Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000271/1997011 + (09:07:19, 24 May 2025)
- ML20198P512 + (09:07:27, 24 May 2025)
- NSD-NRC-96-4654, Forwards Rev 5 to GW-GL-021, AP600 Ssar. Revised Tables of Contents for Affected Chapters,Change Page Instructions,List of Effective Pages & Change Roadmap Outlining Changes Also Encl + (09:07:57, 24 May 2025)
- ML20198P377 + (09:08:02, 24 May 2025)
- IR 07100102/2012013 + (09:08:03, 24 May 2025)
- ML20198P365 + (09:08:05, 24 May 2025)
- ML20198P315 + (09:08:18, 24 May 2025)
- 05000302/LER-1997-032, :on 970406,discovered Inadequate Electrical Isolation on Safety Related Power Supply.Caused by Design Error.Isolation Device Will Be Installed or Solenoid Valve Will Be Replaced W/Sr Solenoid Prior to Mode 4 + (09:08:58, 24 May 2025)
- ML20198P225 + (09:08:59, 24 May 2025)
- ML20198P162 + (09:09:13, 24 May 2025)
- PNO-IV-97-065, on 971105,reported to Ofc of State Programs That SPEC Model 150 Radiographic Exposure Device Containing 102-Ci Ir-192 Sealed Source Fell from Back of Licensee Truck on State Highway Between Empire & Belle Chase,La + (09:09:21, 24 May 2025)
- L-98-224, Requests NRC Approval of Existing Wording QA Description Included in Bvps,Unit 2 Ufsar.Wording Would Allow for Review of Procurement Documents for Matl & Equipment by Personnel in Nuclear Procurement Dept.Revised UFSAR Page,Encl + (09:10:33, 24 May 2025)
- ML20198P067 + (09:10:37, 24 May 2025)
- ML20198P065 + (09:10:38, 24 May 2025)
- B11567, Forwards NPDES Monthly Discharge Monitoring Rept for Sept 1997.Addl Samples Taken at NPDES Locations & Analyzed W/ Approved Methods Included in Table 2 & 3 + (09:10:40, 24 May 2025)
- ML20198P023 + (09:10:58, 24 May 2025)
- 05000336/LER-1995-032-01, Forwards Suppl to LER 95-032-01,documenting Event That Occurred at Unit 2 on 950808.LER Suppls Repts Completions of Short & long-term Corrective Actions Associated W/Pipe Rupture in Secondary Sys within Turbine Bldg + (09:11:02, 24 May 2025)
- IR 05000454/1997008 + (09:11:06, 24 May 2025)
- ML20198N996 + (09:11:08, 24 May 2025)
- ML20198N988 + (09:11:10, 24 May 2025)
- ML20198N948 + (09:11:19, 24 May 2025)
- ML20198N931 + (09:11:23, 24 May 2025)
- IR 05000331/1998020 + (09:11:52, 24 May 2025)
- ML20198N817 + (09:12:03, 24 May 2025)
- 05000293/LER-1997-029, :on 971216,SDC Suction Valves Were Vulnerable to Damage from Potential Failure Mode Involving Hot Shorts. Caused by Failure to Recognize New Failure Mode Described in NRC in 92-18.Implemented Temporary Mod + (09:12:22, 24 May 2025)
- ML20198N696 + (09:12:34, 24 May 2025)
- IR 05000395/1997013 + (09:13:24, 24 May 2025)
- ML20198N656 + (09:13:33, 24 May 2025)
- ML20198N627 + (09:13:39, 24 May 2025)
- ML20198N621 + (09:13:41, 24 May 2025)
- ML20198N612 + (09:13:46, 24 May 2025)
- 05000302/LER-1997-046, :on 971220,circuits Required for Operation of EDG Exciters Were Not Protected from Effects of Postulated App R Fire in MCR or Csr.Caused by Engineering Oversight. Individuals Involved Have Been Briefed & Counseled on Event + (09:14:13, 24 May 2025)
- IR 05000196/1997001 + (09:14:15, 24 May 2025)
- B17603, Special Rept:On 981212, Start of B-EDG Was Attempted from CR Following Completion of Heat Exchanger Insps.Caused by Trapped Air Pocket within CW Loop.Performed OPs as Required in Order to re-vent Sys + (09:14:16, 24 May 2025)
- 05000293/LER-1997-028, :on 971217,intake Structure in Configuration Was Inconsistent W/Tornado Depressurization Analysis Assumptions.Caused by Inadequate Control of Tornado Barriers.Revised Station Tornado Procedure + (09:14:21, 24 May 2025)
- 05000361/LER-1997-017, :on 971216,STAs Were Questioned Re Respirator Qualifications & Requirements Re Corrective Lense Wearers. Cause Not Determined.Util Has Requalified & Certified All STAs for Respirator Use + (09:14:33, 24 May 2025)
- 05000295/LER-1994-005-03, :on 940403,Unit 1 Main Reactor Trip & Subsequent Start of 1A Afp Following Generator Fire & Isophase Bus Duct Fault,Occurred.Caused by Main Generator Phase C Bushing Failure.Internal Insp Was Performed + (09:14:46, 24 May 2025)
- ML20198N362 + (09:15:02, 24 May 2025)
- 05000482/LER-1997-016-01, Forwards LER 97-016-01,documenting Violation of Plant OL & TS Re Use of Fire Protection Sys Pumps for non-fire Protection Purposes + (09:15:03, 24 May 2025)
- ML20198N329 + (09:15:11, 24 May 2025)
- ML20198N303 + (09:15:20, 24 May 2025)
- ML20198N246 + (09:15:34, 24 May 2025)
- ML20198N196 + (09:15:45, 24 May 2025)
- IR 05000445/1997015 + (09:15:46, 24 May 2025)
- ML20198N177 + (09:15:50, 24 May 2025)
- ML20198N163 + (09:15:53, 24 May 2025)
- TAC:M79569 + (09:16:06, 24 May 2025)
- ML20198N115 + (09:16:07, 24 May 2025)
- ML20198N085 + (09:16:14, 24 May 2025)
- TAC:MA0229 + (09:17:01, 24 May 2025)
- 05000302/LER-1997-031-01, Forwards LER 97-031-01,discussing Results of Evaluation Performed for Cables Identified in LER 97-031-00 + (09:17:07, 24 May 2025)