NUREG-1462, Notification of 921209 Meeting w/ABB-C-E in Rockville,Md to Discuss Status of Closure of Open Items in Draft SER for Sys 80+ (NUREG-1462).Meeting Agenda Encl

From kanterella
Jump to navigation Jump to search
Notification of 921209 Meeting w/ABB-C-E in Rockville,Md to Discuss Status of Closure of Open Items in Draft SER for Sys 80+ (NUREG-1462).Meeting Agenda Encl
ML20198E223
Person / Time
Site: 05200002
Issue date: 12/02/1992
From: Wambach T
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Russell W
NRC
References
RTR-NUREG-1462 NUDOCS 9212040300
Download: ML20198E223 (4)


Text

aquoy jo,, UNITED STATES a NUCLEAR REGULATORY COMMISSION-h r, WASHINGTON, D. C. 20555

%, . . . . . #' December 2, 1992 Docket No.52-002 MEMORANDUM FOR: T. Murley G. Lainn R. Zimmerman F. Miraglia J. Roe B. Boger W. Russell J. Zwolinski C. Thomas J. Partlow M. Virgilio q F. Congal 1 D. Crutchfield B. Grimes E. Butcher W. Travers J. 91chardson W. Bateman, EDO F. Gillespie B. D. Liaw

. A. Vietti-Cook S. Varga A. Thadani Operations Center J. Calvo G. Holahan C. Rossi THRU: Robert C. Pierson, Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of duclear Reactor Regulation FROM: Thomas V. Wambach, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation SUBJEC1.

DAILY HIGHLIGHT - FORTHCOMING HEETING WITH ABB-COMBUSTION ENGINEERING (ABB-CE) FOR SYSTEM 80+ MANAGEMENT OVERVIEW DATE AND TIME: . December 9, 1992 (1 p.m. - 5 p.m.)

LOCATION: U.S. Nuclear Regulatory Commission One White Flint North-11555 Rockville Pike Rockville, Maryland 20852 Room 12-B-11 PURPOSE: To discuss the status of closure of open items in the draft safety evaluation report. for ABB-CE System 80+ (NUREG-1462).

An agenda for the meeting is enclosed.

9 nm gm a, q=

. ac mu.

frnrm,: negny~~

4 040.062 N 8 messgr A- v

i December 2, 1992 PARTICIPANTS *: NRC MSdE M. Franovich R. Matzie T. Wambach J. Longo

T. Murley C. Brinkman W. Russell H. Windsor D. Crutchfield J. Rec B. Boger J. Robertson A. Thadani F. Carpentino R. Jones S. Ritterbusch R. Pierson G. Hedrick (DE&S)

R. Borchardt J. Burnette (DE&S) 4 T. Boyce S. Newberry J. Lyons F. Congel

' J. Lee (Original signed by)

Thomas V. Wambach, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

Enclosure:

Meeting Agenda cc w/ enclosure:

See next page

  • Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78. Members of the public who wish to attend should contact me at (301) 504-1121.

DISTRIBUTION:

Docket File PDST R/F LPlisco, 12G18- RPierson PDR JNWilson TVWambach RBorchardt TBoyce THiltz MXFranovich PShea EJordan, MNBB 3701 GGrant, ED0 ACRS (10) OPA NRR Mailroom, 12G18 P0' Dell, PTSB JMoore, 15818 MMalloy Receptionist, 0WFN RJones, 8E23 RPerch, 8H7 FNewberry, 8H7 JLycns, 801 FCongel, 10E2 JLee, 10E2 0FC: LA:PDST:ADAR lPMgI:AQAR SC: ppt:ADAR NAME: PShea gg TYam$ac3:tz RBod[hardt DATE: 12/g]h2 12/A/92 12/2/92 0FFICIAL DOCUMENT COPY: CM1209.TVW

l l l- .

j,- ,

J I' ABB-Combustion Engineering ~ Inc. , Docket No.52-002 i

cc: Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing

Combustion Engineering, Inc.
- 1000 Prsspect Hill Road

[ Windsor, Connecticut 06095-0500

, Mr. L. B. Brinkman, Manager

< Washington Nuclear Operations Combustion Engintaring, Inc.

i 12300 Twinbrook Parkway, Suite 330 i Rockville, Maryland 20852 Mr. Stan-Ritterbusch i Nuclear Systems Licensing i Combustion Engineering, Inc.

i 1000 Prospect Hill Road j' Post Office Box 500 l

Windsor, Connecticut 06095-0500

(

i Mr. Daniel F. Giessing i l'. S. Department of Energy NE-42

Washington, D.C. 20585 3

Mr. Steve Goldberg

. Budget Examiner l 725 17th Street, N.W.

Washington, D.C. 20503 i

! Mr. Raymond Ng

- 1776 Eye Street, N.W.

Suite 300 l- Washington, D.C. 20006 i

l-4 i

i i

i s

w g r- + m ---1,-+-,., . , , ,,,e-*r--vm--u

c. .

[.

NRC/ABB-CE MANAGEMENT MEETING i

! POTENTIAL AGENDA DECEMBER 9,1992 2

e SCHEDULE AND RESOURCES FOR COMPLETION OF i

SYSTEM 80+ REVIEW i

l e ITAAC SAMPLE COMPLETED ITAAC AND SUPPORTING TIER 2 l INFORMATION _

l (NOTE: Completed ITAAC for EFWS and CCWS will be used _to

_ demonstrate incorporation of lessons learned and comments received i from industry and NRC. NRC will have.these in hand one week prior i to meeting.)

INDUSTRY REVIEW OF SYSTEM 80+ ITAAC 4

i SCHEDULE FOR SUBMITTAL OF SYSTEM 80+ ITAAC i

e SAFETY ANALYSIS ISSUES APPEALS (IF NOT PREVIOUSLY i

RESOLVED) n -

GDC 17 APPLICABILITY AND INTERPRETATION

!= -

LOOP DELAY TIME i

DNB CONVOLUTION-e I&C DIVERSITY DISCUSSION i- e RCP SEAL COOLING i-e -

SOURCE TERM REANALYSIS USING EPRI REVISED SOURCE l- TERM DISCUSSION

e -HFE REVIEW STATUS (NOVEMBER 19,1992, MEETING AGREEMENT)

+

b ENCLOSURE

. , = 4-.- ,. y -. , s ,- r,. ---

- - . , , ,, y ,--w-.--- - -

m.,-..qr+ue..yw . _ ,w,_ v . r r 3- y