Other: ML17181A229, ML20056G180, ML20079R417, ML20094P419, ML20134G924, ML20135D395, ML20151W366, ML20196B705, ML20198Q703, ML20202H368, ML20205R563, ML20206F984, ML20211C466, ML20217E441, ML20217H367, TXX-9402, Responds to 931222 RAI by Informing NRC Last C/A Completing GL 92-08 Is Field Work Installing Thermo-Lag Upgrades, TXX-9500, Provides Addl Info Describing Activities That Util Has Performed to Verify Quality of Procured & Installed Thermo- Lag & to Ensure That Thermo-Lag at Plant Properly Qualified, TXX-9906, Forwards Final Fire Endurance Test Rept,Per Closure of Remaining Open Issues Re Thermo-Lag Fire Barriers as Described by Items 1 & 4 in NRC 960522 SER
|
MONTHYEARML20079R4171993-08-16016 August 1993 Trip Rept of 930718-22 Visit to Omega Point Lab,San Antonio, Tx Re Thermo-Lag Fire Barrier Test Program for Comanche Peak Steam Electric Station,Unit 1 Project stage: Other ML20056G1801993-08-17017 August 1993 Documents 930722 Telcon W/Util Re Thermo-Lag Mfg Specs.Info Did Not Change NRC Previous Conclusions Re Thermo-Lag Fire Barriers or Affect NRC Ongoing Review Activities Project stage: Other ML20059C2831993-12-22022 December 1993 Discusses RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, Per 10CFR50.54(f) for Plant.Notifies That Requested Schedule Must Be Submitted within 45 Days from Receipt of Ltr Project stage: RAI TXX-9402, Responds to 931222 RAI by Informing NRC Last C/A Completing GL 92-08 Is Field Work Installing Thermo-Lag Upgrades1994-01-28028 January 1994 Responds to 931222 RAI by Informing NRC Last C/A Completing GL 92-08 Is Field Work Installing Thermo-Lag Upgrades Project stage: Other TXX-9415, Forwards Response to Request for Addl Info Re Thermo-Lag Certification.Rev 2 to ER-ME-082, Engineering Rept Evaluation of Unit 1 & Unit 2 Thermo-Lag Configurations1994-06-16016 June 1994 Forwards Response to Request for Addl Info Re Thermo-Lag Certification.Rev 2 to ER-ME-082, Engineering Rept Evaluation of Unit 1 & Unit 2 Thermo-Lag Configurations Project stage: Request ML20072A8331994-08-0808 August 1994 Submits Response to Request for Addl Info Re thermo-lag Cable Functionally Issues.Rev 2 to Calculation Change Notice 071 Encl Project stage: Request TXX-9426, Forwards Response to Request for Addl Info Re Thermo-Lag Cable Functionality Issues1994-11-0909 November 1994 Forwards Response to Request for Addl Info Re Thermo-Lag Cable Functionality Issues Project stage: Request ML20077A7251994-11-18018 November 1994 Forwards Response to Request for Addl Info Re Ampacity Tests Project stage: Request TXX-9500, Provides Addl Info Describing Activities That Util Has Performed to Verify Quality of Procured & Installed Thermo- Lag & to Ensure That Thermo-Lag at Plant Properly Qualified1995-02-24024 February 1995 Provides Addl Info Describing Activities That Util Has Performed to Verify Quality of Procured & Installed Thermo- Lag & to Ensure That Thermo-Lag at Plant Properly Qualified Project stage: Other ML20086D9881995-07-0707 July 1995 Informs That Request for Extension to Respond to NRC 950517 RAI on Util 950224 Response to GL 92-08 Re Thermo-Lag Fire Barrier Matl Received & Installed at Facility Discussed W/ Tj Polich & Granted on 950707 Project stage: Request ML17181A2291995-07-28028 July 1995 Discusses from Commonwealth Edison Co & 950627 Affidavit from Transco Products,Inc & Requesting Documents Be Withheld from Public Disclosure Per 10CFR2.790.Documents Will Be Withheld as Requested Project stage: Other ML20087E2701995-08-0808 August 1995 Forwards Response to Request for Addl Info Re Followup to GL 92-08 for Thermo-Lag Fire Barrier Matl Received & Installed at Facility Project stage: Request ML20094P4191995-11-22022 November 1995 Forwards Nucon 06TU935/01, Pyrolysis Gas Chromatography Analysis of 10 Thermo-Lag Fire Barrier Samples Project stage: Other ML20134P8661996-11-22022 November 1996 Informs That 961024 Response to Open Items Re thermo-lag Cable Functionality Issues Does Not Address Staff Original Concerns.Advises of 961205 Meeting to Reach Final Technical Resolution on Cable Functionality Issues at Plant,Unit 1 Project stage: Meeting