Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198R624 + (08:58:33, 24 May 2025)
- 05000423/LER-1997-061, :on 971218,determined That TS 6.8.4 Leakage Reduction Program Does Not Address All Leakage Paths.Caused by Failure to Assign Ownership for Implementation of Section 6.0 Programs.Will Test Potential Leak Paths + (08:58:34, 24 May 2025)
- ML20198R617 + (08:58:36, 24 May 2025)
- ML20198R606 + (08:58:38, 24 May 2025)
- IR 05000482/1985042 + (08:58:44, 24 May 2025)
- IR 05000338/1986004 + (08:59:05, 24 May 2025)
- ML20198R438 + (08:59:16, 24 May 2025)
- IR 05000424/1986015 + (08:59:18, 24 May 2025)
- ML20198R362 + (08:59:38, 24 May 2025)
- 05000327/LER-1997-004-02, Forwards LER 97-004-02,identifying Two Addl Molded Case Circuit Breakers That Were Not in Appropriate Surveillance Instructions.Revs Annotated by Vertical Bar in Right Margin + (09:00:02, 24 May 2025)
- 05000302/LER-1997-034, :on 971008,nonconservative Assumption in Breaker Setpoint Calculations Could Have Prevented Starting of Motor Operated Equipment.Caused by Nonconservative Assumption MCCB Setpoint Calculations.Changes Implemented + (09:00:09, 24 May 2025)
- ML20198R242 + (09:00:10, 24 May 2025)
- ML20198Q919 + (09:01:37, 24 May 2025)
- ML20198Q909 + (09:01:40, 24 May 2025)
- ML20198Q901 + (09:01:42, 24 May 2025)
- ML20198Q834 + (09:02:03, 24 May 2025)
- 05000266/LER-1997-044, :on 971216,use of Dedicated Operators During IST of Containment Spray Sys Constituted Operation Prohibited by Ts.Caused by Improper Consideration for Use of Dedicated Operators.Revised Procedures + (09:02:25, 24 May 2025)
- ML20198Q703 + (09:02:35, 24 May 2025)
- 05000413/LER-1998-010-01, Forwards LER 98-010-01,re Pin Hole Leak in AFW Nozzle Tempering Line.Supplemental Rept Provides Results of Engineering Evaluation.Commitments Are in Planned C/A Section of LER + (09:02:39, 24 May 2025)
- TAC:M96177 + (09:02:49, 24 May 2025)
- ML20198Q599 + (09:02:58, 24 May 2025)
- ML20198Q471 + (09:03:27, 24 May 2025)
- L-96-026, Tech Evaluation Rept on Second 10 Year Inservice Insp Program Plan:Wolf Creek Nuclear Operating Corp + (09:04:00, 24 May 2025)
- ML20198Q295 + (09:04:11, 24 May 2025)
- ML20198Q144 + (09:04:48, 24 May 2025)
- ML20198P972 + (09:05:29, 24 May 2025)
- ML20198P927 + (09:05:38, 24 May 2025)
- L-97-055, Forwards Dqe & Dl Organization Chart as of 970915, Illustrating pre-merger Dqe Organization,As Requested in + (09:05:50, 24 May 2025)
- ML20198P824 + (09:06:05, 24 May 2025)
- ML20198P821 + (09:06:06, 24 May 2025)
- TAC:54150 + (09:06:07, 24 May 2025)
- 05000370/LER-1997-002-01, Forwards LER 97-002-01 Re Reactor Trip Which Occurred Due to RCP Motor Failure.Rev Submitted to Reflect Changes to Commitment W/Regard to Replacement of Unit 2B RCP Motor + (09:06:11, 24 May 2025)
- ML20198P779 + (09:06:16, 24 May 2025)
- TAC:48787 + (09:06:52, 24 May 2025)
- ML20198P568 + (09:07:08, 24 May 2025)
- IR 05000271/1997011 + (09:07:19, 24 May 2025)
- ML20198P512 + (09:07:27, 24 May 2025)
- NSD-NRC-96-4654, Forwards Rev 5 to GW-GL-021, AP600 Ssar. Revised Tables of Contents for Affected Chapters,Change Page Instructions,List of Effective Pages & Change Roadmap Outlining Changes Also Encl + (09:07:57, 24 May 2025)
- ML20198P377 + (09:08:02, 24 May 2025)
- IR 07100102/2012013 + (09:08:03, 24 May 2025)
- ML20198P365 + (09:08:05, 24 May 2025)
- ML20198P315 + (09:08:18, 24 May 2025)
- 05000302/LER-1997-032, :on 970406,discovered Inadequate Electrical Isolation on Safety Related Power Supply.Caused by Design Error.Isolation Device Will Be Installed or Solenoid Valve Will Be Replaced W/Sr Solenoid Prior to Mode 4 + (09:08:58, 24 May 2025)
- ML20198P225 + (09:08:59, 24 May 2025)
- ML20198P162 + (09:09:13, 24 May 2025)
- PNO-IV-97-065, on 971105,reported to Ofc of State Programs That SPEC Model 150 Radiographic Exposure Device Containing 102-Ci Ir-192 Sealed Source Fell from Back of Licensee Truck on State Highway Between Empire & Belle Chase,La + (09:09:21, 24 May 2025)
- L-98-224, Requests NRC Approval of Existing Wording QA Description Included in Bvps,Unit 2 Ufsar.Wording Would Allow for Review of Procurement Documents for Matl & Equipment by Personnel in Nuclear Procurement Dept.Revised UFSAR Page,Encl + (09:10:33, 24 May 2025)
- ML20198P067 + (09:10:37, 24 May 2025)
- ML20198P065 + (09:10:38, 24 May 2025)
- B11567, Forwards NPDES Monthly Discharge Monitoring Rept for Sept 1997.Addl Samples Taken at NPDES Locations & Analyzed W/ Approved Methods Included in Table 2 & 3 + (09:10:40, 24 May 2025)
- ML20198P023 + (09:10:58, 24 May 2025)