ML20198F231

From kanterella
Jump to navigation Jump to search
Forwards Change LL to SSES Physical Security Plan,Per 10CFR50.54(p).Change Provides Detailed Description of Security UPS Sys & Changes within Mgt Structure.Change Withheld
ML20198F231
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/07/1997
From: Byram R
PENNSYLVANIA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PLA-4652, NUDOCS 9708110227
Download: ML20198F231 (2)


Text

.

l$[ Pennsylvcnic Pow:;r & Light Company Two North Ninth Streele Allentown, PA 18101 1179

  • 610/774 5161 Robert G. Byram Senior Vicel' resident Generation and ChiefNuclear Officer 610/774.7502 Fan 610n74 5019 AVG 071997 i

U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Mail Station Pl 137 Washington, D. C. 20555 SUSQUEllANNA STEAM ELECTRIC STATION CIIANGE LL TO Tile PIIYSICAL SECURITY PLAN Docket Nos. 50-387/NPF-14 PLA-4652 FILES R412. A111 and 50-388/NPF.22 Attached for your review is Change LL to the bsquehanna Steam Electric Station Physical Security Plan. Pursuant to 10 CFR 50.54(p), PPAL had determined that the changes do not decrease the safeguards effectiveness of the plan and may, therefore, be made without prior Commission approval.

This change provides a more detailed description of the security UPS system and reflects changes within the management structure at PP&L.

Pursuant to 10 CFR 73.21, the attachments to this letter should be withheld from public inspection, Very tr,uly yours, R.

vram l

e nch ents l lllllll ]ll]ll{llll ll 3

copy: NRC Region 1 (2 copies)

Mr. K. Jenison, NRC Sr. Resident inspector w/o Mr. C. Poslusny, NRC Sr. Project Manager w/o

[

WilEN SEPARATED FROM ENCLOSURE,IIANDLE tills DOCUMENT AS DECONTROLLED 9708110227 970007 PDR ADOW 05000387-

AFFIDA VIT COMMONWEALTH OF PENNSYLVANIA )

SS COUNTY OF LEHIGH

)

L l

l 1, ROBERT G. BYRAM, being duly sworn according to law, state that I am Senior Vice President Generation and Chief Nuclear Officer of Pennsylvania Power & Light Company and that the facts set forth on the attached Change LL to the Susquehanna Steam Electric Station Physical Security Plan pursuant to 10CFR50.54(p) are true and correct to the best of my knowledge, information and belief.

(w-obert G. Byram Se lor Vice President

  • rati and Chief Nuclear Officer Sworn to and subscribed ofJQbefore me this %,1997.

day g

O /(0f 0]$[0h Mihru Piihtid NOTAMAL SEAL DIANE R Koch, Nosory Pubac Macaown, tem @ cour*y, PA W C=*oa W Mr 12, im

\\