ML20134G9241997-02-0404 February 1997 Informs That Util Intends to Submit Addl Info to NRC on or About 970228 Re Response to SE Open Items on Unit 1 for Thermo-Lag Cable Functionality Issues Project stage: Other IR 05000445/19970021997-02-28028 February 1997 Insp Repts 50-445/97-02 & 50-446/97-02 on 970210-14.No Violations Noted.Major Areas Inspected:Liquid & Gaseous Radioactive Waste Effluent Mgt Program,Organization & Mgt Controls,Radioactive Effluent Monitoring for Plant Support Project stage: Request ML20135D3951997-02-28028 February 1997 Provides Response to SE Open Items on CPSES Unit 1 Re Thermo-Lag Cable Functionality Issues Project stage: Other ML20217E4411997-10-0101 October 1997 Discusses Licensee 970228 Revised Response to SE Open Items on Plant,Unit 1 Re thermo-lag Cable Functionality Issues. Requests That Revs to CPSES Engineering Rept ER-ME-067 Be Provided within 30 Days of Receipt of Ltr Project stage: Other ML20198Q7031997-11-0606 November 1997 Submits Response to SE Open Items Re Thermo-Lag Cable Functionality Issue,Per 970916 Telcon W/Nrc & as Stated in Ref 1 of NRC .Rev 5 to ER-ME-067 & Bisco Test Rept 748-105 Encl.Bisco Test Rept Withheld Project stage: Other ML20202H3681998-02-13013 February 1998 Provides follow-up to Licensee Re Thermo-Lag Raceway Testing.Util Has Concluded That It Is Important for Util Not Change Testing Criteria mid-stream. Commitment Made by Util,Listed Project stage: Other ML20217H3671998-04-0101 April 1998 Requests That TU Electric Respond to Staff Comments Re Thermo-Lag Raceway Testing Proposal Concerning Thermo-Lag Fire Barriers at CP Steam Electric Station,Unit 1 to Resolve Issues Prior to Start of Any Fire Endurance Tests Project stage: Other ML20151W3661998-09-0808 September 1998 Informs That Addl Thermo-Lag Testing Currently Scheduled for Last Wk in Oct 1998 at Omega Point Labs,Inc.Detailed Description of Route to Lab Can Be Downloaded or Printed from Internet Project stage: Other ML20196B7051998-11-25025 November 1998 Forwards Preliminary Fire Endurance Test Results,As Part of Action Plan for Closure of Remaining Open Items Associated with CPSES Unit 1 Thermo-Lag Fire Barriers & 980520 Confirmatory Order Project stage: Other TXX-9906, Forwards Final Fire Endurance Test Rept,Per Closure of Remaining Open Issues Re Thermo-Lag Fire Barriers as Described by Items 1 & 4 in NRC 960522 SER1999-03-0202 March 1999 Forwards Final Fire Endurance Test Rept,Per Closure of Remaining Open Issues Re Thermo-Lag Fire Barriers as Described by Items 1 & 4 in NRC 960522 SER Project stage: Other ML20205R5631999-04-15015 April 1999 Forwards Rev 6 to CPSES Engineering Rept ER-ME-067, Evaluation of Thermo-Lag Fire Barrier Sys. Rept Was Revised to Incorporate Technical Justification for Closure of Open Items 1 & 4 Described in NRC Project stage: Other IR 05000445/19990061999-04-30030 April 1999 Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Major Areas Inspected:Planning & Preparation,External Exposure Controls & Quality Assurance of Radiation Protection Activities Project stage: Request ML20206F9841999-04-30030 April 1999 Requests That NRC Return Bisco Tests & Remove Them from Docket Re Thermo-Lag Cable Functionality Issues for CPSES, Unit 1 Project stage: Other ML20206Q0031999-05-14014 May 1999 Forwards Safety Evaluation Accepting Licensee Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Steam Electric Station,Unit 1 Project stage: Approval ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 Project stage: Other 1996-11-22
[Table View] |
Text
-
M tog # TXX-97216 File # 10010
~
~
909.5 Ref # 10CFR50.48 nlELECTRIC' November 6, 1997 C. lance Terry Group Wr brsutent
. U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington. DC 20555
SUBJECT:
-COMANCHE PEAK STEAM ELECTRIC STATION (C'SES) - UNIT 1 DOCKET NO. 50-445 RLSPONSE TO SAFETY EVALUATION OPEN ITEMS ON CPSES UNIT 1 REGARDING THERM 0-LAG CABLE FUNCTIONALITY ISSUES (TAC N0. M85536)
REF:
'. )
NRC letter from Mr. Timothy J. Polich to Mr. C. Lance Terry dated October 1.1997 2)
Transcripts of meeting between NRC and TV Electric held on December 5.1996 at the NRC Region IV Office in Arlington.
