Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199F339 + (08:15:11, 24 May 2025)
- PNO-V-86-005, on 860618,technicians Performing Initial Sys Checks of Fire Detection Sys Discovered That Internal Wiring for at Least 1 of 18 Panels Modified,Causing Damage to Internal Components + (08:15:15, 24 May 2025)
- TAC:59169 + (08:15:32, 24 May 2025)
- ML20199F266 + (08:15:34, 24 May 2025)
- ML20199F233 + (08:15:42, 24 May 2025)
- ML20199F193 + (08:15:54, 24 May 2025)
- B11990, Forwards Suppls to Annual Rept Re Changes in Jumpers,Listed Leads & Bypasses Made to Operable Sys in 1985 + (08:16:05, 24 May 2025)
- TAC:44141 + (08:16:09, 24 May 2025)
- ML20199F038 + (08:16:30, 24 May 2025)
- ML20199F036 + (08:16:31, 24 May 2025)
- ML20199E998 + (08:16:43, 24 May 2025)
- ML20199E988 + (08:16:46, 24 May 2025)
- ML20199E943 + (08:16:59, 24 May 2025)
- ML20199E886 + (08:17:12, 24 May 2025)
- ML20199E885 + (08:17:13, 24 May 2025)
- ML20199E882 + (08:17:15, 24 May 2025)
- ML20199E879 + (08:17:17, 24 May 2025)
- ML20199E821 + (08:17:35, 24 May 2025)
- ML20199E808 + (08:17:41, 24 May 2025)
- ML20199E781 + (08:17:47, 24 May 2025)
- 05000423/LER-1997-052, :on 971014,deficienies Were Identified in Performance of Surveillances for PORV Instrumentation.Caused by Procedural Deficiency.Reveiw of B Train PORV Circuity Conducted for Similar Conditions + (08:17:49, 24 May 2025)
- IR 05000498/1982002 + (08:18:02, 24 May 2025)
- ML20199E687 + (08:18:16, 24 May 2025)
- IR 05000298/1997015 + (08:18:18, 24 May 2025)
- ML20199E665 + (08:18:24, 24 May 2025)
- ML20199E655 + (08:18:29, 24 May 2025)
- ML20199E648 + (08:18:31, 24 May 2025)
- 05000285/LER-1997-015, :on 971017,unanalyzed Condition for Station Batteries Was Noted.Caused by Lack of Detailed Plant Design to Provide Supporting Info Re Requirement.Issued Operations Memo + (08:18:37, 24 May 2025)
- ML20199E619 + (08:18:43, 24 May 2025)
- ML20199E607 + (08:18:46, 24 May 2025)
- ML20199E604 + (08:18:48, 24 May 2025)
- ML20199E594 + (08:18:52, 24 May 2025)
- TAC:M83657 + (08:18:56, 24 May 2025)
- ML20199E580 + (08:18:59, 24 May 2025)
- ML20199E527 + (08:19:13, 24 May 2025)
- ML20199E509 + (08:19:21, 24 May 2025)
- 05000461/LER-1997-022-01, Forwards LER 97-022-01 & 10CFR21 Rept 21-97-036 Re Design of DG Ventilation Subsystems Outside Design Basis as Result of Failure to Include Min & Max Outside Air Temps Extremes,Due to Design Error.Ler Contains Listed Commitm + (08:19:35, 24 May 2025)
- ML20199E471 + (08:19:38, 24 May 2025)
- ML20199E441 + (08:19:50, 24 May 2025)
- ML20199E433 + (08:19:54, 24 May 2025)
- ML20199E414 + (08:20:01, 24 May 2025)
- ML20199E366 + (08:20:23, 24 May 2025)
- ML20199E355 + (08:20:30, 24 May 2025)
- ML20199E334 + (08:20:37, 24 May 2025)
- 05000259/LER-1986-007, :on 860219,discovered That Unistrut Space Frame Supports for CRD Insert & Withdraw Lines Not Adequately Supporting Drive Tubing During Dbe.Caused by Personnel Failure to Follow Design Typicals + (08:20:41, 24 May 2025)
- ML20199E274 + (08:20:56, 24 May 2025)
- ML20199E247 + (08:21:04, 24 May 2025)
- L-97-059, Interim Part 21 Rept Re Evaluation of Senior Flexonics Expansion Joints.Work on Small Piping Resource Intensive. Rept Date for Conclusions Scheduled by 980215 + (08:21:06, 24 May 2025)
- ML20199E231 + (08:21:11, 24 May 2025)
- ML20199E228 + (08:21:13, 24 May 2025)
- ML20199E197 + (08:21:23, 24 May 2025)