Discusses Insp Repts 50-245/97-81,50-336/97-81 & 50-423/97-81 on 970825-29 & Predecisional Enforcement Conference on 971222.Based on Info Provided During Insp & Conference,Nrc Determined Violations Occurred.W/Viewgraphs
ML20198F008
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 12/30/1997
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kenyon B
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20198F012 List:
References
50-245-97-81, 50-336-97-81, 50-423-97-81, EA-97-481, NUDOCS 9801090279
Download: ML20198F008 (3)


See also: IR 05000245/1997081

Text

- _ - _ . , . - _ .

t

'

C

!

December 30, 1997  :

EA 97 481

Mr. B. D. Kenyon, President

and Chief Nuclear Officer

-

Northeast Nuclear Energy Company

PO Box 128

Waterford, CT 06385

SUBJECT: NOTICE OF VIOLATION FOR NRC (MERGENCY PREPAREDNESS PROGRAM

INSPECTION REPORT NOS. 50 243,336,423/97 81

Dear Mr. Kenyon:

This refers to the inspection conducted on August 25429,1997 at the Millstone Nuclear

Power Station. The inspection report containing an explanation of the apparent violations

was issued November 24,1997, and the predecisional enforcement conference was held

December 22,1997, at the USNRC Region 1 office, King of Prussia, Pennsylvania. The

enforcement conference was attended by Mr. M. Bowling and other members of your

staff. A list of the attendees is enclosed (Enclosure 1).

Based on the information developed during the inspection and the information that you

provided during the conference, the NRC has determined that violations of NRC

requirements occurred. These vlotations are cited in the enclosed Notice of Violation

(Notice) and the circumstances surrounding them are described in detail in the subject

inspection report.

These violations have been categorized in accordance with the " General Statement of

Policy and Procedure for NRC Enforcement Actions" (Enforcement Policy), NUREG 1600 at

Severity LevelIV. Although taken separately and in the aggregate these violations do not

raise above the level of concern expressed by a severity level IV, we feel that left

unattended they would degrade to a level that could cause further enforcement action. We

are also concerned that a number of them were identified by the NRC.

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. In accordance with 10 CFR 2.790 of the

NRC's " Rules of Practice," a copy of this letter, its enclosure ((s), and your response will be

placed in the NRC Public Document Room (PDR).

I

>

,t

'

09on07 W,F,IINHRif

9901090279 971230

PDR

O

ADOCK 05000243

PDR

'

  • h

.- . .

7

a --

}

!

!

.  ;

Mr. B. D. Kenyon 2

The enclosed material (Enclosures 2 and 3) was presented by your staff at the conference

and provided additional details regarding the violations and your subsequent corrective l

actions.  ;

Sincerely,  !

!

ORIGINAL SIGNED BY:

.t

.

James T. Wiggins, Director

Division Reactor Safety

Docket No. 50 245,50 336,50 423 ,

License No. .DPR 21, DPR 65, NPF-49

!

Enclosures:- As stated j'

1. List of Attendees

2. - Pre Decisional Enforcement Conference

3. Programs Which Protect Health and Safety

cc w/ encl:

P. A. Loftus, Director Regulatory Affairs

M. H. Brothers, Vice President Operations i

J. McElwein, Unit 1 Recovery Officer -

M. Bowling, Jr., Unit 2 Recovery Officer

D. M. Goebel, Vice President, Nuclear Oversight ,

G. D. Hicks, Unit Director Millstone Unit 3

J. A. Price, Unit Director Millstone Unit 2 -

M. J. Ross, Manager Nuclear Training Assessment Group ,

D. Amerine, Vice President for Engineering and Support Services  ;

P. D. Hinnenkamp, Director, Unit 1 Operations  !

F. C. Rothen, Vice President, Work Services ,

J. Stankiewicz, Trainira Recovety Manager

R. Johannes, Director Nuclear Training

,

S. J. Sherman, Audits and Evaluation '

L. M. Cuoco, Esqu!re

J. R. Egan, Esquire - .

V. Julian_o, Waterford Library

J.' Buckingham, Department of Public Utility Control

S. B. Comley, We The People

State of Connecticut SLO Designee.

_

- D. Katz, Citizens Awareness Network (CAN)

'

R.- Bassilakis,' CAN ?

J. M. Block, Attorney, CAN . _

S.' P. Luxton, Citizens Regulatory Commission (CRC) i

~ Representative T. Concannon  :

'

E. Woollacott, Co-Chairman, NEAC -

,

e-s vv .-,.e , , N5 e [ r 5 .-be ' w -rEi-e-,,,.wr, r----., ,.*,---.m.e $-. - -~[w- e- - E w: .m-.eww-,e

._ . -_ . __ . _ _ -

.

!

.  !

Mr.B. D. Kenyon 3

{

Distribution w/ encl:

Region I Docket Room (with rapy of concurrences)

'

Nuclear Safety Information Center (NSIC)

PUBLIC i

FILE CENTER, NRR (with Orialnal concurrences)

NRC Resident inspector

FEMA, Region I ,

D. Holody, Region 1

OE (2)

D. Barss, NRR t

B. Jones, PIMB/ DISP

M. Kalamon, SPO, Rl

W. Lanning, Deputy Director of Inspections, S.0, RI

W. Travers, Director, SPO, NRR

C. Misket, DRS

DRS File

Distribution w/enci (VIA E MAIL):

J. Andersen, PM, SPO, NRR ,

M. Callahan, OCA

R. Correia, NRR

W. Dean, OEDO

S. Dembek, PM, SPO, NRR -

G. Imbro, Deputy Director of ICAVP Oversight,'SPO, NRR

D. Mcdonald, PM, SPO, NRR

P. McKee, Deputy Director of Licensing, SPO, NRR

S. Reynolds, Chief, SPO, NRR

D. Screnci, PAO

Inspection Program Branch (IPAS)

DOCDESK

!

,

r

DOCUMENT NAME: G:\EP&SB\ LUSHER \MLENFCNF.LTR

n , . . o, u. uom.ni. m.c. m wu c . copy eus .ti.cnm.nu.ncio.u,. r. copy .an .it. cam.ntioncio.u,. u-

No copy A 3  ;

OFFICE Rl/DRS lE Rl/DRS Mg 1Y Rl/SPO jR Rl/DRS Njn [

NAME JLusher MMod,es % WLanninb+ j JWiggins (WW

DATE- 12/30/97 12QG97 lb7d97 ,/ , 12&f97-l 12/ /97 _

~

OFFICIAL RECORD COPY