981118,SRs Were Missed Due to Procedure Inadequacy.Caused by Personnel Error.Affected Surveillance Procedures Were Placed on Administrative Hold + (10:00:55, 24 May 2025)
- IR 05000424/1985037 + (10:01:03, 24 May 2025)
- 05000282/LER-1998-018, :on 981117,discovered That Surveillance Testing of Boric Acid Storage Tank Level Instrumentation Places Plant in Condition Where Single Failure Could Cause Inability to Inject Concentrated Boric Acid + (10:01:09, 24 May 2025)
- ML20198E027 + (10:01:40, 24 May 2025)
- NUREG-0519, Safety Evaluation of Final in-plant Safety/Relief Valve Test Evaluation Rept Per SER (NUREG-0519).Design Adequate to Accommodate Loads Associated W/Activation of One or More Safety Relief Valves + (10:02:33, 24 May 2025)
- L-98-231, Informs That Review of UFSAR for BVPS Units 1 & 2 Will Be Completed by 000330 for risk-significant Items & 010330 for All Other Issues,Per Enforcement Guidance Memo EGM 98-007 + (10:02:36, 24 May 2025)
- ML20198D819 + (10:02:39, 24 May 2025)