Texas 3.
TU Electric letter logged TXX-97047. from Mr. C, Lance Terry, to NRC dated February 28, 1997 During the telephone conference on September 16. 1997, and as stated in Referent 1 the NRC Staff has closed open items 2. 5. 6. and 7.
The responses to open items
- 1. 3 and 4 are being provided in this letter as requested.
Open Item 1:
e Raceway at CPSES Unit I where the total enclosed thermal mass is less than the S$
total enclosed thermal mass of the tested configurations.
O f
l)
Response
y As stated via Reference 3. and discussed in the December 5. 1996 meeting with your o4 Staff. TU Electric has provided the requested cable loading information of 1 installed Unit 1 raceway barriers with respect to the matrix similar to what was
in the Engineering Report ER-ME-067 for Unit 2.
TU Electric believes that this is
, 8 c ns stent with it s commitments made during the oecember 5. 1996 meeting with
-E ui your Staff (please refer to page 20 line item 3 and page 104, line item 23 of reference 2). -Additionally, after the development of the aforementioned matrix.
TU Electr c evaluated the plant installed configurations which had less fill than
- Qy"!h W Q$
1 eg p945d
[lElElEglgl LEI
' ' " " ~
get u ggp= *~'- =
a a
TXX-97216 Page.2 of 3 the as tested configurations. The results of this evaluation are that the decrease in the thermal mass enclosed in the fire barrier will not adversely affect the ability of these barriers to perform their design function. TU Electric believes that it followed the guidance which was provided in reference 2
.(see page 21-line item 15 through 18). Please note that TV Electric does not believe that this is a ' cable functionality evaluation" as described in the October 29, 1992 criteria, but is instead structured similar to the evaluations allowed by the guidance provided in Generic Letter 86-10. TV Electric will provide further information regarding this evaluation during the scheduled November 12, 1997, meeting with the Staff in Rockville, MD.
Open Item 3:
Thermo-Lag fire stops installed in cable trays at CPSES Unit 1.
Response
TV Electric has performed an evaluation of the three different type of materials used to construct fire stops w' thin 1-hour rated fire barrier envelopes installed on Unit 1 cable trays at CPSES. This evaluation is provided in Attachment 2 to Appendix F of Engineering Report ER-ME-067. The evaluation concluded that; based on the results of the fire endurance tests listed in Section 3 of Attachment 2 of Appendix F, as augmented by the technical evaluations presented in Section 4 of of Appendix F. fire stops installed at CPSES constructed of Thermo-Lag 330-1 and BISCO SF-60 silicone elastomer materials are acceptable designs to seal terminations of Thermo-Lag protective envelopes on cable trays. Firestops constructed using Silicone Foam material will be removed or augmented with acceptable firestop material via Design Modification 97-014. Please refer to the enclosed Engineering Report ER-ME-067 Rev 5 Attachment 2 to Appendix F.
Open Item 4:
Silicone foam fire stops installed in cable trays at CPSES Unit 1, where the qualification is based on fire tests that used silicone elastomer.
Response
With respect to silicone foam after December 5,1996. TV Electric performed an extensive review of construction work packages (including design documents) and performed field walkdowns. These walkdowns concluded that of some-silicone foam fire stops are installed in CPSES Unit 1.
TU Electric will rework these silicone foam fire stops to bring them into compliance with tested configurations, i.e.,
silicone elastomer via Design Modification No.97-014, Additionally please refer to response to open item 3 above.
TXX-97216 Page 3 of 3 Additionally TV Electric has revised the Engineering Report ER-ME-067, Revision 5 of the Engineering Report eliminates detailed information not directly required to respond to the question asked by the Staff and is enclosed as enclosure 1 to this response. As requested during the September 16, 1997, conference call, BISCO Test Report 748-105 is being provided as enclosure 2.
Should you have any questions or need additional information, please contact Obaid Bhatty at (254) 897-5839 to coordinate this effort.
Sincerely,
$a$r C. L. Terry h-By:
D. Walker ' @
Rogt Regulatory Affairs Manager 08:ob Enclosures cc:
Mr. E. W. Merschoff Region IV (w/o enclosures)
Mr. J. I. Tapia Region IV (w/o enclosures)
Mr. T. J. Polich NRR Mr. K. S. West, NRR Resident Inspectors, CPSES (w/o enclosures)
ENCLOSURE 1 TO TXX-97216 ER-ME-067 Rev.5 EVALUATION OF THERM 0-LAG FIRE BARRIER SYSTEMS i
I f
i 9
~
~
.. _ _